Forwards Insp Repts 50-424/87-11 & 50-425/87-07 on 870126-30 & Notice of Violation
ML20207T917
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 03/03/1987
From: Reyes L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: James O'Reilly
GEORGIA POWER CO.
Shared Package
ML20207T919 List:
References
NUDOCS 8703240422
Download: ML20207T917 (3)


See also: IR 05000424/1987011

Text

"

h

.

MAR 6 31987

'

Docket Nos. 50-424, 50-425

License Nos. NPF-61, CPPR-109

G orgia Power Company

N: Mr. James P. O'Reilly

Senior Vice President-Nuclear

Operations

P. O. Box 4545

Atlanta, GA 30302

Gentlemen:

SUBJECT:

NOTICE OF VIOLATION

(NRC INSPECTION REPORT NOS. 50-424/87-11 AND 50-425/87-07)

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

W. P. Kleinsorga, P.E. on January 26-30, 1987.

The inspection included a review

l

i

of activities authorized for your Vogtle facility.

At the conclusion of the

l

inspection, the findings were discussed with those members of your staff

'

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

The inspection findings indicate that certain activities appeared to violate NRC

requirements. The violations, references to pertinent requirements, and elements

to be included in your response are described in the enclosed Notice of Viola-

tion.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosures

will be placed in the NRC Public Document Room.

The responses directed by this letter and its enclosures are not subject to the

clearance procedures of the Office of Management and Budget as required by the

Paperwork Reduction Act of 1980, PL 96-511.

Should you have any questions concerning this letter, please contact us.

Sincerely,

%[2ggo!

500

4

L

r

G

Luis A. Reyes, Acting Director

Division of Reactor Projects

Enclosures:

(See page 2)

Ih

TE- c i

_ _ _ _ _ _ _ _ _

,

MAR 0 81987

.

Ge'orgia Power Company

2

Enclosures:

1.

Notice of Violation

2.

NRC Inspection Report

cp w/encls:

(A. E. Conway, Senior Vice President &

froject Director

g. Whitney, General Manager Project

Jupport

(,F. D. Rice, Vice President, Project

Jngineering

X. H. Pinson, Vice President, Project

, Construction

(X. W. Hayes, Vogtle Quality

l

Assurance Manager

(f. B. Bockhold, General Manager,

puclearOperations

y.Gucwa, Manager,NuclearSafety

l

d.andLicensing

'

H. Googe, Project

fonstructionManager

(f. A. Bailey, Project Licensing

Jianager

gV. W. Churchill, Esq. , Shaw,

fittman, Potts and Trowbridge

j,E. E. Joiner, Troutman, Sanders,

Lockerman and Ashmore

[# G. Ledbetter, Commissioner,

1,CpH. Badger, Office of Planning

partment of Human Resources

.

jnd Budget

[D.Kirkland,III, Counsel,

fice of the Consuraer's Utility

ouncil

. Feig, Georgians Against

LP,f.uclearEnergyB. Margulies, Esq., Chairman,

Atomic Safety and Licensing Board

anel

. O. H. Paris, Administrative Judge

Atomic Safety and Licensing Board

Panel

[3/ A. Linenberger, Jr., Administrative Judge

Atomic Safety and Licensing Board

Panel

I

l

_

_ _ _ _ .

. . .

.

.

e7

MAR 0 31987

,

Georgia Power Company

-3

bgc w/encls:

LE. Reis 0GC

M. Hill, IE-

Miller, NRR

_

Brach, EDO

Sinkule, RII

Christnot, RII

C Resident Inspector

Document Control Desk

~

State of Georgia

I

-

pf

RII

RII

leinsorge:es

'Blake

ARHe t

V aiciera

A 7 G/87

JU G/87

.v'yg/87

Q'lI

87

RI

RII

pelMSinkule

VBrownlee

S/t3/87

f/ /87

1