ML20199L715

From kanterella
Jump to navigation Jump to search
1RE07 ISI Summary Rept for Sys Pressure Test (Class 1 & 2) for STP Electric Generating Station, Unit 1
ML20199L715
Person / Time
Site: South Texas STP Nuclear Operating Company icon.png
Issue date: 10/28/1997
From: Echard D, Murry C
HOUSTON LIGHTING & POWER CO.
To:
Shared Package
ML20199L679 List:
References
NUDOCS 9712020091
Download: ML20199L715 (9)


Text

_ _ _ _ _ _ _ _

COVER SHEEI 1RE07 INSERVICE INSPECTION

SUMMARY

REPORT FOR SYSTEM PRESSURE TESTS

( CLASS 1 AND 2 )

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNIT 1 P. O. BOX 289 WADSWORTH, TEXAS 77483 USNRC DOCKET NO: 50498 OPERATING LICENSE NO: NPF-76 COMMERCIAL OPERATION DATE: AUGUST 25,1988 TRACKED BY CR# 97-17559 Prepared L (> t ~./

s MV C 77 by:

)

D.W. ECHARD', Consulting Engineer 0&cq'bkm l-

/01Kl97 y.

C.A. MURRY, Supervising Engineer 9712O20091 971020 PDR ADOCK 05000493 G

PDR

SCOPE 1RE07 SYSTEM PRESSURE TESTS The examinations summarized in this report were performed in accordance with the 1983 Edition through Summer 1983 Addenda of the ASME Code,Section XI which is applicable to the South Texas Project Electric Generating Station, Unit 1 T.us report covers selected ASME Code Class 1 and 2 Systems / Components. P.aminations and tests required by the Code are scheduled in accordance with " Inspection Program B" as defined in IWil-2412 and IWC-2412 for ASME Code Class 1 and 2 Systems / Components. All ASME Code Class I components were examined as prescribed by Table IWB-2500-1, Examination Category B-P which established the examination frequency at each refueling outage. The ASME Code Class 2 Systems / Components were selected on a prcrated basis.

This prorated selection process will continue until all ASME Code Class 2 Systems / Components are examined in accordance with Table IWC-2500-1, Examination Category C-li. This examination category for ASME Code Class 2 Systems / Components established the examination frequency at each inspection period. The remaining third period examinations are anticipated to be completed by the end (9/24/99) of the third inspection period and the first 10 year Inspection Intenal.

l

. ~. ~. _ _ _.

I Page 1 of 3 FORM NIS-1 OWNER'S REPORT FOR INSERVICE INSPECTIONS As required by the Provisions of the ASME Code Rules 1.

Osner flouston Lighting & Power Comnany Electric Tower. P. O' Box 1700. Ilouston. TX 77001 2'

Plant South Texas Proicct Electric Generating Station P.O. Box 289. Wadsworth. TX 77483 3.

Plant Unit 1

4. Owner Cet19 ate of Authorization (if required) -

N/A 5.

Commercial Scryice Date 08/25/88 6. National Board Number for Unit N/A 7,

Components inspected ASME CODE CLASS I PIPING AND COMPONENTS Component or Manufacturer Manufacturer or State or National Appurtenance or Installer Installer Serial Province Board No.

No.

No.

REACTOR VESSEL COMBUSTION ENGR /

11073 N/A 22190 iR10lNRV101 A WESTINGiiOUSE(M)

STM. GENERATOR I A WESTINGilOUSE(M) 2131 N/A W18691 IR121NSG101 A STM. GENERATOR lB WES11NGilOUSE (M) 2132 N/A W18692 IR121NSG101B STM.GENERATORIC WESTINGilOUSE(M) 2133 N/A W18693 IRl21NSG10lC STM. GENERATOR ID WESTINGliOUSE (M) 2134 N/A W18694 1Rl21NSG10lD PRESSURIZER I A WESTINGilOUSE(M) 2141 N/A W18590 IRillNPZIO y RC PUMP I A WESTINGilOUSE (M) l ll5E580G01 N/A 28 IR131NPP101 A RC PUMP IB WESTINGilOUSE(M) 2 Il5E580G01 N/A 29 IR131NPP101B RC PUMP IC WESTINGilOUSE (M) 3 il5E58000' N/A 30 1R131NPP10lC RC PUMP ID -

WESTINGilOUSE(M) 4 il5E580G01 N/A 31 1R13 tNPP10lD CLASS I PIPING EU ASCO l')

N/A N/A CLASS I VALVES VARIOUS N/A N/A N/A i

d i

Note: Supplemental sheets in the form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. X 11 in.,(2)

Information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form -

4 4

v

.c.-m.

