ML20210N213

From kanterella
Jump to navigation Jump to search
FOIA Request for Copy of Written Approval for Public Meeting Scheduled for 970414 to Discuss NMP Unit 1 Core Shroud Insp
ML20210N213
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 07/28/1997
From: Lochbaum D
UNION OF CONCERNED SCIENTISTS
To: Beecher W
NRC OFFICE OF PUBLIC AFFAIRS (OPA)
Shared Package
ML20210N197 List:
References
FOIA-97-280 NUDOCS 9708250135
Download: ML20210N213 (1)


Text

_

M FOWPAREQUEST UN10N OF w.

99.-c w

/.9

)

mhdadCase:

July 28,1997 Mr. William M. Bucher Director. Osce of Public Agairs Unlied Stases Nuclear Regulamry Commlulon Washlagees, DC 20$$$-0001 SUBBCri NaC PUBIJC MER11NGs

Dear Mr. Beecher:

l Rank you fbr your prompt reply to my letter of July 2d,1997, relanting procedures and policies for l

NRC public meetings. Yoer response indicates eat thus is no established procedure or policy covedag the vosobedulias of a public masting, it seems that in abeemos of snok a specino procedure or pony for ru obedaling, the saladna procedure on sehedelias/announcias pebile messags would be la effect. If this reasonable assumption is inconsistent with NRC practice, please infona let me know.

la your response, you spesif,ed that approvel ls writing by b appropriate breach chief or high level manager is required for public meetings that need to be sobeduled la less than 10 ders. ! call your assentien to NRC Press Aalease No. I.9746 dated April 9,1997. As this press release indicanes, a public messing sabedaled for 6e following day, April 10,1997, in ibe White Flat esses to disous se Nias Mile Point Unit 1 core shroud inspection was resobeduled for the following Monday, April 14,1997, la Feitos, New Yoik. since this public messing wm announced less the 10 calendar days rf 7 in advance, I respectfuly request, pursuant to the Freedom ofInformation Act, a oopy of ibe wriansa j( approval. _

In your response, you indicated that " members of the public must obsma pdor Commission approval" to speak danas a Commission meeting to allow "NRC business to be administered la a fair and orderty fashina? I will give you " orderly,' but I deeph resent your charassariassian of eis NRC pressies as " fair? I formally asked the Commission Apr permission to outline our sonneras on austear safety at Maine Yankes during the February 4,1997, Coasmission brienas. I asked for 15 mientes te cover my maserial. I was granted 5 minutes. Pdor to the meeting, I was instsveted by a member of the Osce of es scoretary not to go ova 8 minates. I rushed through my abbrevissed maserial in order to avoid the smiberraessant of bang out off la mid. presentation, a fate whink one of my sneessaars, Mr.

Raymond shadis, susseed. Prior to our pr==*=tana, both the Maine Yankee liosasse med the NRC stad went well over their allotied presentation does without any consequence. ' Fair" is densed in my dictionary as "Aus aus favor toward sibr or any side? NRC's public meeting me simply not fair to the public s

y, NCluM 0*

David A. '" - - - -

Nuclear Safety Enginest 9708250135 970820 PDR FOIA LOCHBAt197-280 PDR

' washsgeen oase; 1sts P aseet NW Sube lie WhaNneum oc 200se 1466. Set ss24eGe

  • PAK: 20:4ss Dee6 cannonsee omse: h e essee seusce cemensee taA _ osassweios e174474ess pax: etTes&osos coalemis Oftee. 3447 themask Avenn owen pas annisier cA e47041ser 3104431473. PAX: st0448 4fes

5942b f,

  • j UNITWO STATES

[

NUCLEAR REGULATORY COMMIS810N WASH 6tet?008.o.o.sen Mem

\\s e

Apell 3, 1997 e

e MEMORA2 UM 10:

5. 51 hBajwa,Acti Otrector ProjeNOtrectorateN1 OlvisionofReactorProjects-1/l!

FROM:

Darl Hood Senior Project ManafHr Pro;lect 0\\ rectorate 1-1

  • p5 Olvi sion of Reactor Projecrs - 1/l!

