{{#Wiki_filter:* e Peach Bottom At!mic Powet St:t. ion PECO NUCLEAR ncoo c A Unit of PECO Energy $,fiIY/3I3Y4 9032 717 456 7014 i - August 5.1997 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Docket Nos. 50-277 and 50-278 Gentlemen: Enclosed is the monthly operating report for Peach Bottom Units 2 and 3 for the month of July 1997 forwarded pursuant to Technical Specification 5.6.4 under the guidance of Regulatory Guide 10.1, Revision 4. Sincerely, NWf Mark E. Wamer Director, Site Engineering Peach Bottom Atomic Power Station MEW /MJM: cme Enclosures cc: W. T. Henrick, Public Service Electric & Gas E. Salowitz, Public Service Electric & Gas W.P. Domsife, Commonwealth of Pennsylvania R.I, McLean, State of Maryland T.T. Martin, Administrator, Region I, USNRC W.L. Schmidt, USNRC, Senior Resident inspector T. M. Messick, Atlantic Eiectric A F. Kirby, Ill, Delmarva Power & Ught INPO Records Center i T. N. Mitchell, PECO Nuclear, Vice President, Peach Bottom Atomic Power Station t ) 1000 G ccn 97-14049 \\ Ell %\\#\\I 9708190275 97C731 PDR ADOCK 05000277 R PDR-
Peach Ik wn Atomic Power Staton Unit 2 July 1 thmugh July 31,1997 L 1. Narrauve Summarv of Onoratina Experiences Unit 2 began the month of July at a nominal 100% of rated thermal power (RTP). I Power remained at 100% throughout the entire month. j . l '/ A
Peach Bottom Atomic Power St an Unit 3 July 1 through July 31,1997 1; Narrative Summarv of Oceratina Fvaa'iences Unit 3 began the month of July at a nominal 94% of rated thermal power (RTP) due to coastdown. Throughout the entire month of July the unit continued coastdown. Unit 3 ended the month operating at 84% of RTP. j
4 Attachnent to Monthly Operating l Report for July 1997 Mhi1I1 REFUELING INFORMATION i 1.- Heme of faciltty: feach Bottom Unit 2 2. Scheduled date for rar retuonng shutdo vn: Reload 12 is scheduled for October 2,1998. 3 Schedu'ed date for restart following refue3ng: Restart following refueling forecast for October 30,1998. 4. Will refueling or resumption of operation therefore require a technical specifcation change or other license amendment? N/A If answer is yes, whet, in general, will these be? N/A ~ 5. Scheduled date(s) for submitting proposed licensing action and supporting information: 6. Important licensing considerations associated with refueling, e g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures: 7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool: (a) Core -764 Fuel Assemblies (b) Fuel Pool 2720 Fuel Assemblies,52 Fuel Rods
{ Docket N). 50-277 l Attachment to Monthly Operating Report for July 1997 Page 2 UNrr 2 REFUELING INFORMATION (Continued) 8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assembhes: The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies. 9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity: September 2002 without full core offload capability. September 1998 with full core offload capabihty.
Docket No. 50-878 Attachment to Monthly Operating Report for July 1997 UNIT 3 REFUELING INFORMATlON l 1. Name of facilrty; { Peach Bottom Unit 3 2. Scheduled date for next refueling shutdown: Reload 11 scheduled for October 3,1997 - 3. Scheduled date for restart following refueling Restart following refueling scheduled for November 1,1997-4. - Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? Yes. If answer is yes, what, in general, will these be?
- 1. Wide Range Neutron Monitoring Modrfcation 5395.
- 2. Large Primary Containment Purge and Vent isolation Valve Boot Seal Replacement Frequency Change.
- 3. ECCS/EDG Shutdown Specification Change.
- 4. Cycle 12 Safety Limit MCPR Technical Specification Change.
- 5. ECCS Suction Strainer Mod (Determined to be an Unreviewed Safety Question (USQ))
5. Allitems have been submitted. 6. Important licensing consideratons associated with refueling, e g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures: N/A 7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool. (a) Core - 764 Fuel Assemblies (b) Fuel Pool 2485 Fuel Assemblies,16 Fuel Rods 8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies: The spent fuel pool storage capacity has been relicensed for 3819 fuel assembles.
Dock:t No. 50-278 Attachment to l Monthly Operating l Report for July 1997 Page 2 UNIT 3 REFUELING INFORMATl0N (Continued) 9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity: September 2003 without full core offload capability, September 1999 with full core offload capability.