=,.

--mv..

.,--#.y

,+-rw

-r.

-+c. - - - - -.-

Page 2 cr 3 1

FORM NIS 1 (Itack)

CL lixamination Dates 07/25/96 to 10/10/97 9. Inspection Interval from 08/25/88 to 09/24/99 10.

Abstract of Examinations, include a list of examinations and a statement concerning status of work required for current interval. Refer to Supplemental Sheet Page 3 of 3.

I 1.

Abstract of conditions Noted No relevant conditions affecting pressure retaining boundaries were noted.

12.

Abstract of Corrective Measures Recommended and Taken Refer to Supplemental Sheet Page 3 of 3.

We certify that the statements made in this report are cortect and the examinations and corrective measures taken conform to the rules of the ASME Code,Section XI.

Certificate of uthorization No.(if applicable)

N/A Expiration Date N/A Date

// f 19N Signed Houston 1.ichtinc & Power Co. Byhr 6

~/

Owner

'M F51. C shley

~

Reliabil~ ingineering Manager CERTIFICATE OF INSERVICE INSPECTION 1, the underdgned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of _Igui_and employed by Arkwricht Mutual Insurance Ca of Waltham. M ASS have inspected the components described in this Owner's Report during the period _]/3_3 /d to hl ol'!l and state that to the best of my knowledge and belief, the Owner has performed exami'nationsand taken corrective measures described in this Owner's report in accordance with the inspection plan and as required by the ASME Code,Section XI.

Ily signing this certificate neither the inspector nor his employer makes any warranty expressed or imphed, concerning the examinations and correc s e measures described in this Owner's Report. Furthermore, neither the Inspector nor his empt yet shall be)mbi in ny manner for any personal injury or porperty damage or a loss of any kind arising from or e nne ted

,th tigms; - ion.

/

Commissions (6l A_n ggM "

^

_ _ _ _ Th neltinspector's[ignature National Board, State, Province, and Endorsements am M flv n.ae i9 i

l' age 3 of 3 SUPPLEMENTAL PAGE FOlt ASME COI)E CLASS 1 PIPING AND COMPONENTS 1.

Owner linuston i ichtincilinicLCornpany Elecidc_Imtcr.P. O Ih 1700 lloustonJJ 77001 2.

l>lant S9uth_Icusforjec11kctdc_GenciatingStation P.O. Box 289. Wadswrrth TX 77483 3.

I'lant 1Jnit 1

4. Owner Certificate of Authorization (if required)

N/A 5.

Commercial Service Date 08.211L 6. National floard Number for Unit N/A 10.

AllSTRACT OF EXAhilNATIONS A System Leakage Test as prescribed in IWA-5211(a) for all AShiE Code Class 1 Pressure Retaining Conponents was conducted in accordance with Table IWil-2500-1, Examination Category ll-l', item Nos. 1115.10, IlI 5.20,1115.30,1115.40,1115.50,1115.60, and 1115.70.

The Pressure Ter*. and VT-2 visual examinations were conducted in accordance with Plant Surveillance Pressure Test Procedure, OPSP15-RC-0001, Reactor Coolant System Leakage Pressure Test (Rev. 3) at the conclusion of the seventh refueling outage. ash 1E Code Class 1 piping and valves are specifically identified in the above referenced procedure.

12.

AllSTRACT OF CORRECTIVE hiEASURES RECONihiENDED AND TAKEN The Visual Examinations (VT-2) performed during the Pressure Test found minor leakage at mechanicaljoints such as valve stems and flanged connections. These leaks were evaluated and determined acceptable for continued operation. Appropriate corrective action was initiated to correct these leaks.

i Page 1 of 3 FORM NIS-1 OWNER'S REPORT FOR INSERVICE INSPECTIONS As required by the Provisions of the ASME Code Rules 1,

Owner touston Uchtina & Power Comoanv Electric Tower. P.O. Box 1700. Houston. TX 77001 (Name and Address of Owner)

Plar.t _ South Texas Proicci Electric G DCIAting Station P.O. Box 289. Wadsworth. TX 77483 2.

C (Name and Address of Owner) 3.

Plant Unit 1

4. Owner Certificate of Authorization (if required)

N/A 5.