SUBJECT:

FORTHCOMIM MEETING WITH N!AGARA F.JHAWK POWER CORPORATION l

RELATED To HINE MILE POINT NUCLEAR STATION, UNIT NO. I DATE AND TIME:

April 10,1997 l

9:00 a.m. to 1:00 p.m.

LOCA110N:

U.S. Nuclear Regulatory Commission One White F1 tnt North 11555 Rockville Pike Rockville Room 1FfMaryland20852 9

PURPOSE:

To discuss Niagara Mohawk Power Company's (WPC)in view of Ovaluations and conclusions regarding core shroud integrity inspection results that revealed 1 cracks in the heat affectedzonesofhorizontalandv(er)ticalweldsand(2) core shroud stabillzer anomalies that reduced the intended pre-Ioad. The discussions will include acceptance criteria, methodology \\ons regar, ding continued opera, tion. pection plans, resvits corrective actions reins and conclus The licensee 0"iOO33 h(01 3

O

.o om.

g.

will also discuss its root cause determination and operability deteretnation for the core throud during the previous operating cycle.

PARilCIPANT5:

HE 191[1 C. Lalnas

5. Wajwa R. At,tio t t B. 5 heron R. Fraha M. McCormick R. Wessman
f. Green C. Terry J. Strosnider D. Hood N. Radanacher K. Wichman W. Gleaves R. Cortert R. Hermant)

L. Doerflein (RI)

G. Inch M. Banic

5. Adams (RI)

W. Yages K. Manoly T. Belch (RI)

J. Hetninway (Gl) l J. Rajan et al.

J. Charnley (GI)

C. Carpentar et al.

l W Koo Docket No. 50-220 cc:

See next page CONTACT: Dar1 Hood 415 3049

  • Meetings between NRC techntcal staf f and appltoants or 1icen ces ate open for interested members of the public, petitioners, Intervenors, or other parties to attend as observers pur' Jant to 'Consission Policy 5tatement on St af f Meetings Open to the Public' 59 fadt ul h al u tt 48340, 9/70/94 DOCUMENT NAME:NMPl\\NMl410. mig To receive a copy of this document, indicate in the box:

'C'. Copy without attachment /erclosure

'C'. Co)y with attachaert/ enclosure

'N'

. No rany wein emini i I

    • imui I

simi-i.. O I

I I_

swa ow soier is.j. Vi' (

6All h/J /97 Wi j sti ktj pel

~

h/ #97 w

197 Of fici al Record Copy

9 4

.t.

will also discuss its root cause determination and operability determinetton for the core shroud during the previous operating cycle.

PARTICIPANTS:

Et g

G. Lainas S. Bajwa R. Abbott B. Sheron R. Frahm M. McCornick l

R. Wessman T. Green C. Terry J. Strosnider D. Hood N. Radanacher l

K. Wichman W. Gleaves R. Corteri R. Herman L. Doerflein (RI)

G. Inch M. Banic S. Adams (RI)

W. Yager K. Manoly T. Belch (RI)

J. Hetninway (GE)

J. Rajan et al.

J. Charnley (GE)

C. Carpenter et al.

W. Koo l

Docket No. 50-220 cc: See next page CONTACT: Darl Hood 415-3049

  • Meetings between NRC technical staff and applicants or licensees are open for interested members of the pubitc petitioners, intervenors, or nther parties to attend as observers sursuant to 'Comission Policy Statement on Staff Meetings Open to the Pu)11c' 59 Federal Reatster. 48340, 9/20/94.