AVERAGE DAILY POWER LEVEL { 9 DOCKET NO_ 50 -277 UNIT PEACH BOTTOMUMT2 DATE AUGUST 5.1997 COMPANY PECO ENERGY COMPANY L P. HYDRICK BUSINESS SERVICES SITE SUPPORT DIVISION PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717)4564383 MONTH JULY,1997 DAY AVERAGE DAILY POWEP. LEVEL DAY AVERAGE DAILY POWER LEVEL (MWEWET) (MWE-NET) 1 1103 17 1107 2 1107 18 1095 3 1107 19 1120 4 1108 20 1088 5 1116 21 1095 6 1091 22 1099 7 1114 23 1112 8 1100 24 1100 9 1108 25 1112 10 1104 26 1104 11 1108 27 1108 12 1108 28 1108 13 1104 29 1103 14 1099 30 1103 15 1103 31 1112 16 1099 s
I ~ OPERATING DATA REPORT " DOCKET NO 50-277 CATE.. AUGUST 5,1997 COMPLETED BY PECO ENERGY COWANY L P.HYDRfCK BUSINESS SERVICES SITE SUPPORT DIVISION PEACH BOTTOM ATOMIC POWER STATION TELEPHONE '(717)4564383 OPERATING STATUS
- 1. UNIT NAME:,,, _ _ _ _,, _ _ _ _ _ _ _ _ _,,,,, _ _,,,,, _ _, _PEAcij BO@_ UNIT 2 NOTES:
- 2. REPORTING PERIOD:._,,,, _ _,,,, _ _ _,,, _ _ _, _,,,, _,, _ _ _ _, _ JUL,Y,1,997
- 3. UCENSED THERMAL POWER (MWT).,,____,__,,,,,,,,,,,,,,_,,_,,_3458
- 4. NAMEPLATE RATING (GROSS MWE). _ _ _ _ _ _, _ _,,,,, _ _,,,,, _,, _,,, _,1,221 S DESIGN ELECTRICAL RATING (NET MWE): _,,__,,,,,,,,,,_,,,,,,,,,_1119
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):,,________,,,__,,,,_,1159 t
7[ MAXIMUM DEPENDABLE CAPACITY (NET MWE): ' _ _ _,, _, _, _,, _ _ _ _,,,,, _,1_093,
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (!TEMS 3 THROUGH 7 ) SINCE LAST REPORT. GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED. IF ANY(NET MWE)-.'
- 10. REASONS FOR RESTRICTIONS,IF ANY:
THIS MONTH YR-TO-DATE CUMULAT1VE
- 11. HOURS IN REPORTING PERIOD 744 5.087 202.271
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL
' 744.0 5,087.0 136,002.5
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
' 14. HOURS GENERATOR ON-LINE 744 0 5.067.0 131,8642 '
- 15. UNIT RESERVE SHUTDOWN HOURS O_0 0.0 0.0
- 96. GROSS THERMAL ENERGY GENERATED (MWH) 2,571,710 17.366,443 399,342.023
- 17. GROSS ELECTRICAL ENERGYGENERATED (MWH) 844.100 5,767.400 131.236,990
- 18. NET ELECTRICA'. FNERGY GENERATED (MWH)
' 821,887 5.621.443 126,087,895 PAGE1 OF 2 .s.~.n .~.-. _. ~
-j OPERATING DATA REPORT (CONTINUED) I I DOCKET NO. 50-277 DATE AUGUST S.1997 THIS MONTH YR.TO4 ATE Ct,%IULATiVE
- 19. UNIT SERVICE FACTOR 100.0 %
100 0 % 65 2 %
- 20. UNIT AVAILAB UTY FACTOR 100 0 %
100 0 % 652 % l
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 101.1 %
101.1 % 589% j
- 22. UNIT CAPACITY FACTOR (USING DER NET) 98 7 %
98.8 % 58.0 %
- 23. UNIT FORCED OUTAGE RATE
.0 % .0 % 11.3 %
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS F4 DATE AND DURATION OF EACHN
- 25. IF SHUTDOWN AT THE END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP-
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERA f3ONS):
FORECAST ACHIEVED INITIAL CRITICAUTY 09/1Sf73 INITIAL ELECTRICITY 02f18,74 COMPERCIAL OPERAT'.ON 07AZis74 5 PAGE 2 OF 2 l
AVERAGE DAILY POWER LEVEL i DOOKTTNO. 50-378 UNIT PEACH BOTROM UNIT 3 DATE AUGUSTS 1997 COMPANY PECO ENERGY COMPANY L P. HYDRICK BUSINESS SERVICF.S SITE SUPPORT DMS10N PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717)456-4383 MONTH JULY,1997 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET) (MWE-NET) 1 900 17 905 2 975 18 893 3 972 19 909 4 963 20 877 5 972 21 880 6 943 22 880 7 962 23 884 8 935 24 876 9 943 25 876 to 939 26 872 11 935 27 888 12 93? 28 875 13 922 29 875 14 914 30 871 15 913 31 871 16 909 ____.,___.mm_..___m2_m
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-277 UNIT NAME PEACH BOTTOM UNIT 2 l 'DATE AUGUST 5,1997
- i COMPLETED BY PECO ENERGYCOMPANY L P. MYDRICK BUSINESS SERVICES SITE SUPPORT DIVISION PEACH BOTTOM ATOMIC POWER STAT!ON REPORT MONTH JULY,1997 TELEPHONE (717)4564383 METHOD OF UCENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DOWN EVENT CODE CODE ACTION TO NO.