Commercial Service Date 03125188.____. 6. National Board Number for Unit N/A 7.

Compone its inspected ASME CODE CLASS 2 PIPING AND COMPONENTS Manufacturer Component or Manufacturer or Installer State or National Appurtenance or installer Serial No.

Province No.

Board No.

REGEN HX 1 A JOSEPH OAT CORP 2380-1 A N/A 2051 2R171NHX101A LETDOWN HX 1 A JOSEPH OAT CORP 2312-1 A N/A 986 SR171NHX102A EXCESS LETDN HX 1 A JOSEPH OAT CORP 2312-3A N/A 988 SR171NHX103A RHR HX 1 A JOSEPH OAT CORP J 2312-4A N/A 990 2R161NHX101A RHR HX 1B JOSEPH OAT CORP J 2312-4B N/A 991 2R161NHX101B RHR HX 1C JOSEPH OAT CORP 2312-4C N/A 992 2R161NHX101C RHR PUMP 1 A PACIFIC PUMP 51731 N/A 343 2R161NPA101A RHR PUMP 1B PACIFIC PUMP 51732 N/A 344 2R161NPA101b RHR PUMP 1C PACIFIC PUMP 51733 N/A 345 2R161NPA101C ASSOC. CLASS 2 EBASCO (1)

N/A N/A N/A PIPING ASSOC CLASSi VARIOUS N/A N/A N/A VALVES

^

1 A, B,128,11 C, AND 12C Note: Supplemental sheets in form of hsts, sketches, or drawings may be used, provided (1) size is 81/2 in.

X 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

i,. rw

Page 2 of 3 FORM NIS 1 (Back) 8.

Examination Dates _Q2/25/SIL to 10/10/97

9. Inspection Interval from _03125181L to 09/24/99
10. Abstract of Examinations. Include a list of exari.bations and a statement concerning status of work required for current interval. Refer to Supplemental Sheet Page 3 of 3.
11. Abstract of Conditions Noted No relevant conditions affecting pressure retaining boundaries were noted.
12. Abstract of Corrective Measures Recommended and Taken Refer :- Supplemental Sheet Page 3 of 3.

We certify that the statements made in this report are correct and the examinations an corrective measures taken conform to the rules of the ASME Code, Sect'on XI.

i Certificate of Authoritation No. (if applicable)

N/A Expiration Date N/A Date._// 5 19N_ Signed _ lions 1Dn Lightina & Power Co.

By /.

%, S' ashley 8

Owner Reliability igineering Manager CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Texas and employed by Arkwtipht Mutual Insurance Co of have inspected the components described in this Owner's Report during the period 7hf/3h Waltham. MAS 4'l ~1

_ to 10/Lol

. and state that to the bast of my knowledge and belief, the Ownet has performed examinations and taken corrective measures described in this Owner's Report in accordance with the inspection plan and as required by the ASME Code,Section XI.

By signing this certificato neither the inspector nor nis employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the inspector nor h'. employer shall be liable in any manner for any personalinjury or property damage or a loss of any d a sing from or connected with this inspection.

3 FACTORY MUTUAL SYSTEM f

Y U I

Commissions i^=u m Insdctor's Signature National Board, State Province, and Endorsements Date 19

z Page 3 of 3 3

SUPPLEMENTAL FOR ASME CODE CLASS 2 PIPING AND COMPONENTS 1.

Owner Jiouston_Lbidina.6thwetComanny____.Elacitic_IDwedQJ)oxl200diouston._IX_22001_

(Name and Address of Owner) 2.

Plant.SDuitLIDKRILEIDj00Lfdtc1HC_GCn0fAliD9_61011on lL0d)ol.2PadYAdn.Wstith IX_ZIiD3 (Name and Address of Owner) 3.

Plant Unit 1

4. Owner Certificato of Authoritation (if required)

N/A fi.

Conimercial Service Date 00'25R0

6. National Board Number for Unit N/3 F
10. ABSTRACT _0 LEX AMINATICES System Functional and Inservice Pressure Tests as prescribed by IWA 5211 (b) and (c), resNectively, were conducted on seheted ASME Code Class 2 pressuro retaining components in accordance with Table IWC 25001, Examination Category C H, item Nos. C7.20, C7.40, C7.60 and C7.80.