/

Niagara Mohawk Power Corporation Nine Mile Point Nuclear Station Unit No. I cc 4

Mr. 8. Ralph Sylvia Resident inspector Executive Vice President U.S. Nuclear Regulatory Commission Generation Business Group P.O. Box 126 and Chief Nuclear Officer Lycoming, NY 13093 Niagara Mohawk Power Corporation Nuclear Learning Center Charles Donaldson, Esquire 450 Lake Road Assistant Attorney General Oswego, NY 13126 New York Department of Law 120 Broadway Mr. Richard 8. Abbott New York, NY 10271 Vice President and General Manager -

Nuclear Mr. Paul D. Eddy Niagara Mohawk Power Corporation State of New York Nine Mile Point Nuclear Station Department of Public Service i

P.O. Box 63 Power Division, System Operations Lycoming, NY 13093 3 Empire State Plaza Albany, NY 12223 Mr. Martin J. McCormick, Jr.

Vice Prerident Mr. F. William Valentino, President Nuclear Safety Assessment New York State Energy, Research, and Support and Development Authority Niagara Mohawk Power Corporation Corporate Plaza West Ni t Mlle Point Nuclear Station 286 Washington Avenue Extension P.O. Box 63 Albany, NY 12203-6399 Lycoming, NY 13093 Mark J. Wetterhahn Esquire

{

Mr. Kim A. Dahlberg Winston & Strawn General Manager - Projects 1400 L Street, NW Niagara Mohawk Power Corporation Washington, DC 20005-3502 Nine Mlle Point Nuclear Station P.O. Box 63 Supervisor I

Lycoming, NY 13093 Town of Scriba Route 8. Box 382 Mr. Norman L. Radesacher Oswego, NY 13126 Plant Mana<pr Unit 1 i

Nine Mile Point Nuclear Station Gary D. Wilson, Esquire P.O. Box 63 Niagara Mohawk Power Corporation Lycoming, NY 13093 300 Erie Boulevard West Syracuse, NY 13202 Ms. Denise J. Wolniak Manager Licensing Niagara Mohawk Power Corporation Nine Mile Point Nuclear Station P.O. Box 63 Lycoming, NY 13093 Regional Administrator, Region !

U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406

/ =,6, Y

}

Heatina Motice E-Mail R. Zir..arsan (RPZ)

5. Varpa (SAV J. Zwo,inskt )
5. Bajwt D. Hood S. Little E. Jordan (e-mailtoJKR) l OPA (e-mail to OPA) l G. Lainas B. Sheron R. Wessaan J. Strosnider K. Wichman R. He man M. Banic K. Manaly l

J. Rajan C. Carpenter W. Koo R. Fraha T. Green W. Gleaves L. Doorflein, RI S..Unes, RI T. Belch, RI C. Cowgill, RI W. Dean (WPO)

'. Screnct (DPS)

<rdts (Neeting Announcement Coordinator)

Hard Cony Docket File

.i PUBLIC P01-1 Reading OCC ACRS Receptionist (OWIN)

mesog a

p t

UNITED STATES

j.

Ij NUCLEAR REGULATORY COMMISSION E

WASHINGTON, D.C. 30tNW001

\\...../

April 3, 1997 CANCELLED fTO BE RESCHEDULED APRIL 14. 1997 IN OSWEGO. NY) l MEMORANDUM TO:

S. Singh Bajwa, Acting Director l

Project Directorate I-1 Division of Reactor Projects - I/II FROM:

Darl Hood, Senior Project Manager ORIGINAL SIGNED BY Project Directorate I-1 Division of Reactor Projects - I/II

SUBJECT:

FORTHCOMING HEETING WITH NIAGARA M0 HAWK POWER CORPORATION RELATED TO NINE MILE POINT NUCLEAR STATION, UNIT NO. 1 DATE AND TlHE:

April 10, 1997 9:00 a.m. to 1:00 p.m.

I LOCATION:

U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, Maryland 20852 Room 1 F 7-9 PURPOSE:

To discuss Niagara Mohawk Power Company's (NMPC) evaluations and conclusions regarding core shroud integrity in view of inspection results that revealed (1) cracks in the heat affected zones of horizontal and vertical welds and (2) core shroud stabilizer anomalies that reduced the intended pre-load. The discussions will include acceptance criteria, methodology, results, corrective actions, reinspection plans, and conclusions regarding continued operation.

The licensee n i,& +

C

.. will also discuss its,*oot cause determination and operability determination for the core shroud during the previous operating cycle.

