ML20205N753
| ML20205N753 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun |
| Issue date: | 04/18/1986 |
| From: | Gagliardo J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Andrews R OMAHA PUBLIC POWER DISTRICT |
| Shared Package | |
| ML20205N757 | List: |
| References | |
| NUDOCS 8605020283 | |
| Download: ML20205N753 (2) | |
See also: IR 05000285/1986003
Text
_
.
_
,
.
__
-
APR 181986
In Reply Refer To:
Docket:
50-285/86-03
-,
_
Omaha Public Power District
ATTN:
R. L. Andrews, Division Manager-
--
!
Nuclear Production
1623 Harney Street
Omaha, Nebraska 68102
Gentlerr.en:
-
This refers to the inspection conducted by P. H. Harrell of this office
i
during the period February 1-28, 1986, of activities authorized by NRC
]
Operating License DPR-40 for Fort Calhoun Station, and to the discussion of
1
n
)
our findings with Mr. W. G. Gates at the conclusion of the inspection.
Areas examined during the inspection included operational safety
E
verification, maintenance, surveillance, piant tours, safety-related system
_
walkdowns, followup on previously identified items, followup on licensee
event reports, followup on an IE Bulletin, followup on an NRC headquarter's
request on the maintenance outage team inspection, and followup on an NRR
-
order for modification of license. Within these areas, the inspection
'
_
consisted of selective examination of procedures and representative records,
'
interviews with personnel, and observations by the inspector.
The findings
are documented in the enclosed inspection report.
.
During this inspection, it was found that certain of your activities were in
-
violation of NRC requirements.
Consequently, you are required to respond to
these violations, in writing, in accordance with the provisions of
l
Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of
Federal Regulations.
Your response should be based on the specifics
-
i
contained in the Notice of Violation enclosed with this letter.
The response directed by this letter and the accompanying Notice is not
subject to the clearance procedures of the Office of Management and Budget as
required by the Paperwork Reduction Act of 1980, PL 96-511.
.
-
?
GhN
k
RIV:SR
RPB/Bd
RPB
-
PHHarrell
DMHunnicutt
JEGag ardo
3 /fD/86
.$ /20/86
4Ai
$
8605020283 860418
DR
ADOCK 0500
5
_
1
______ .
.
.
Omaha Public Power District
-2-
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
Sincerely,
Ongiral Signed By
J. E. Gagliardo
J. E. Gagliardo, Chief
Reactor Projects Branch
Enclosures:
1.
Appendix A - Notice of Violation
2.
Appendix B - NRC Inspection Report
50-285/86-03
cc w/ enclosures:
W. G. Gates, Manager
Fort Calhoun Station
P. O. Box 399
Fort Calhoun, Nebraska 68023
Harry H. Voigt, Esq.
LeBoeuf, Lamb, Leiby & MacRae
1333 New Hampshire Avenue, NW
Washington, DC 20036
Kansas Radiation Control Program Director
Nebraska Radiation Control Program Director
bcc to DMB (IE01)
bcc distrib. by RIV:
- RPB
- Resident Inspector
R. D. Martin, RA
- R&SPB
- Section Chief (RPB/B)
- RSB
- RIV File
DRS&P
- D. Weiss, LFMB (AR-2015)
- MIS SYSTEM
- RSTS Operator
- w/766
[