Physical Security, Training & Qualification, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation II Plan, Revision 19A to Support NRC Review of the Physical Security Plan Revision and License Amendment Request.
ML20213B743
Person / Time
Site: Pilgrim
Issue date: 07/22/2020
From: Sterdis A
Holtec Decommissioning International
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
Download: ML20213B743 (6)


Text

SAFEGUARDS INFORMATION Krishi,a P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 H Q LT E C ------'"----------Te-,e-p-ho-ne_(_85-6)-7-97--0-90-0 DECOMMISSIONING Fax (856) 797-0909 INTERNATIONAL July 22, 2020.*

10CFRS0.90

.10 CFR 50.54(p) 10 CFR 73.SS(r)

U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

Subject:

References:

Pilgrim Nuclear Power Station Renewed Facility License No. DPR-35 NRC Docket Nos. 50-293 and 72-1044 Pilgrim Physical Security; Training & Qualification, Safeguards Contingency Plan, and Independent Spent Fuel Storage Inst1;1llation II Plan, Revision 19A to Support NRC Review of the Physical Security Plan Revision and License Amendment Request Incorporating Addition~! Independent Spent Fuel Storage Installation

[1]

Letter from Holtec Decommissioning International, LLC to U.S. Nuclear Regulatory Commission - "Physical Security Plan Revision and License Amendment Request to

_ Incorporate Additional Independent Spent Fuel Storage Installation," April 2; 2020.. -

(ML20136A038)

[2]

US Nuclear Regulatory Commission to Holtec Decommissioning International, Ll.C "Pilgrim Nuclear Power Station - Acceptance of Requested License Action PhysicatSecurity Plan Revision and License Amendment Request to Incorporate Additional Independent Spent Fuel Storage Installation with Requests for Additional Information, (EPID: L-2020-LLA-0070), May 26, 2020 (ML20142A242)

[3]

Letter from Holtec Decommissioning International, LLC to U.S. Nuclear Regulatory

  • Commission "Response to NRC Request for Infonnation on Physical Security Plan Revision and License Amendment Request to Incorporate Additional Independent Spent Fuel Storage Installation," June 25, 2020 (ML20188A061)

[4]

Letter from Holtec Decommissioning International, LLC to U.S. Nuclear Regulatory Commission- "Pilgrim Physical Security, Training & Qualification and Safeguards Contingency Plan, Revision 19," July 21, 2020 On April 2, 2020, Holtec Decommissioning International, LLC (HDI) submitted a proposed revision to the Pilgrim Nuclear Power Station (PNPS) Physical Security Plan (PSP) and a License Amendment Request (LAR) to incorporate an additional Independent Spent Fuel Storage Installation (ISFSI) at the site (Reference 1). On May 26, 2020, the U.S. Nuclear Regulatory Con1rnission (NRC) Office ofNuclear Material Safety and Safeguards (NMSS) confirmed that the NRC Staff had completed its acceptance review of the LAR to determine if the technical information provided was sufficient to allow the NRC staf( to complete its detailed technical review (Reference 2).

NOTE: THE ENCLOSURES TO THIS LEITER CONTAIN "SAFEGUARDS INFORMATION' AND MUST BE PROTECTED ACCORDINGLY. UPON REMOVAL OF THE'ENCLOSURES THIS LEITER IS. DECONTROLLED."

HDI-PIL-20-049 Page 1 of3 SAFEGUARDS INFORMATION S*oD}

/J t-1 s z l.,o

µ /tK.

µH55

SAFEGUARDS INFORMATION Krishna P. Singh Technology Campus, 1 Holtec Blvd.,.Camden, NJ 08104 HOLTE c--------------"------Te-le-ph-o-ne-(8_5_6)-7-97--0-90-0 DECOMMISSIONING Fax (856) 797-0909 INTERNATIONAL Reference 2 confirmed the NRC had detennined that the proposed LAR provided sufficient technical information to enable the NRC staff to initiate a detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and protection of public health and safety and the environment. Reference 2 also identified three requests for additional information (RAJ). HDI responses to the RAis were provided in Reference 3.

With respect to RAI #3, the NRC requested a full copy of the proposed PSP, to allow for the staff to complete its technical review of the amendment application. RAI #3 also identified that if any PSP changes were implemented in the future, prior to completion of the amendment application review, then those changes were also requested to be submitted to the NRC.

On July 8, 2020, Pilgrim Station implemented Revision 19 of the PSP. In accordance with 10 CFR 50.54(p)(2), HDI submitted PSP Revision 19 (Reference 4). Consistent with RAI #3, HDI is hereby submitting a full copy of proposed PSP Revision 19 A, which includes Appendix D and the associated security requirements applicable to the new ISFSI II cask storage pad.

Enclosures 1 and 2 to this letter provide a redline strike-out and a clean copy of proposed Pilgrim PSP Revision 19A. Enclosure 3 provides a compact disk (CD) that provides an electronic copy of Enclosures 1 and 2. These enclosures contain "Safeguards Information" as defined by IOCFR 13.22 arid disclosure to unauthorized inoividuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended, and must be protected accordingly.