PARTICIPANTS:

NHL NMEL G. Lainas S. Bajwa R. Abbott B. Sheron R. Frahm M. McCormick

-R. Wessman T. Green C. Terry J. Strosnider D. Hood N. Radamacher K. Wichman W. Gleaves R. Corieri R. Herman L. Doerflein (RI)

G. Inch M. Banic S. Adams (RI)

W. Yager K. Manoly T.' Belch (RI)

J. Hetninway (GE)

J. Rajan et al.

J. Charnley (GE)

C. Carpenter et al, W. Koo Docket No. 50-220 cc:

See next page CONTACT: Darl Hood 415-3049

  • Meetings between NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers aursuant to " Commission Policy Statement on Staff Meetings Open to the Pu)lic" 59 Federal Reaister 48340,9/20/94.

j G

Niagara Mohawk Power Corporation Nine Mile Point Nuclear Station Unit No. I cC' Mr. B. Ralph Sylvia Resident Inspector Executive Vice President U.S. Nuclear Regulatory Commission Generation Business Group P.O. Box 126 and Chief Nuclear Officer Lycoming, NY 13093 Niagara Mohawk Power Corporation Nuclear Learning Center Charles Donaldson, Esquire 450 Lake Road Assistant Attorney General Oswego, NY 13126 New York Department of Law 120 Broadway Mr. Richard B. Abbott New York, NY 10271 Vice President and General Manager -

Nuclear Mr. Paul D. Eddy Niagara l'Ohawk Power Corporation State of New York Nine Mile Point nuclear Station Department of Public Service P.O. Box 63 Power Division, System Operations Lycoming, NY 13093 3 Empire State Plaza Albany, NY 12223 Mr. Martin J. McCormick, Jr.

Vice President Mr. F. William Valentino, President Nuclear Safety Assessment New York State Energy, Research, and Support and Development Authority Niagara Mohawk Power Corporation Corporate Plaza West Nine Mile Point Nuclear Station 286 Washington Avenue Extension P.O. Box 63 Albany, NY 12203-6399 Lycoming, NY 13093 Mark J. Wetterhahn, Esquire Mr. Kim A. Dahlberg Winston & Strawn General Manager - Projects 1400 L Street, NW Niagara Mohawk Power Corporation Washington, DC 20005-3502 Nine Mile Point Nuclear Station P.O. Box 63 Supervisor Lycoming, NY 13093 Town of Scriba Route 8 Box 382 Mr. Norman L. Rademacher Oswego, NY 13126 Plant Manager, Unit 1 Nine Mile Point Nuclear Station Gary O. Wilson, Esquire P.O. Box 63 Niagara Mohawk Power Corporation Lycoming, NY 13093 300 Erie Boulevard West Syracuse, NY 13202 Ms. Denise J. Wolniak

' Manager Licensing Niagara Mohawk Power Corporation Nine Mile Point Nuclear Station P.O. Box 63 Lycoming, NY -13093 Regional Administrator, Region 1 U.S. Nuclear Regulatory Comission 475 Allendale Road King of Prussia, PA 19406

i Meetina Notiqg E-Mail

-R. Zimmerman (RPZ)

5. Varga (SAV J. Zwolinski )

S. Bajwa D. Hood S. Little E. Jordan (e-mail to JKR)

OPA (e-mail to OPA) l G. Lainas B. Sheron R. Wessman J. Strosnider K. Wichman R. Herman M. Banic K. Manoly J. Rajan C. Carpenter W. Koo R. Frahm T. Green W. Gleaves L. Doerflein, RI S. Adams, RI T. Belch, RI C. Cowgill, RI W. Dean (WMD)

D. Screnci (DPS)

PMNS (Neeting Announcement Coordinator)

Hard Cooy Docket File PUBLIC PDI-l Reading OGC ACRS Receptionist (OWFN)

O

l-4 1

-?-

will also discuss its root cause determination and operability determination for the core shroud during the previous operating cycle.

