In Reply Refer To:
Dockets: 50-445/E6-20
50-446/86-17
.
Texas Utilities Generating Company
ATTN: Mr. W. G. Counsil
Executive Vice President
400 North Olive Street, Lock Box 81
Dallas, Texas
75201
'
Gentlemen:
This refers to' the inspection conducted by Mr. H. S. Phillips and other members
'
of the Region IV Comanche Peak Group during the period July 1 through
August 31, 1986, of activities authorized by NRC Construction Permits CPPR-126
and CPPR-127 for the Comanche Peak Steam Electric Station, Units 1 and 2, and
to the discussions of our findings with you and other members of your staff-
during the inspection period and with Mr. L. D. Nace and other members of your
staff at the conclusion of the inspection.
Areas of construction examined during the inspection included Unit 2 plant
status; Unit 2 general plant inspections; installation of electrical,
mechanical, and support components; Unit 2 safety-related pipe welding; steam
generator installation; Unit 2 control rod position detectors; and Unit 2
electrical work activities. Within these areas, the inspection consisted of
selective examination of procedures and representative records, interviews with
personnel, and observations by the NRC inspectors. These inspection findings
are documented in the enclosed inspection report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements. Consequently, you are required to respond to
these violations, in writing, in accordance with the provisions of
Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of
Federal Regulations.
Your response should be based on the specifics contained
,
in the Notice of Violation enclosed with this letter.
i
One unresolved item is identified in paragraph 9 of the enclosed inspection
'
report.
We have also examined actions you have taken with regard to previously
identified inspection findings. The status of these items is identified in
paragraph 4 of the enclosed report.
'
The response directed by this letter and the accompanying Notice is not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of'1980, PL 96-511.
/
std
y
b
DD:
P
C:CP $2f D:DRSP
RIV:SRRI
RI
HSPhillips
PCWa ner
RLS essard
IBarnes dEHJohnson
J /M/87
.3 h /87
j // /87
3 /2r/87 3/JJ/87
8704020218 870330
'
gQl
j
ADOCK 0500
5
j$
l
r
r
e
Texas Utilities Generating Company
-2-
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
Original Signed by:
R.E.HALU
E. H. Johnson, Director
Division of Reactor Safety and
Projects
Enclosures:
1. Appendix A - Notice of Violation
2. Appendix B - NRC Construction Inspection Report
50-445/86-20
'
50-446/86-17
3. Appendix C - Tables 1, 2, and 3
cc w/ enclosures:
Texas Utilities Electric Company
ATTN:
G. S. Keeley, Manager,
Licensing
Skyway Tower
400 North Olive Street
l
Lock Box 81
Dallas, Texas 75201
!
Juanita Ellis
President - CASE
l
1426 South Polk Street
!
Dallas, Texas
75224
Renea Hicks
Assistant Attorney General
I
Environmental Protection Division
P.O. Box 12548
78711 - 2548
i
Administrative Judge Peter Bloch
U. S. Nuclear Regulatory Commission
Washington, D. C.
20555
Elizabeth B. Johnson
!
Administrative Judge
Oak Ridge National Laboratory
P. O. Box X, Building 3500
l
Oak Ridge, Tennessee 37830
i
l
l
i
u.
.
.
.
.
.
,
.
Texas Utilities Generating Company
-3-
Dr. Kenneth A. McCollom
1107 West Knapp
Stillwater, Oklahoma 74075
Dr. Walter H. Jordan
881 Outer Drive
Oak Ridge Tennessee 37830
Anthony Roisman, Esq.
Executive Director
Trial Lawyers for Public Justice
2000 P. Street, N.W., Suite 611
Washington, D. C.
20036
Texas Radiation Control Program Director
bec: to DMB (IE01)
bec distrib. by RIV:
- RPB
- MIS System
'.
- RRI-OPS
- RSTS Operator
- RRI-CONST
- R&SPB
- T. F. Westerman, RIV
DRSP
- I. Barnes, CPG
R. Martin, RA
,
i
V. Noonan, NRR
- RSB
- RIV File
J. Taylor, IE
- D. Weiss,LFMB(AR-2015)
J. Konklin, IE
L. Chandler, OGC
P. Wagner
- w/766
j
.
,
y
-,
.,
, , . -
.--
- .
~
g
-