Text
,
,
e NIvq'o
UNITED STATES
'
NUCLEAR HEGULATORY COMMISSION
g
8
REGloN lil
r,
1;;
e
801 WARRENVILLE ROAD
2
lisle. ILLINols 60532 4351
~%
/
0****
Au9ust 13, 1999
Mr. Oliver D. Kingsley
President, Nuclear Generation Group
Commonwealth Edison Company
ATTN: Regulatory Services
Executive Towers West lli
1400 Opus Place, Suite 500
Downers Grove,IL 60515
SUBJECT:
QUAD CITIES INSPECTION REPORT 50-254/99011(DRP);
50-265/99011(DRP)
Dear Mr. Kingsley:
On July 20,1999, the NRC completed an inspection at your Quad Cities Units 1 and 2 reactor
facilities. The results were discussed with Mr. Dimmette and other members of your staff. The
enclosed report presents the results of that inspection.
j
The inspection was an examination of activities conducted under your license as they relate to
'
safety and to compliance with the Commission's rules and regulations and with the conditions
of your license. Within these areas the inspection consisted of a selective examination of
procedures and representative records, observations of activities, and interviews with
personnel. Specifically, this inspection focused on reactor safety.
Based on the results of this inspection, NRC identified several issues which were categorized
as being of low risk significance. These issues have been entered into your corrective action
'
program. Two of these issues involved non-cited violations of regulatory requirements. These
issues are listed in the summary of findings and are discussed in the report. If you contest
,
these non-cited violations, you should provide a response within 30 days of the date of this
inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN:
Document Control Desk Washington DC 20555-0001, with copies to the Regional
Administrator, Region 111, the Director, Office of Enforcement, United States Nuclear Regulatory
Commission, Washington, DC 20555-0001, and the NRC Resident inspector at the Quad Cities
facility.
9908170201 990813
ADOCK 05000254
G
r:
1
-
1
.
,,
l
l
O. Kingsley
-2-
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its
enclosure, and your response, if you choose to provide one, will be placed in the NRC Public
Document Room.
Sincerely,
/s/ M. A. Ring
Mark A. Ring, Chief
Reactor Projects Branch 1
l
Docket Nos. 50-254; 50-265
Enclosure:
Inspection Report 50-254/99011(DRP);
50-265/99011(DRP)
cc w/ encl:
D. Helwig, Senior Vice President
C. Crane, Senior Vice President, Nuclear Operations
H. Stanley, Vice President, Nuclear Operations
R. Krich, Vice President, Regulatory Services
DCD - Licensing
J. Dimmette, Jr., Site Vice President
G. Barnes, Quad Cities Station Manager
C. Peterson, Reguictory Affairs Manager
M. Aguilar, Assistant Attorney General
State Liaison Officer, State of Illinois
State Liaison Officer, State of Iowa
i
Chairman, Illinois Commerce Commission
W. Leech, Manager of Nuclear
i
MidAmerican Energy Company
l'
DOCUMENT NAME: G:\\ QUAD \\QUA99011.DRP
To recolve a co py of this document Indicato in the box: "C" = Copy w/o attach /enci "E" = Copy w/ attach /enct "N" = No copy
OFFICE
Rlll:DRP
f
Rill:DRP
lE
l
l
NAME
Lerch/co/kic'#1 Ring %2'
DATE
08/ iL/99 W
08/ n /99
OFFICIAL RECORD COPY
u
!
'
.
i-
!
!
l
1
l
O. Kingsley
-3-
Distribution:
l
AJM (E-Mail)
l
RPC (E-Mail)
l
Project Mgr., NRR w/enci
M. Branch, NRR w/enci
l
'J. Dyer, Rill w/enci
J. Caldwell, Rlli w/enci
B. Clayton, Rill w/enci
SRI Quad Cities w/enci
i
DRP w/ encl
l
DRS w/enci
l
Rill PRR w/enci
PUBLIC IE-01 w/ encl
,
Docket File w/enci
i
GREENS
LEO (E-Mail)
i
DOCDESK (E-Mail)
>
l
l
l
l
l
l.
l
i
\\
l
1
l
170052
\\
i
I
L-