Ack Receipt of in Response to 860418 Notice of Violation from Insp Rept 50-285/86-03.Addl Info Requested for Violation 285/8603-01 within 30 Days of Ltr Receipt
ML20212C264
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 12/19/1986
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Andrews R
OMAHA PUBLIC POWER DISTRICT
Shared Package
ML20212C269 List:
References
NUDOCS 8612290434
Download: ML20212C264 (2)


See also: IR 05000285/1986003

Text

,,

_-.__.--- _ _ __

, .

.,

DEC 191906

In Reply Refer To:

l

Docket: 50-285/86-03

'

!

Omaha Public Power District

i

ATTN:

R. L. Andrews, Division Manager-

Nuclear Production

i

1623 Harney Street

i

Omaha, Nebraska 68102

Gentlemen:

Thank you for your letter of May 18, 1986, in response to our letter and

Notice of Violation dated April 18, 1986. . As a result of our review of your

response, we find the response to the concerns raised in Violation 285/8603-02

to be adequate. However, our review of Violation 285/8603-01 indicates that

additional information, as discussed with your Ms. D. Hunderloh at the site on

December 8, 1936, is required.

The additional information requested is listed below:

a.

Do records exist that indicate FO-118 was provided as a Stockham

,

l

valve by the diesel generator supplier?

b.

Do records exist that indicate F0-116, F0-117, and F0-119 were

provided as Crane valves by the diesel generator supplier?

c.

If the answer to a. and/or b. above is no, do you have records to

show that the valves were properly receipt inspected and installed

in accordance with approved design changes?

d.

If the answer to c. above is no, have you performed an engineering

evaluation to verify that the valves installed in this

safety-related system can perform their intended safety function?

Please provide the supplemental information listed above within 30 days of the

date of this letter. Your response should include what actions you plan to

take and the schedule of when the au+1ons will be completed.

aincerely.

Oricha! r!4nM Cy

9612290434 861219

J'E'O"

o

PDR

ADOCK 05000285

O

PDR

J. E. Gagliardn, Chief

Reactor Projects Branch

,

!

cc:

(seenextpage)

PI:RPB/g)/

C:RPB/M

C:RPB

q

M

T

g

MEMurphy:cs

DRHuntYr

JEGagli

o

Of

12/j//86

12 $ /86

12/N/8

g

'

"

..

.

.

. .,

.

V

.- 4

,

Omaha Public Power District-

-2-

,

cc:

W. G. Gates, Manager

Fort Calhoun Station

P. O. Box 399

Fort Calhoun, Nebraska .68023

Harry H. Voigt, Esq.

LeBoeuf, Lamb, Leiby & MacRae

1333 New Hampshire Avenue, NW

Washington, DC 20036

Kansas Radiation Control Program Director

Nebraska Radiation Control Program Director

bcc to DMB (IE01)

bec dist:ib by RIV:

RPB

Resident Inspector

R. D. Martin, RA

R&SPB

SectionChief(RP8/B)

RSB

RIV File

DRS&P

D. Weiss,LFMB(AR-2015)

MIS SYSTEM

RSTS Operator

ProjectInspector(RPB/B)