OCT 231986
In Reply Refer To:
Docket: 50-285/86-25
Omaha Public Power District
l
ATTN:
R.-L. Andrews, Division Manager-
Nuclear Production
1623 Harney Street
Omaha, Nebraska 68102
l
l
Gentlemen:
This refers to the inspection conducted by Dr. J. B. Nicholas of this office
during the period September 8-12, 1986, cf activities authorized by NRC
Operating License DPR-40 for Fort Calhoun Station, and to the discussion of our
findings with you and other members of your staff at the conclusion of the
inspection.
'
Areas examined during the inspectio, included liquid and gaseous radioactive
l
waste management programs. Within these areas, the inspection consisted of
selective examination of procedures ..nd representative records, interviews with
personnel, and observations by the itspector.
The inspection findings are
documented in the enclosed inspection report.
Within the scope of the inspection, r3 violations or deviations were
identified.
We have also examined actions you have taken with regard to previously
identified inspection findings.
The status of these items is identified in
paragraph 2 of the enclosed report.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
ORIGINAL SIGNED BY:
J. E. Gagliardo, Chief
Reactor Projects Branch
Enclosure:
(see next page)
RIV:FRPS
C:FRPS
C:R&SPB
C: f
C:RPB y ,
(4BNicholas/lw
BMurray
WLFisher
DRF nter
l
JRGag/(idrdo
. / /86
Q/
86
f() /l7/86
(0/fA/86
r/n 6
h03
15 861023
0
CK 05000285
/,
I
I
'Y
\\
_
______
________
,
Omaha Public Power District
-2-
Enclosure:
Appendix - NRC Inspection Report
50-285/86-25
cc w/ enclosure:
W. G. Gates, Manager
Fort Calhoun Station
P. O. Box 399
Fort Calhoun, Nebraska 68023
Harry H. Voigt, Esq.
LeBoeuf, Lamb, Leiby & MacRae
1333 New Hampshire Avenue, NW
20036
Kansas Radiation Control Program Director
Nebraska Radiation Control Program Director
bcc to DMB (IE06)
bec distrib. by RIV:
- RPB
- Resident Inspector
R. D. Martin, RA