The Pressure Teste and VT 2 visual examinations were conducted during the third period of examin. son in accordance with the following Plant Surveillance Pressure Test Procedures:

OPSP15-CC-0001-Component Cooling Water System Inservice Pressure Test OPSP15 CM-0001 -RCB H Monit!oring Functional Pressure Test, 2

OPSP15 CV-0007 Chemical and Volume Control System inservice Pressure Test (IRC)

OPSP15 RC 0001 -Reactor Coolant System Leakage Pressure Test b

OPSP16-RH-0001 -Residual Heat R.emovat System inservice Pressure Test I

ASME Code Class 2 piping and valves are specifically identified in the above referenced procedures. These test procedures were conducted during the time q

period of July 25,1996 to October 10,1997.

12. ABSTRACT OF CORRECTIVE MEASURES _BECOMMENDED AND_IAKEN The Visual Examinations (VT-2) performed during these Pressure Tests found only minor Icakage at mechanical joints such as valve stems and flanged ccnnections.

These leaks were evaluated and determined acceptable for continued system operation. Appropriate corrective action was initiated to correct these leaks.

swa

COVER SilEET 1RE07 INSERVICE INSPECTION

SUMMARY

REPORT FOR REPAIRS AND REPLACEMENTS SOUTil TEXAS PROJECT ELECTRIC GENERATING STATION, UNIT I P.O. BOX 289 WADSWORTil, TEXAS 77483 USNRC DOCKET NO: 50-498 OPERATING LICENSE NO: NPF-76 COMMERCIAL OPERATION DATE: AUGUST 25,1988 TRACKED BY CR# 97-17559 Prepared liy:

M -3e* h 3, Engineer D. W, e

lleview ed l>y:

lA%

e f ~~

ll f12 Il l

C.A. Murry, Supervising Engineer

,;g QZC.DN' b 0f{2-~-

q

_ _ ___ A _ _ _

i t

i l

SCOPE 1RE07 RFPAIRS AND REPLACEMENTS

\\

i The inspections and records summarized in this report were performed in accordance with the 1983 Edition through Summer 1983 Addenda of the ASME -

.j Code,Section XI which is applicable to the South Texas Project Electric j

i Generation Station, Unit 1. This report covers ASME Code Class 1 and 2 Pressure L

Retaining Components ud their Supports where repair or replacement was t

performed between the end of the sixth refueling ' outage until the end of the seventh refueling outagejust completed. The submittal of this report is required 4

- by Section XI in accordance with paragraph IWA-6230 for ASME Code Class 1 and 2 Pressure Retaining Components and their Supports.

i I

[

i e

f l

)

I u

l i.

E L

l SOUTH TEXAS PROJECT UNIT I ASME SECTION XI l

1RE07 INSERVICE INSPECTION

SUMMARY

REPORT FOR REPAIRS AND REPLACEMENTS I

(CLASS 1 AND 2) l i

i h

CIA 5S R or R SYSTEM WORK COMPONENT COMPONENT MFG.

SERIAL NO.

NBN DESCRIPTION OF COMP.

i NO.

DOC.

DESCRIFFION IDESTITY WORK DATE (TAGTPNS)

I 1-97-016 RC 327863 Valve N1RCPSV3450 Crosby N60491 1124 Replaced valve, new SN8 10-15-97 0007 N60491-00-0003. and 4 l

Studs Gr. 660 B l

1.

1-97-017 RC 327862 Valve NIRCPSV3451 Crosby N6049l 1125 Replaced valve, new

'0-15-97 0008 SN# N60491-00-0004

[

1 1-97-018-RC 327861 Valve N1RCPSV3452 Crosby N60491 1126 Replaced valst.new SNs 10-15-97 0009 N60491-00-0005, and 4 studs Hts EVJ I

l-97-022 SG 35,936 Inspection Port Steam Generator Westinghouse-M0764-1 N/A Drill and tap See:mdary 10-16-97 j

Covers 2' Covers Astro Nuclear M0764-2 side covers for seal i

Dynamics Inc.

injection I

l-97-025 SG 356776 Steam Generator IR121NSG101D Westinghouse 2134 W18694 Installed :emp.y 4-30-97 sealing device, drill and i

tap costr i

1 1-97-033 RC 348208 Valve IR141XRC0001 A Westinghouse W750001 W14271 Dritted 3/16' hole in 10 16-97 upsma side ofdisc j

