T 126
-
o
-In Reply Refer To:
Docket: 50-285/86-23
Omaha Public Power District
ATTN:
R. L. Andrews, Division Manager-
Nuclear Production
1623 Harney Street
Omaha, Nebraska 68102
Gentlemen:
This refers to the inspection conducted by Messrs. P. H. Harrell and M. E. Murphy
of this office during the period August 1 through September 30, 1986, of
activities authorized by NRC Operating License DPR-40 for the Fort Calhoun
Station, and to the discussion of our findings with you and other members of
your staff at the conclusion of the inspection.
Areas examined during the inspection included operational safety verification,
maintenance, surveillance, plant tours, safety-related system walkdowns,
security observations, review of the tests and experiments program, followup on
previously identified items, followup on a licensee event report, and
management organizational changes. Within these areas, the inspection
consisted of selective examination of procedures and representative records,
i
interviews with personnel, and observations by the inspector. The inspection
findings are documented in the enclosed inspection report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements.
Consequently, you are required to respond to
these violations, in writing, in accordance with the provisions of Section 2.201
of the NRC's " Rules of Practice," Part 2. Title 10, Code of Federal Regulations.
Your response should be based on the specifics contained in the Notice
of Violation enclosed with this letter.' Since it was also found during this
inspection that you had taken corrective action, including action to prevent
recurrence, for Violation A, no response to that violation need be submitted.
The material enclosed in Appendix A and Safeguards Attachment to Appendix B
contains Safeguards Information as defined by 10 CFR Part 73.21 and its
disclosure to unauthorized individuals is prohibited by Section 147 of the
Atomic Energy Act of 1954, as amended. Therefore, the material contained in
Appendix A and Attachment will not be placed in the Public Document Room.
We have also examined actions you have taken with regard to previously
identified inspection findings. The status of these items is identified in
paragraph 2 of the enclosed report.
8611130386 861107
ADOCK 05000285
G
-
_-
---
.-
RIV:
RIV.gl
EP&Q
C:EP& P
C:RPB/
C:RPB d
PHarrell:nc MMur hy RCaN
11 LYande
Dfiunte
JGagliardo
Ib/Sp/86
P/9 /86 9 / /86 6/61/86
W/h /86 l' / /86
REMOVAL OF THE PAGES MARKED " SAFEGUARDS INFORMATION"
t
_ DECONTROLS THE REMAINDER OF THIS DOCUMENT.
I
I
,
_
__
_
_ _
__
_
.-_
_ _ . . _ _ _ . _ _ . _ . - _ . _ _ _
,
.
,
.
!
Y
~
,
Omana Public Power District
-2-
l
One unresolved item is identified in paragraph 11 of the enclosed inspection
report.
i
The response directed by this letter and the accompanying Notice is not subject
to the clearance procedures of the Office of lianagement and Budget as required
j
by the Paperwork Reduction Act of 1980, PL 96-511.
Should you have any questions concerning this inspection, we will be pleased to
.
discuss them with you.
j
l
Sincerely,
,
>
ORIGINAL SIGNED BY:
l
J. E. Gagliardo, Chief
Reactor Projects Branch
$
Enclosures:
1
1.
Appendix A - Notice of Violation
which is Safeguards Information
.
l
2.
Appendix B - NRC Inspection Report
50-285/86-23
,
3.
Safeguards Attachment to Appendix B
U
i
cc report w/o Appendix A which is safeguards information and Safeguards
l
Attachment to Appendix B:
l
W. G. Gates, Manager
l
Fort Calhoun Station
i
P. O. Box 399
!
Fort Calhoun, Nebraska 68023
i
l
Harry H. Voigt, Esq.
LeBoeuf, Lamb, Leiby & MacRae
'
i
1333 New Hampshire Avenue, NW
i
Washington, DC 20036
)
Kansas Radiation Control Program Director
i
Nebraska Radiation Control Program Director
i
bcc: Copy of entire report maintained in RIV Security Files and sent to:
G. McCorkle, NMSS
J. Gibson, SSPD/NRR
j
IE File
Resident Inspector
j
R. D. Martin, RA
Security Inspector
Chief. EPSPS
D. Powers, E0
i
R. L. Bangart
REMOVAL OF THE PAGES MARKED " SAFEGUARDS INFORMATION_"_
l
l
DECONTROLS THE REMAINDER OF THIS DOCUMENT,
'
_ . . . _ _ _ _ . _ _ - . . . _ _ _ _ . . . . _ . , _ _ _ _
.
.
,
._ ,. _. _ ,. _ _ ,,.., _ _ _
-
w
.
Omaha Public Power District
-3-
bcc: RIV - Copy of report w/o Appendix A which is Safeguards Information and
Safeguards Attachment to Appendix B and w/766:
RPB
D. Weiss, LFMB (AR-2015)
Section Chief (RPSB)
RIV File
MIS
RSTS Operator
R&SPB
bec: RIV - Copy of report w/o Appendix A which is Safeguards Information and
Safeguards Attachment to Appendix B w/o 766:
MB-IE04
E.H. Johnson, DRS&P
R_EMOVAL OF THE PAGES MARKED " SAFEGUARDS
DECONTROLS THE REMAINDER OF THIS DOCUMENT.