Notification of 860923-24 Site Visit W/Util & Consultants at Plant Re Cable Pulling & Bend Radii.Meeting Agenda Encl
ML20210B064
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 09/16/1986
From: Alexion T
Office of Nuclear Reactor Regulation
To: Youngblood B
Office of Nuclear Reactor Regulation
References
NUDOCS 8609170439
Download: ML20210B064 (4)


Text

Q f

DO s

Docket Nos.: 50-327 and 50-328 1 6 SEP 1986

. MEMORANDUM FOR:

8. J. Youngblood, Director PWR Project Directorate #4 Division of PWR Licensing-A, NRR FROM:

Thomas W. Alexior,, Project Manager PWR Project Directorate #4 Division of PWR Licensing-A, NRR-

SUBJECT:

FORTHCOMING MEETING WITH TVA DATE & TIME:

September 23-24, 1986 9:00 a.m. - 5:00 p.m.

LOCATION:

Sequoyah Site PURPOSE:

Sequoyah site visit regarding cable pulling and bend radif. Agenda attached.

PARTICIPANTS:

NRC TVA T 7 oindexter D urch, et al.

A. Gill Consultants G. Toman J. Gardner W. Thue 3

bL I

Thomas W. Alexion, Project Manager PWR Project Directorate #4 t

Division of PWR Licensing-A, NRR l

cc: See next page t

DISTRIBUTION:

See next page l

PWR#4 PWd WR-A l

TAlexion/ rad BJ1 n f;1ood 09/ll,/86 09/[ -(M6 l

l l

l 8609170439 860916 PDR ADOCK 05000327 i

P PDR

MEETING NOTICE DISTRIBUTION Docket File NRC Participants NRC PDR I. Poindexter L PDR A. Gill NSIC PRC System PWR#4 Reading File M. Duncan T. Alexion ORAS H. Denton N. Olson H. Thompson E. Rossi, AD/PWR-A R. Ballard, EB D

C. Berlinger, RSB O

J. Milhoan, PSB F. Rosa, EICSB V. Benaroya, F0B OGC J. Partlow B. Grimes E. Jordan ACRS (10)

OPA Receptionist (Building where mtg is being held) l l

bcc: Licensee / Applicant & Service List l

l l

l

y J

Mr. S. A. White Tennessee Valley Authority Sequoyah Nuclear Plant cc:

Tennessee Department of Public Regional Administrator, Region II Health U.S. Nuclear Regulatory Commission, ATTN: Director, Bureau of 101 Marietta Street, N.W., Suite 2900 Environmental Health Services Atlanta, Georgia 30323 Cordell Hull Building Nashville, Tennessee 37219 W. C. Drotleff ATTN:

J. A. Raulston Mr. Michael H. Mobley, Director Tennessee Valley Authority Division of Radiological Health 400 West Summit Hill Drive, W12 A12 T.E.R.R.A. Building Knoxville, Tennessee 37902 150 9th Avenue North-o Nashville, Tennessee 37203 r

Mr. Bob Faas Westinghouse Electric Corp.

County Judge P.O. Box 355 Hamilton County Courthouse Pittsburgh, Pennsylvania 15230 Chattanooga, Tennessee 37402 R. L. Gridley Tennessee Valley Authority SN 1578 Lookout Place Chattanoogr., Tennessee 37402-2801 M. R. Harding Tennessee Valley Authority l

Sequoyah Nuclear Plant P.O. Box 2000 Soddy Daisy, Tennessee 37379 Resident Inspector /Sequoyah NPS c/o U.S. Nuclear Regulatory Commission

~

2600 Igou Ferry Road Soddy Daisy, Tennessee 37379 t

AGENDA FOR SEQUOYAH SITE VISIT RELATED TO CABLE SYSTEM CONCERNS-September 23, 1986 1.

A short meeting with electricians who were involved with installation of the Sequoyah cables during construction (if possible) to discuss plant specific concerns derived from the walkdowns at Watts Bar and evaluation of the'16 isometric drawings for the conduits (1 to 11 hours1.273148e-4 days <br />0.00306 hours <br />1.818783e-5 weeks <br />4.1855e-6 months <br />).

2.

A meeting to discuss the methods used to select the 16 conduits that were included in the side-wall bearing pressure evaluation and to discuss'the assumptions and methods used.for the calculations (1 to li hours).

3.

In order to evaluate cable pulling concerns for Sequoyah restart, it is necessary to inspect the 6.9 kV and 480 V cable systems. Therefore, the '

o following are requested to be ready for inspection.

w 1.

The cable teminations of one diesel generator.

2.

The switchgear teminations of the same diesel generatcr..

3.

A manhole in the 6.9 kV cable conduit runs 9 the diesel generators (if any exist).

4.

The cable tenninations to at least one 6.9 kV motor.

5.

The switchgear connections for 400 to 750 MCM, 480 V cable (both at power source and load connections).

If the cables from the 6.9 kV and 480 V switchgear enter cable trays in the vicinity of the switchgear, suitable ladders or scaffolding is desired to allow evaluation of the bend radii of the cables as they enter the tray system.

September 24, 1986 4.

'A plant walkdown to inspect the cables in the 16 conduits at pull points and terminations to evaluate the cables for signs of distress.

5.

Evaluation of unsupported cable between cable trays and conduits (Electrical Spread Room, and Elevation 714, Coordinate A12S).

6.

At the end of the day a short exit meeting will be held to describe concerns and observations resulting from the inspection.