I I-97-034 RC 325077 Valve iR141XRC0001B Westinghouse W750011

' W18058 Drilled 3/16' hole in 10-15-97 i

j vys-. side ofdisc i

j 1

1-57-058 SG 332881 Steam Generator IR121NSG101A Westinghouse 2131 WI8691 Replaced helicoit Pt.8 10-14-97 i

1 (Primary Side) 4190-30-CN 3.750 I

l-97-059 SG 332882 Steam Generator iR121NSG101B Westinghouse 2132 W18692 Replaced 5 studs' nuts 10-15-97 i

(Primary Side) new SN#

643,623,636,692.6I8 i

I 614,610,673,733,65I I

I-97-062 SG 332885 Steam Gen-rator iR121NSG101A Westinghouse 2131 W18691 Replaced inspection 10-14-97 l

(Secondary Side) covers new IIt# 33lYNF, R6338, Cont.8 MB-62398-M I

l t7-063 SG 332886 Steam Generator IR121NSG101B Westinghouse 2132 W18692 Replaced inspection 10-14-97 i

(Secondary Side) -

cover new lite 331YNF, R6388 i

i ANII: B.R. RUSSELL.TX-826 Paget i

SOUTil TEXAS PROJECT UNIT I ASME SECTION XI IRE 07 INSERVICE INSPECTION

SUMMARY

REPORT FOR REPAIRS AND REPLACEMENTS l-(CLASS 1 AND 2) 4 CLASS R or R SYSTEM WORK COMPONENT COMPONENT M FG-SERIAL NO.

NBN DESCRIPTION OF COMI*.'

NO.

DOC.

DESCRIPTION IDENTITY WORK DATE j

UAGTPNS) j i

1-97-064 SG 332887

' Steam Generator IR121NSG101C Westmghouse 2133 W18693 Replaced inspection 10-14-97 i

' (Secondary Side) cover new Hte 331YNF,

=

R6388 i

1 1-97-065 SG 332888 Steam Generator IR121NSG101D Westinghouse 2134 W18604 Replaced inspection 10-14-97 (Sectnday Side) cover new Ht8 331YNF.

R6388

[

l 1

1-9'i-114 SG 355697 Steam Generator 1R121NSG101A Astro Nuclear SN-M-1263-1 N/A Drilled, tapped heles.

W e97 i

Secor.dary machined ph,tcy.Aic l

Maraway Cover finish on manway cover

[

2 1-95-057 CV 161367 Flex liose CV-1132-IFH-Metal Bellows 007 n'a Replaced flange and 10-27-97 i

Assembly BB2 Corp.

ree er sert

[

2 I-95-073 S1 3G1734 Valve 2N121XS10016C Westinghouse W750003 W12067 Drille.a 3/?6 hoic in 6-17-97 j

egmu side ofdisc 2

1-95-074 SI 304732 Valve 2N121XS10016A Westinghouse W750001 W12054 Drilled 3/16 hole in 8-7-97 5

og mo side of disc 2

1-95-075 SI 304733 Valve 2N121X510016D Westinghouse W750002 W12055 Drilled 3/16 holein 8-7-97 upmo side ofdisc 2

1-96-025 CC 332387 Valve 2R201TCC0198 JRW Mission Q-5126 N/A Replaced valve, new SNS 10-14-97 s

90-1328-0!(N)-02 l

2 I-96-072 CV 344923 Valve 2R171TCV0243 Borg Warner 29598 N/A Replaced valw, new SN8 10-15-97 i

95SD0202, Elbow Ilt8 I

BG, Pipe Hte 467477,470172 l

2 1-96-077 CV 341158 Vahe 2R171TCV0246 Anderson A3848 N'A Replaced valve, new SN2 10-14-97 Greenwood EZ874-1-8, Pipe lite

[

470172. Elbow Ilt8 OJ 2

1-96-082 CV 341159 Valve 2R171TCV0247A Anchor! Darling EZ874-1-2 N/A Replaced valve,new SNe 10-14-97

)

A3841. Pipe Hte 470172, Elbow Ht8 OJ l

2 1-96-084 CV 344924 Valve 2R171TCV0244 Andersen B3146 N/A Replaced valves.new 10-13-97 l

2R171TCV0245 Greenwood A3845 SN8 EZ874-1-1.EZ874-i 1-7,P) lit 8 C7366, Eibow Ht8 BF i

ANil: ILR. RUSSELL, TX-826 Page2 T

,,~,

-.. +

- ~ -

SOUTH TEXAS PROJECT UNIT I ASME SECTION XI IRE 07 INSERVICE INSPECTION

SUMMARY

REPORT FOR REPAIRS AND REPLACEMENTS (CLASS

  • AND 2)

CLASS R or R SYSTEM WORK COMPONENT COMPONENT M FG.