Pursuant to 10 CFR 50.91, Notice for public comment; State consultation," paragraph (b), a non-safeguards copy of this submittal is being provided to the Commonwealth of Massachusetts, Emergency Management Agency.

This letter contains no new regulatory commitments.

If you have any questions or need further information, please contact me at (856) 797-0900, ext. 3813.

I declare under the penalty of perjury that the forgoing is true and correct.

Executed on July 22, 2020.

Sincere&,

A L

Olgltaltysfgned by Andrea L Sterdls n rea ON: "l"Andrea L st,rdls. c=US, o..HDI, ow:Heltee St d *

~IMlssloning lrt.ernatklnal, er 1s

~=~;=.~~=~:o~~

Andrea L. Sterdis HDI Vice President, Regulatory and Environmental Affairs Holtec Decommissioning International, LLC NOTE: THE ENCLOSURES TO THIS LETTER CONTAIN "SAFEGUARDS INFORMATION' AND MUST BE PROTECTED ACCORDINGLY. UPON REMOVAL OF THE ENCLOSURES THIS LETTER IS DECONTROLLED."

HDI-PIL-20-049 Page 2 of3 SAFEGUARDS INFORMATION

SAFEGUARDS INFORMATION Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 HOLTE c--------------Te-le-p-ho-ne_(_85-6-)7_9_7--09-00 DECOMMISSIONING Fax (856) 797-0909 INTERNATIONAL Enclosures

[I]

Pilgrim Physical Security, Training & Qualification, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation II Plan, Revision 19A, Redline Strikeout Copy (Safeguards Infonnation)

[2]

Pilgrim Physical Security, Training & Qualification, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation II Plan, Revision 19A, Clean Copy (Safeguards Infonnation)

[3]

Compact Disk Containing Enclosures 1 and 2 (Safeguards Infonnation) cc:

(without Enclosures)'

NRC Regional Administrator - Region I NRC NMSS Project Manager (Pilgrim Nuclear Power Station)

Director, Massachusetts Emergency Management Agency NOTE: THE ENCLOSURES TO THIS LETTER CONTAIN "SAFEGUARDS INFORMATION' AND MUST BE PROTECTED ACCORDINGLY. UPON REMOVAL OF THE ENCLOSURES THIS LETTER IS DECONTROLLED."

HDI-PIL-20-049

  • Page 3 of3 SAFEGUARDS INFORMATION

SAFEGUARDS INFORMATION Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 H O LT E ( _____ _;;,_ __ ____::_:__....:,__ ___

T_el-ep-ho_n_e -(85_6_) 7-97--0-9-00.

DECOMMISSIONING Fax (856) 797-0909 INTERNATIONAL to HDI-PIL-20-049 Pilgrim Physical Security;Training & Qualification, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation II Plan, Revision 19A Redline Strikeout Copy -

(Safeguards Information)

(209 total pages including cover page)

NOTE: ENCLOSURE 1 TO THIS LETTER CONTAINS "SAFEGUARDS INFORMATION' AND MUST BE PROTECTED ACCORDINGLY. UPON REMOVAL OF THE ENCLOSURE THIS LETTER IS DECONTROLLED." to HDI-PIL-20-049 Page 1 of209 -

SAFEGUARDS INFORMATION

SAFEGUARDS INFORMATION Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 H Q LT E C --------------T-el-ep-ho_n_e

(-85_6_) 7-97--0-9-00 DECOMMISSIONING Fax (856) 797-0909 INTERNATIONAL to HDI-PIL-20-049 Pilgrim Physical Security, Training & Qualification, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation II Plan, Revision 19A Clean Copy (Safeguards Information)

(209 total pages including cover page)

NOTE: ENCLOSURE 2 TO THIS LETTER CONTAINS "SAFEGUARDS INFORMATION' AND MUST BE PROTECTED ACCORDINGLY. UPON REMOVAL OF THE ENCLOSURE THIS LETTER IS DECONTROLLED." to HDI-PIL-20-049 Pagel of209 SAFEGUARDS INFORMATION

SAFEGUARDS INFORMATION Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 H Q LT E C -------'----___;;.:_--'-----Te-le-ph-o-,-ne-(8_5_6)-7-97--0--'-9-00 DECOMMISSIONING Fax (856) 797-0909 INTERNATIONAL to HDI-PIL-20-049 Compact Disk Containing:

  • Enclosure 1 - Pilgrim Physical Security, Training & Qualification, Safeguards Contingency Plan, and Independent SpeJ:!.t Fuel Storage.Jnstallation II Plan,

-Kevisfon 19A, Redline Strikeout Copy (Safeguards Inform~tion)

  • Enclosure 2 - Pilgrim Physical Security, Training & Qualification, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation II Plan, Revision 19A, Clean Copy (Safeguards Information)