PARTICIPANTS:

RC fliEL G. Lainas S. Bajwa R. Abbott B. Sheron R. Frahm~

M. McCormick R. Wessman T. Green C. Terry J. Strosnider D. Hood N. Radamacher K. Wichman W. Gleaves R. Corieri R. Hermann L. Doerflein (RI)

G. Inch M. Banic

5. Adams (RI)

W. Yager K. Manoly T. Belch (RI)

J. Hetninway-(GE)

J. Rajan et al.

J. Charnley (GE)

C. Carpenter et al.

W. Koo Docket No. 50-220 cc: See next page CONTACT: Darl Hood 8

7 415-3049

  • Meetings between NRC technical staff and applicants or licensees are open for interested members of the public, petitioners,-intervenors, or other parties to attend as observers pursuant to " Commission Policy Statement on Staff Meetings Open to-the-Public" 59 Feoeral Reaister 48340, 9/20/94.-

DOCUMENT NAME:NMPl\\NM1410.MTG To receive-a copy of this document, indicate in the box:

"C" - Copy without-attachment / enclosure "E" - Copy with attachment / enclosure "N" = No copy OHICE Pst:P0l =1 lE LA Pol;R l

D:P0l=1

,J

>l l

l HAME-Dhood:sw

_P.) A4 Slit W 58ajwe /h Id DATE-04/ 7 /97-04/.3/97 04/8 /97 04/ /97 04/ /97 2

Offici al Record Copy l

  1. "88 p

\\

UNITED STATES g

}

NUCLEAR RE2ULATORY COMMISSION o,

WASHINGTON, D.C. 30seH001 g,****,/

April 3, 1997 MEMORANDUM TO:

S. Singh Bajwa, Acting Director Project Directorate I-l Division of Reactor Projects - I/II FROM:

Darl Hood, Senior Project Manage. r Project Directorate I-l 75M Division of Reactor Project's - I/II

SUBJECT:

FORTHCOMING MEETING WITH NIAGARA M0 HAWK POWER CORPORATION

-RELATED TO NINE MILE POINT NUCLEAR STATION, UNIT NO. 1 l

DATE AND TIME:

April 10, 1997 9:00 a.m. to 1:00 p.m.

LOCATION:

U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, Maryland 20852 Room 1 F 7-9 PURPOSE:

To discuss Niagara Mohawk Power Company's (NMPC) evaluations and conclusions regarding core shroud integrity in view of inspection results that revealed (1) cracks in the heat affected zones of horizontal and vertical welds and (2) core shroud stabilizer anomalies that reduced the intended pre-load. The discussions will include acceptance criteria, methodology, results, corrective actions, reinspection plans, and conclusions regarding continued operation. The licensee Dra

4+

-h will also discuss its root cause determination and operability determination for the core shroud during the previous operating cycle.

PARTICIPANTS:

EC NtiP.C 1

G. Lainas S. Bajwa R. Abbott B. Sheron R. Frahm M. McCormick R. Wessman T. Green C. Terry J. Strosnider D. Hood N. Radamacher K. Wichman W. Gleaves R. Corieri R. Herman-L. Do9rflein (RI)

G. Inch M. Banic S. Adams (RI)

W. Yager l

K. Manoly T. Belch (RI)

J. Hetninway (GE) l J. Rajan et al.

J. Charnley (GE)

C. Carpenter et al.

W. Koo Docket No. 50-220 cc: -See next page CONTACT: Darl Hood 415-3049

  • Meetings between NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to " Commission Policy Statement on Staff Meetings Open to the Public" 59 Federal Reaister 48340, 9/20/94.

/

  • 1.

April 3 1997 0

No. 97 36 -

U.S. NUCLEAR REGULATORY COMMISSION REGION 1 NOTICE OF SIGNIFICANT MEETING Licensee:

Niagara Mohawk Power Corporation (NMPC)

Facility:

Nine Mile Point (NMP) Unit 1 Docket No:

50 220 l _.

