Forwards Insp Rept 50-285/86-20 on 860707-11.No Violations or Deviations Noted.Insp Part of Special Appraisal to Verify Completion of Emergency Response Facility & Requirements of Suppl 1 to NUREG-0737.Deficiencies & Unresolved Items Noted
ML20207E394
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 12/22/1986
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Andrews R
OMAHA PUBLIC POWER DISTRICT
Shared Package
ML20207E402 List:
References
RTR-NUREG-0737, RTR-NUREG-737 NUDOCS 8701020169
Download: ML20207E394 (2)


See also: IR 05000285/1986020

Text

f

r- - w

Y

DEC 0 : 1986

In Reply Refer To:

'

Docket:

50-285/86-20

0

Omaha Public Power District

ATTN:

R. L. Andrews, Division Manager-

Nuclear Production

1623-Harney Street

'0maha, Nebraska 68102

r

Gentlemen:

h

This refers to the inspection conducted by Mr. N. M. Terc of this office and

other accompanying personnel during the period July 7-11, 1986, of activities

authorized by NRC Operating License DPR-40 for Fort Calhoun Station, and to the

discussion of our_ findings with you and other members of your staff at the

H

conclusion'of the inspection.

The NRC is conducting a special appraisal at all operating plants to verify that

[

licensees have completed their emergency response facilities (ERFs) and have met

the related requirements in Supplement 1 to NUREG-0737.

The objective of these

' appraisals is to determine that ERFs are capable of performing those functions

needed to assist licensees in taking adequate protective measures in the event

of a radiological emergency and te assure that the requirements in Supplement 1

to NUREG-0737 have been satisfied. We use the findings from these appraisals as

a basis for requesting individual licensee action to correct deficiencies and

'

-ensure licensee compliance with NRC requirements.

Areas examined during the appraisal conducted at Fort Calhoun Station are

described in the enclosed inspection report. Within these areas, the appraisal

team reviewed selected procedures and records, inspected the facilities and

equipment / supplies, interviewed personnel, and observed walk-throughs.

The

).

findings of this Emergency Response Facilities Appraisal identified 14

deficiencies and 7 unresolved items.

It is requested that you provide this

office, in writing, a schedule for correcting these deficiencies within 30 days

after receipt of this letter.

Within the scope of the inspection, no violations or deviations werc identified.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

QOhh $Nb

5

ORICINAL SfGNED BY:

G

J. E. Gagliardo, Chief

Reactor Projects Branch

nclosure:

(see next page)

A

,

<

RlV-

SPS

C:EP&

C:R&SPb

EPB/M M

C:RPB/h

C:RPB

i

rc:de

LYand

WLFisher

DBMatthe

DRHunf#

JGaglia

!

  1. 2 /to /86

@/g0/86

g/15'/86

tt/so/86

7/\\u/86

/t/a/

% b tw

A

SE

wd EdlofIha

> I'i

l

, -

~

r; ~

,

F Tgj

,:

l

.

.

"

_e
o

'

Lf s

-

,

h

p

.0maha!Public Power District

-2-

-

,

'

Enclosure:

~

TAppendix -'NRC. Inspection; Report-

,

~

50-285/86-20

4

CC*

L

W.1 G.' Gates , . Manager

~

'

Fort Calhoun Station

2

,P.10 Box 399- .

.

-

Fort Calhoun, Nebraska 68023

Harry H. Voigt, Esq.

"

LeBoeuf,' Lamb, Leiby & MacRae

'1333'New Hampshire Avenue, NW.

Washington, DC

20036

o.

.

. Director

.

. Nebraska Civil Defense. Agency

.

1300 Military Road,

'

-

Lincoln,: Nebraska68508

.

Kansas RadiationLControl Program Director

~

_

- Nebraska Radiation-Control Program Director

'

bec to DMB (.;E35)

_,

" _

bec distrib.' by RIV
  • RPB'

'

  • Resident Inspector

R. D. Martin, RA

.

'

-*R&SPB'

. Section Chief (RPB/B)

  • MIS System

~

  • RIV- File 1

DRSP

  • RSTS Operator

-

,

  • RSB
  • N. M. Terc
  • L. A. Yandell

DL B.~Matthews, IE

R. L. Bangart

R. Leonard, FEMA

.

G.'F.'Sanborn

'W. L. Fisher

-

'*w/766

.

1

v

.>