ML20206N468
| ML20206N468 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 08/20/1986 |
| From: | Warnick R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Gerstner W ILLINOIS POWER CO. |
| Shared Package | |
| ML20206N473 | List: |
| References | |
| NUDOCS 8608260297 | |
| Download: ML20206N468 (2) | |
See also: IR 05000461/1986051
Text
_ _ _
__
-
- -. _ -
-
_ - - - . .
.-.
.
0
.
pm
..
AUG 2 01986
d
Docket No. 50-461
Illinois Power Company
ATTN: Mr. W. C. Gerstner
Executive Vice President
500 South 27th Street
Decatur, IL 62525
Gentlemen:
This refers to the routine safety inspection conducted by D. E. Keating of
this office on July 7 through August 9, 1986, of activities at Clinton Power
Station authorized by NRC Construction Permit No. CPPR-137 and to the
discussion of our findings with Mr. Hall at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
,
j
the inspection. Within these areas, the inspection consisted of a selective
l
examination of procedures and representative records, observations, and
interviews with personnel.
No violations of NRC requirements were identified during the course of this
inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC
Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
!
Sincerely,
Nr19 fud $1V:W4.by A h MenW
f
y
R. F. Warnick, Chief
Reactor Projects Branch 1
,
Enclosure:
Inspection Report
No. 50-461/86051(DRP)
See Attached Distribution
.
8608260297 860820
ADOCK 05000461
0
W
RIII
RIII
RIII
,
d
i
$V
$d
Rnd
&
Keating/jp
Knop
Warnick
$
08/p/86
08/W/86
08/1o/86
1 I
,
.w..,
y
.
-.c.-
- . - _
~-..,_,___,_.-____--__.,.,__,.,.__.,_-m
--,m-
- .
- -<.-- . .-. .
.
.
.
AUS 2.01 set;
Illinois Power Company
2
.
Distribution
cc w/ enclosure:
DCS/RSB(RIDS)
Licensing Fee Management Branch
Resident Inspector, RIII
Richard Hubbard
Gary N. Wright, Manager
Nuclear Facility Safety
Mark Jason, Assistant
Attorney General,
Environmental Control Division
H. S. Taylor, Quality Assurance
Division
David Rosenblatt, Office of
Consumer Services
4
- -
-
-
- - - - - -
.--
- -
. - . . - - - . .
- - - , .
- - - - - - . - -