Time and Date:

7:00 p.m., Monday, April 14,1997 Location:

Town of Scriba l

Municipal Building Conference Room 42 Creamery Road Oswego, New York 13126 Pu' pose:

Public meeting to discuss the results of the NRC's evaluation of the Nine Mile Point Unit 1 core shroud weld inspections and core shroud stabilizer examination performed by NMPC.

NRC Attendees:

C. Hehl, Director, Division of Reactor Projects (DRP), Region I L. Doerflein, Chief PB1, DRP, Region I B. Norris, Senior Resident inspector, DRP, Region 1 D. Hood, F-roject Manager, Project Directorate 11, Office of Nuclear Reactor Regulation (NRR)'

G. Carpenter, Materials Engineer, NRR NOTE:

This meeting is open for public participation. Attendance by additional NRC personnel or handicapped persons requiring assistance to participate in the meeting should make their requests known to Lawrence T. Doerflein, Chief, Projects Branch 1, USNRC, Region I,475 Allendale Rd., King of Prussia, PA 19406,(610-337-5378), by April 11,1997.

Prepared by:

Original Signed by:

Lawrence T. Doerflein, Chief Projects Branch 1 Division of Reactor Projects 0FFICIAL RECORD COPY IE:45-l 1

m_

g 2

Distribution (Via E-Mall):

L. Callan, Executive Director for Operations, OEDO H. Thompson, Deputy Executive Director for Regulatory Programs, OEDO E. Jordan, Deputy Executive Director for Regulatory Effectiveness, Program Oversight,,

l Investigations, and Enforcement, OEDO S. Collins, Director, Office of Nuclear Reactor Regulation A. Thadani, Deputy Director, Office of Nuclear Reactor Regulation T. Martin, Director, Diviulon of Reactor Program Management, NRR D. Matthews, Acting Deputy Director, Division of Reactor Program Management, NRR D. Ross, Deputy Director, Office of Analysis and Evaluation of Operational Data, AEOD R. Spessard, Director, Division of Reactor Controls and Human Factors, NRR J. Lieberman, Director, Office of Enforcement R. Zimmerman, Associate Director for Projects, NRR S. Varga, Director, Division of Reactor Projects - 1/11, NRR W. Dean, Regional Coordinator, OEDO N. Green, Jr., Policy Development & Technical Support Branch S. Bajwa, Director, Project Directorate 1-1, NRR D. Hood, Project Manager, PD l 1, NRR D. Screnci, Public Affairs, RI N. Sheehan, Field Public Affairs Officer, RI M. Campion, ORA l

D. Chawaga, ORA Distribution:

I PUBLIC B. Sylvia, Executive Vice President Generation Business Group, Niagara Mohawk Power Corporation State of New York Regional Administrator Secretary, RI Deputy Regional Administrator Secretary, RI DRP Division Secretary, RI DRS Division Secretary, RI DNMS Division Secretary, RI DRM Division Secretary, RI Region 1 Receptionist DOCUMENT NAME: G:\\ BRANCH 1\\NMP41497.MTG To,eceive a copy of this document. Indicate in the box: "C" = Copy.vithout attachment / enclosure

'E' = Copy with attachment / enclosure

  • N' = No copy 0FFICE RI/DRP l

RI/DRPl NAME TMos1ak c1J Jn LDoerfleinM7([0 DATE 04/ 3 /97 4

04/3 /97 0FFICIAL RECORD COPY

April 3. 1997 No. 97 36 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF SIGNIFICANT MEETING Licensee:

Niagara Mohawk Power Corporation (NMPC)

Facility:

Nine Mile Point (NMP) Unit 1 Docket No:

50-220 Time and Date:

7:00 p.m., Monday, April 14,1997 Location:

Town of Scriba l

Municipal Building Conference Room 42 Creamery Road Oswego, New York 13126

Purpose:

Public meeting to discuss the results of the NRC's evaluation of the Nine Mile Point Unit 1 core shroud weld inspections and core shroud stabilizer examination performed by NMPC.