SERIAL NO.

NO DESCRIPTION OF COMP.

NO. '

DOC.

DESCRIPTION IDENTITY WORK DATE (TAGTPNS) 2 1-97-005 FW 348360 Valse 25131TFWO222 Kerotest ZN4-2 N 'A Replaced valves.new 10-15-97 2S131TFWD226 YM9-6 SN# 97ZV1012,

97ZV10ll, j

2 1-97-006 FW 352968 Valve 2S131TFWG467 Anchor / Darling E3326-23-1 N PA Replaced valve discs, 10-15-97 i

new SN# 241, 208 2

1-97-007 -

FW 352 % 8 Valve 25131TFWO468 AnchorOarling E3326-23-3

. i/A Replace valve discs.new 10-15-97 i

SNs 240.242 2

I-97-0 a 2 MS 356699 Valve ClMSPV7431 Control 35199-1-3 N'A Skim cut stem seating 10-16-97 l

Components, surface. existing seat ring.

i Inc.

plug,seatmg surface on i

existing plug 2

1-97-019 CV 356990 Valve N1CVFCV0202 Ametek 54-80-002 N/A Replaced valve plug. new 10-14-97

[

SN8 M-1243-1 l

2 1-97-020 CV 356988 Valve NICVFCV0201 Ametek 54-80-001 379 Replaced valve plug. new 10-14-97 i

SNa M0930-1

[

2 1-97-021 FW 316829 Valve 25131TFWO220 Kerotest YM9-15 N'A Replaced valses.new 10-15-97 ~ f l'

2S131TFWO224 ZN1-12 SN# 97ZV1010 E

97ZV1013. Pipe Htd 695814

[

2 1-97-029 WL 345597 Valve B1WLFV4913 WKM 70-119184 1877 Replaced valve plug new 10-14-97 Hi# OA3557-2, seat

[

2 1-97-067 CV 345443 Flow Element N1CVFE0132 Vickery-Simms K31067 N/A Replaced flow element.

10-14-97 new lit # 33402 I

2 1-97-074 CV 316049 Heat Eschanger SRl'F1NIIX102A Joseph Ost 2312-1 A 936 Replaced studs new lite 10-14-97 Corp.

83038, nuts SN# 33120 2

1-97-104 MS 367705 Valve N1MSPSV7430B Dresser BT-2176 N/A Drilled hole in 10-14-97

{

compression screw

[

2 1-97-107 CV 359848 Valve 2R171TCV0014 Kerotest CAB 16-25 N/A Replaced valve.new SNs 10-16-97 I

ASZ2-1 I

2 1-97-110 51 362207 Valve 2N121TSIO120A Anderson A3832 N 'A Replaced valve. new SN*

9-3-97

[

Greenwood EZ874-1-4 ANII: II.R. RUSSELL. TX-826 Page3 l

t

__...,m

l SOUT11 TEXAS PROJECT tiNIT I

(

ASME SECTION XI IRE 07 INSERVICE INSPECTION

SUMMARY

RFPORT FOR REPAIRS AND REPLACEMENTS (CLASS 1 AND 2)

CLASS R or R SYSTEM WORK COMPONENT COMPONENT M FG.

SERIAL NO.

NBN DESCRIPTION OF COMP.

NO.

DOC.

DESCRIPTION IDENTITY WORK DATE UAGTP-S) 2 I-97-121 RC 355208 Support RC-1212-HS5002 ESI N.'A N/A RemovedReinstalled 10-23-97 support and replaced 2

[

bolts'm:ts Ht.# A 307 Gr.A. A-563 Gr.A 2

1-97-122 CV 344923 Support CV-1112-HF5006 Sou;hwest Fab N/A N/A RemovedReinsta!!ed 10-15-97 i

P pe strap t

L s

a 4

I t'

l t

I i

i i

}

i ANII: B.R. RUSSELL.TX-826 Page4 l

COVER SHEEI 1RE07 INSERVICE INSPECTION

SUMMARY

REPORT FOR SYSTEM PRESSURE TESTS

( CLASS 1 AND 2 )

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNIT 1 P. O. BOX 289 WADSWORTH, TEXAS 77483 USNRC DOCKET NO: 50498 OPERATING LICENSE NO: NPF 7G COMMERCIAL OPERATION DATE: AUGUST 25,1988 TRACKED BY CR# 9717559 Prepared q _J by:

+4 C 7'/

i O.W. ECHARD' Consulting Engineer c-)hm l-l0l1b'l97 y.

