Forwards Requalification Exam Rept 50-285/OL-87-01 Administered on 861118.Facility Requalification Training Program Unsatisfactory.Nrc Concurs W/Util Proposed Corrective Actions & Implementation Schedule,Per
ML20211A110
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 02/11/1987
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Andrews R
OMAHA PUBLIC POWER DISTRICT
Shared Package
ML20211A114 List:
References
NUDOCS 8702190093
Download: ML20211A110 (2)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

In Reply Refer To:

gi%

)

Docket:

50-285/0L-87-01 1

Omaha Public Power District l

ATTN:

R. L. Andrews, Division Manager -

h Nuclear Operations 1623 Harney Street Omaha, NE 68102 l

Gentlemen:

SUBJECT:

REQUALIFICATION EXAMINATION REPORT, FORT CALHOUN STATION (FCS) i On November 18, 1986, NRC administered examinations to employees currently licensed to operate your FCS facility. At the conclusion of the examinations, l

the examination keys were provided to facility staff personnel and preliminary findings were discussed with those members of your staff identified in the enclosed report. As a result of these examinations, the FCS requalification training program was evaluated as unsatisfactory for the purposes of certifying the proficiency of a licensed operator to receive license renewal.

Further, licensed operators who have not been evaluated by NRC within the past 2 years must be removed from licensed duties until a proficiency examination can be administered by NRC. Licensed operators affected by this requirement have been identified to OPFD and the affected FCS personnel. Until further notice, all examinations to determine proficiency for continued performance of licensed duties and for license renewal will be prepared and administered by NRC.

On December 22, 1986, NRC met with OPPD management to review the FCS requalification training program deficiencies and proposed corrective actions.

OPPD followed up with a letter, dated January 23, 1987, committing to a schedule of specific corrective actions.

NRC concurs with the OPPD proposed corrective actions and schedule of implementation.

Should you have any questions concerning this letter, please contact us.

Sincerely, Original Signed by::

j g, GAGUARDO i

h h h hB5

/

870219A l

$DR PDR J. E. Gagliardo, Chief l

Reactor Projects Branch

Enclosure:

Examination Report 50-285/0L-87-01 cc:

(See next page) h RSB(Acting) b RIV:05b OS RPB gg SMcCrory RACooley RElreland JFGagliardo

} /[o/87 2./l0/87 Q /87 7 /#/87 g[Q

k Omaha Public Power District 2

W. G. Gates, Manager Fort Calhoun Station P. O. Box 399 Fort Calhoun, Nebraska 68023 Harry H. Voigt, Esq.

LeBoeuf, Lamb, Leiby & MacRae 1333 New Hampshire Avenue, NW Washington, D. C.

20036 Kansas Radiation Control Program Director Nebraska Radiation Control Program Director bec to DMB (IE42) bcc distrib. by RIV:

  • RPB
  • RRI
  • R&SPB
  • Section Chief (RPB/B)
  • RIV File DRSP
  • RSB
  • Project Inspector D. Weiss, RM/ALF R. D. Martin, RA
  • R. Hall R. Cooley S. McCrory E. Haycraft l

l l

_s

... _.. -.. _ _.. _.