NRC Attendees:

C. Hehl, Director, Division of Reactor Projects (DRP), Region I L. Doerflein, Chief PB1, DRP, Region I

't. Norris, Senior Resident inspector, DRP, Region I

< Hood, Project Manager, Project Directorate 11, Off ce of Nuclear Reactor Regulation (NRR)

G. Carpenter, Materials Engineer, NRR NOTE:

This meeting is open for public participation. Attendance by additional NRC personnel or handicapped persons requiring assistance to participate in the meeting should make their requests known to Lawrence T. Doerflein, Chief, Projects Branch 1, USNRC, Region I,475 Allendale Rd., King of Prussia, PA 19406,(610 337-5378), by April 11,1997.

E Prepared by:

W Lawrence T. Doerflein, Chief l Projects Branch 1 Division of Reactor Projects

i*

+

3 Distribution:

PUBLIC B. Sylvia, Executive Vice President Generation Business Group, Niagara Mohawk Power Corporation State of New York Regional Administrator Secretary, RI

- Deputy Regional Administrator Secretary, RI DRP Division Secretary, RI DRS Division Secretary, RI DNMS Division Secretary, RI DRM Division Secretary, RI Region I Receptionist

-c-April 9,1997

'e No. 97-36 Revision 1 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF SIGNIFICANT MEETING Licensee:

Niagara Mohawk Power Corporation (NMPC)

Facility:

Nine Mile Point (NMP) Unit 1 Docket No:

50-220 Time and Date:

5:00 p.mi, Monday, April 14,1997 Location:

Joint News Center 10 Airport Drive Fulton, NY 13069 (Directions: Adjacent to Oswego County Airport, off of County Route 176) l

Purpose:

Technical meeting to discuss the results of the Nine Mile Point Unit 1 core shroud weld inspections and core shroud stabilizer l

examination performed by NMPC.

NRC Attendees:

B. Sheron, Director, Division of Engineering (DE), Office of Nuclear Reactor Reguiation (NRR)

G. Lainas, Deputy Director, DE, NRR R. Wessman, Chief, Mechanical Engineering Branch, NRR II. Hermann, Senior Level Advisor, Materials & Chemical Engineering Branch (MCEB), (DE), NRR S. Bajwa, (Acting) Director, Project Directorate I-1 (PDI-1), NRR W. Koo, Senior Materials Engineer, MCEB, DE, NRR K. Kavanagh, Reactor Systems Engineer, Division of System Safety & Analysis, NRR D. Hood, Senior Project Manager, Project Directorate I 1, NRR L. Doerflein, Chief Projects Branch 1, Division of Reactor Projects (DRP), Region i W. Lazarus, Chief, Civil, Mechanical, Materials, Engineering 1

Branch, Division of Reactor Safety (DRS), Region i E. Gray,- Senior Project Manager, DRS, Region I B. Norris, Senior Resident inspector, DRP, Region 1 0FFICIAL RECORD COPY IE:45 MO $I1COLf3 i

2 NMPC Attendees:

B. Sylvia, Executive Vice President, NMPC R. Abbott, Vice President & General Manager Nuclear, NMPC M. McCormick, Vice President Nuclear Engineering, NMPC C. Terry, Vice President Nuclear Safety Assessment &

Support, NMPC NOTE:

This technical meeting is open for public observation except those portions l

of the meeting where proprietary information is discussed. At the conclusion of the technical discussions, time ~ will be provided for questions and comments from the public. Attendance by additional NRC personnel or handicapped persons requiring assistance to participate in the meeting should make their requests known to Lawrence T. Doerflein, Chief, Projects Branch 1, USNRC, Region I,475 Allendale Rd., King of Prussia, PA 19406, l

(610 337 5378), by April 11,1997.

