-*; y g gg - 1 1 In Reply Refer Toi Docket: ,50-285/86-11 Omah'a Public Power District
- ATTN
R. L..Andrews, Division Manager- ' Nuclear Production . 11623 Harney Street Omaha,-Nebraska 68102 Gentlemen: ' -This refers to the inspection conducted by Messrs. J. B. Baird and C. A. ' Hackney of this office during the period April 14-18, 1986, cf activities -authorized by NRC Operating License DPR-40 for the Fort Calhoun Station, and to the discussion of our findings with you and members of your staff at the conclusion of'the~ inspection. Areas examined during the inspection. included emergency detection and classification, protective action decisionmaking, dose calculation and assessment and shift staffing and augmentation. Within these areas, the inspection consisted of selective examination of procedures and representative- records, interviewsiwith personnel, and observations by the inspectors. These -findings are documented in the enclosed report. The enclosed. report identifies a deficiency in your emergency preparedness program' observed during the inspection. It is requested that you provide this office with a schedule for correcting this deficiency within 30 days after the receipt of'this letter. Within the scope of the inspection, no violations or deviations were identified. ~ The response directed by this letter is not subject the clearance procedures of the Office of Management and Budget as required by the Paperwork Reduction Act af 1980, PL 96-511. Should you have any questions concerning this inspection, we will be pleased to discuss them with you. Sincerely, f[[ hN285 .'Thrginal Signed by;" ' , 'O PDR J. E. Gagliardo, Chief ReactorProjectsBranch Enclosure: (see next.page) RIV:E%S EP&SPSdef C:EP&S D: C:R C:RPB JBBaird:sj C#iackney LAYand JL art DRHu er JEGagl do 5/lb/86 J //4/86 (,/3/86 ()6 /86 y/#86 4 //f i l}%h '
. . . , - . Omaha Public' Power District -2- ' Enclosure: Appendix --NRC Inspection Report 50-285/86-11 cc w/ enclosure: W. G.' Gates, Manager Fort Calhoun Station P. O. Box 399 fort Calhoun, Nebraska 68023 Harry H. Voigt, Esq. LeBoeuf, Lamb, Leiby & MacRae 1333 New Hampshire Avenue, NW Washington, DC 20036 Kansas Radiation Control Program Director Nebraska Radiation Control Program Director bec to DMB (IE35) bec distrib. by.RIV:
- RPB
- Resident Inspector
- JBBaird
- R&SPB
- Section Chief (RPB/B)
- CAHackney
- RIV File
DRSP
- LAYandell
- RSB
RLBangart RDMartin
- MIS System
- RSTS Operator
w/766 . }}