DATE (1) (HOURS) (2) REACTOR (3) REPORT # (4) (S) PREVENT RECURRENCE TOTAL HOURS 4 (1) (2) (3) (4) F-FORCED REASON METHOD EXHIBrT G-INSTRUCTIONS S -SCHEDULED A-EQU:PMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B -MAINTENANCE OR TEST 2-MANUAL SCRAM ENTRY SHEETS FOR UCENSEE C-REFUEUNG 3-AUTOMATIC SCRAM EVENT REPORT (LER) D - REGULATORY RESTRfCTION 4 -OTHER (EXPLAIN) FILE (NUREG4151) E - OPERATOR TRAINING + UCENSE EXAMINATION F-ADMINISTRATIVE (5) G-OPERATIONAL ERROR (EXPLAIN) EXHIBITI-SAME SOURCE H - OTHER (EXPLAIN)
~ OPERATING DATA REPORT DOCKET NO. 50- 278 DATE AUGUST 5,1997 COMPLETED BY PECO ENERGY COMPANY L P. HYDRICK BUSINESS SERVICES SITE SUPPORT DIVISION PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-4383 OPERATING STATUS
- 1. UNIT NAME; - - - - - - - - - - - - - - - - - - - - - -. - - - - - - - - - - - PEAC.H.. P. OTTOM UNIT 3
- 2. REPORTING PERIOD: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ JULY,1997
- 3. LICENSED THERMAL POWER (MWT): ________________________________3458
- 4. NAMEPLATE RATING (GROSS MWE): ________,_________,____,______]221 t
- 5. DESIGN ELECTRICAL RATING (NET MWE): ______.____,,______________1119
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):
______________._______1@
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWEt _ _ _ _ _,, _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _1_093 E IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7 ) SINCE LAST REPORT GIVE REASONS:-
- 9. POWcR LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE):
- 10. REASONS FOR RESTRICTIONS,IF ANY:
THIS MONTH YR-TO-DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 744 5,087 196,167
- 92. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 5,021.5 135,009.8
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 14. HOURS GENERATOR ON-LINE 744.0 5.015 0 131,450 2
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 2,282,542 16,190,969 2 5,192,947
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 704,300 5,254,300 129,572,732
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 680,163 5,104,296 124,542,826 FAGE1OF2-
OPERATING DATA REPORT (CONTINUED) '~ DOCKET NO. 50-278 DATE AUGUST S,1997 THIS MONTH YR-TO-DATE CUMULATIVE
- 19. UNIT SERVICE FACTOR 100 0 %
98.6 % 66.3 %.
- 20. UNIT AVAILABruTY FACTOR 100.0 %
98.6 % 66.3 %
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 83.6 %
91.S % ' 60.3 %
- 22. UNIT CAPACITY FACTOR (USING DER NET) 81.7 %
89.7 % 58.6 %
- 23. UNIT FORCED OUTAGE RATE
.0 % 1.4 % 102 %
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):
- 25. IF SHUTDOWN AT THE END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMfVERCIAL OPERATIONS):
FORECAST ACHIEVED INITIAL CRITICALITY 08m7/74 INITIAL ELECTRICITY 0101/74 COMMERCIAL OPERATION 12/23f74 PAGE 2 OF 2 i
~ ~.. .. -. -..... - ~ - -. ...s ~ UNIT SH81TDOWNS AND POWER REDUCTIONS ' .i -: DOCKET NO. 50-278
- UNIT NAME PEACH BOTTOM UNIT 3 :
-{, DATE AUGUSTS,1997 COMPLETED BY PECO ENERGY COMPANY . L P. HYDR!CK ' BUSINESS SERVICES SITE SUPPORT DMSION PEACH BOTTOM ATOMIC POWER STATION REPORT MONTH . JULY,1997 TELEPHONE (717)45tM383 ' TYPE DURATION, . METHOD OF - UCENSEE SYSTEM COMPONENT . 'CAUSE AND CORRECTrE '- REASON SHUTTING DOWN EVENT. -CODE' CODE . ACTION TO NO. DATE (1) (HOURS) (2) REACTOR (3) REPORT # (4).' (5) PREVENT RECURRENCE .i TOTAL HOURS i i 'l (I) (3) (4) F-FORCED . REASON' METHOD EXHIBIT G-INSTRUCTIONS S - SCHEDULED A - EQUIPMENT FA! LURE (EXPLAIN) 1 - MANUAL-FOR PREPARATION OF DATA B - MAINTENANCE OR TEST. 2-MANUAL SCRAM ENTRY SHEETS FOR LICENSEE ' C - REFUELING 3 - AUTOMATtC SCRAM EVENT REPORT (LER) D - REGULATORY RESTRICTION 4-OTHER (EXPLAIN) FILE (NUREG-0161) E - OPERATOR TRAINING + LICENSE EXAMINATlON " ' (5) F - ADMINISTRATIVE G - OPERATIONAL ERROR (EXPLAIN) ' EXHIBIT I-SAME SOURCE - H - OTHER (EXPLAIN) L .._.-.m_ ,_,, ___ _ _____ _ _ _ _ _ _. _ _ _ _ _}}