C.A. MURRY, Supervising Engineer i

... -. -,. -~. - ~ - - - -. - -. ~ ~. - - -. - -

SCOPE J

IRE 07 SYSTEM PRESSURE TESTS The examinations summarind in this report were performed in accordance with the 198.2 Edition through Summer 1983 Addenda of the ASME Code,Section XI which is l

i applicable to the South Texas Project Electric Generating Station, Unit 1. This report covers selected ASME Cale Class 1 and 2 Systems / Components. Examinations and tests required by the Code are scheduled in accordance with " Inspection Program B" as defined

n IWH 2412 and IWC 2412 for ASME Code Class 1 and 2 Systems / Components. - All ASME Code Class I components were examined as prescribed by Table IWH-2500-1, Examination Category H P which established the examination frequency at each refueling outage. The ASME Code Class 2 Systems / Components were selected on a prorated basis.

This prorated selection process will continue until all ASME Code Class 2 Systems / Components are examined in accordance with Table IWC-25001 Examination i

Category C-II. This examination category for ASME Code Class 2 Systems / Components catablished the examination frequency at each inspection period. The remaining third period examinations are anticipated to be completed by the end (9/24/99) of the third inspection period and the first 10 year inspection interval.

f

+

- f L

t h

..m.,_.,,.

._'O,

.m w.

m.

,,ev.

,,..m...-..

,n-E-..._,,,-,,e,',e....,-.,.,,m..m.,

y.

l' age I of 3 170ltM NIS 1 OWNI:ll's iti:PoltT l'Olt INSI:ltVICI: INSI'I:CTIONS As required by the l'rovisions of the ASMI: Code Itules 1.

Owner ljouilon LightingAfaner Company Electric Tower. P. O. Box 1700. Ilouston.1% 77001 2.

Plant Sathlexas ProiggtL[getric GrntIntine Station P.O. Box 289. Wadsworth. TX 77483 3,

I'lant Unit 1

4. Owner Cc'tificate of Authoriistion (if required)

N/A 5.

Conunercial Service Date OE21/8]L 6. National floard Number for Unit N/A 7.

Cornponents inspected AShil CODLCLASS.1 PIPING AND COMPONENTS Component or Manufacturer Manuf acturer or State or National Appurtenance or Installer Installer Serial Province lloard No.

No.

No.

KliACIOR VliSSliE COMilUSTION isNGR/

11073 N/A 22190 IR10lNRV101 A Wl:STINGilOUSE(M)

SIM. GENiiRA10R I A WES11NGilOUSE(M) 2131 N/A W18691 IRl21NSG101 A SI M. GENI.RA' LOR lli WESilNGilOUSE(M) 2132 N/A Wl8692 IRl2iNSG10lli SiM. Gl.NiiRATOR IC WI.S ilNGilOUSE (M) 2133 N/A W18693 lR121NSG10lc S t M. GliNERA10R ID WESilNGilOUSE(M) 2134 N'A Wl8694 IRl21hSGl01D PRI.SSURIZER I A WES11NGilOUSE(M) 2141 N/A Wl8590 IRillNPZl01 A RC Pl'MP 1 A WI STINGilOUSli(M) 1 1151i$80001 N/A 28 1R131NPP101 A RC PUMP ill WES11NGilOUSE(M) 2 Il5E580G01 N/A 29 IR131NPP10lli RC PUMP IC WESTINGilOUSE (M) 3 il5E580001 N/A 30 1R131NPP10!C RC PUMP ID WESTINGilOUSE(M) 4 il5E580G01 N/A 31 IR131NPP10lD Cl. ASS 1 PIPING EllASCO (l)

N/A N/A Cl. ASS I VAEVES VARIOUS N/A N/A N/A Note: Supplemental sheets in the fonn of lists, sketches, or draw ings may be used, provided (1) size is 81/2 in. X l I in.,(2)

Information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is 'ecorded at the top of this form

l' age 2 of 3 FORM NIS 1 (llack)

Q.

lisarnination D.tes 37/2fM(> to JW11M 9. Inspection Interval from _08/25/88 to W/24N9 10.