Prepared by:

Original Signed by:

Lawrence T. Doerflein, Chief Projects Branch 1 Division of Reactor Projects Distribution (Via E-Mall):

L. Callan, Executive Director for Operations, OEDO H. Thompson, Deputy Executive Director for Regulatory Programs, OEDO E. Jordan, Deputy Executive Director for Regulatory Effectiveness, Program Oversight,,

investigations, and Enforcement, OEDO S. Collins, Director, Office of Nuclear Reactor Regulation A. Thadani, Deputy Director, Office of Nuclear Reactor Regulation T. Martin, Cirector, Division of Reactor Program Management, NRR D. Matthews, Acting Deputy Director, Division of Reactor Program Management, NRR D. Ross, Deputy Director, Office of Analysis and Evaluation of Operational Data, AEOD R. Spessard, Director, Division of Reactor Controls and Human Factors, NRR J. Lieberman, Director, Office of Enforcement R. Zimmerman, Associate Director for Projects, NRR S. Varga, Director, Division _ of Reactor Projects - l/II, NRR W. Dean, Regional Coordinator, OEDO N. Green, Jr., Policy Development & Technical Support Branch S. Bajwa, Director, Project Directorate 1-1, NRR D. Hood, Project Manager, PD l-1, NRR D. Screnci, Public Aff airs, RI N. Sheehan, Field Public Affairs Officer, RI M. Campion, ORA:

D. Chawaga, ORA

e z

3 e.

Distribution:

PUBLIC B. Sylvia, Executive Vice President Generation Business Group, Niagara Mohawk Power Corporation State of New York Regional Administrator Secretary, R1 Deputy Regional Administrator Secretary, RI-DRP Division Secretary, RI DRS Division Secretary, RI DNMS Division Secretary, RI

- DRM Division Secretary, RI Region i Receptionist l

l

.. a DOCUMENT NAME: G:\\ BRANCH 1\\04-14-97.NMP To,eceive a copy of thie document. Indicate h the boa: "C* = Copy without attachment / enclosure

  • E' = Copy with attactmentlanctosure
  • N' = No copy 0FFICE RI/DRPN

,n l

RI/DRP % s1 i

QQ NAME TMosiaWN\\

LDoerflein N v DATE 04f-f/97 N

04/4/97 0FFICIAL RECOR) COPY l

0

?

April 9,1997 3

No. 97 36 h'

RQvision 1 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF SIGNIFICANT MEETING Licensee:

Niagara Mohawk Power Corporation (NMPC)

Facility:

Nine Mile Point (NMP) Unit 1 Docket No:

50 220 Time and Date:

5:00 p.m., Monday, April 14,199'/

Location:

Joint News Center 10 Airport Drive Fulton, NY 13069 l

(Directions: Adjacent to Oswego County Airport, off of County Route 176)

Purpose:

Technical meeting to discuss the results of the Nine bile Point Unit 1 core shroud weld inspections and core shroud ' stabilizer examination performed by NMPC.

NRC Attendees:

B. Sheron, Director, Division of Engineering (DE), Office of 4

Nuclear Reactor Regulation (NRR)

G. Lainas, Deputy Director, DE, NRR R. Wessman, Chief, Mechanical Engineering Branch, NRR R. Hermann, Senior Level Advisor, Materials & Chemical Engineering Branch (MCEB), (DE), NRR S. Bajwa, (Acting) Director, Project Directorate 11 (PDI 1), NRR W. Koo, Senior Materials Engineer,- MCEB, DE, NRR K. Kavanagh, Reactor Systems Engineer, Division of System Safety & Analysis, NRR D. Hood, Senior Project Manager, Project Directorate 1-1, NRR L. Doerflein, Chief Projects Branch 1, Division of Reactor Projects (DRP), Region I W. Lazarus, Chief, Civil, Mechanical, Materials, Engineering Branch, Division of Reactor Safety (DRS), Region i E. Gray, Senior Project Manager, DRS, Region i B. Norris, Senior Resident inspector, DRP, Region I t

we

p:

3 4..

E

. Distribution:

- PUBLIC ;

B. Sylvia, Executive Vice President Generation Business Group, Niagara Mohawk -

Power Corporation

- State of New York --

Regionsi Administrator Secretary, RI-Deputy Regional Administrator Secretary, RI

- DRF Division Secretary / RI -

DRS Division Secretary, RI-'

DNMS Division Secretary, RI DRM Division Secretary, RI Region i Receptionist l

I 4