Atattact of fixaminations. Include a list of examinations and a statement concerning Sta.tus of work required for current interval. Refer to Supplemental Sheet Page 3 of 3.

11.

Abstract of conditions Noted No relevant conditions affecting pressure retaining boundaries wtre noted.

12.

Abstract of Corrective Measures Recommended and Taken Refer to Supplemen'al Sheet Page 3 of 3.

We certify that the statements made in this report are cortc<t and the examinations and conective measures taken conform to the rules of the ASMll Code,Section XI.

Cestificate of uthoriration No. (if applicable)

N/A thpiration Date N/A Date _/[ f 19k Signed _llouston Lighting & PowcLQL liyhi d

V Nig.,ashley Owner Reliahylinrincering Manager CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holdmg a valid commission issued by the National lloard of Iloiler and Pressure Vessel Inspectors and the State or Province of _Irlatand employed by.AtkwIishtliuluelltuurance Ca af mittarpJf'ASLhave inspected the comp (ments described in this Owner's Report dunng the period _2/M,/%

to /94 0l 11 and state that to the best of my knowledge and belief, the Owner has performed exaininationsand taken corrective measures desciiled in this Gwner's report in accordance with the inspection plan and as required by the ASME Cale,Section XI.

Ily signing this certificate neither the inspector nor his employer makes any wananty, expressed or imphed, concerning the examinatmns and conec e measures described in this Owner's Report. Furthermore, neither the Inspector nor his yet shall be)in in ny manner for any personalinjury or porperty damage or a loss of any kind arising from or em c 'nneqted ith tigins;.

ion.

/

Commissions 16lk_7 qggN

_ _ _. _S -. cit, inspector's />ignature National lloard, State, Province, and Endorsements R.:

M /s/n Date _

19_

Page3of3 SUPPLEMENTAL PAGE FOR ASME CODE CLASS 1 PIPING ANI) COMPONENTS I.

Owner lieuitenligbiingA Pow er Company.jilectric Tower. P. O. Box 1700. Ilouitca. TX 77001 2.

Plant SouthlrxatEndecLElsstrjs.11cncratjuglitation P.O Box 289.mdsworth.TX 77483 1

Plant Unit.

1

4. Owner Certificate of Authorization (if required)

N 'A 5.

Commercial Service Date 08'21'88,.6. National !!oard Number for Unit N'A 10.

A11STRACT OF EXAhilNAllDNS A System Leakage Test as prescribed in IWA-5211(a) for all ASME Code Class 1 Pressure Retaining Conponents was conducted in accordance with Table IWB 25001. Examination Category ll P, Item Nos. Il15.10, Ill5.20 B15.30,1115.40, D15.50,1115.60, and 1115.70.

The Pressure Test and VT-2 visual examinations were conducted in accordance with Plant Surveillance Pressune Test Procedure, OPSP15 RC-0001, Reactor Coolant System Leakage Pressure Test (Rev. 3) at the conclusion of the seventh refueling outage. ASME Code Class 1 piping and valves are specifically identified in the above referenced procedure.

12.

ABSTRACT OF CORRECTIVE hfEASURES RECOMMENDED AND TAKEN The Visual Examinations (VT-2) perfonned during the Pressure Test found minor leakage at mechanical joints such as valve stems and flanged connections. These leaks were evaluated and determined acceptable for continued operation. Appropriate corrective action was initiated to correct these leaks.

Page 1 of 3 FORM NIS 1 OWNER'S REPORT FOR INPERVICE INSPECTIONS As required by the ProWalons of the ASME Code Rules 4

1.

Owner Jguston Llahtina & Power comoany Electric Tower. P.O. Box 1700. Houston. TX 77001 (Name and Address of Owner) 2.

r*lant Jguth Texas Prpjagt. Electric Generatina, Station P.O. Box 289. Wadaworth. TX 77483 (Name and Address of Owner) i 3.

Plant Unit 1

4. Owner Certificate of Authorization (if required)

N/A 5.

Commercial Service Date 08/25/88 0, Netiont' Board Number for Unit N/A 7.

Ccmponents inspected ASME CODE CLASS 2 PIPING AND COMPONENTS l

Manufacturer Component or Manufacturer or installer State or National Appurtenance or installer Serial No.

Province No.

Board No.

REGEN HX 1 A JOSEPH OAT CORP 2380-1 A N/A 2051 2R171NHX101 A LETDOWN HX 1 A JOSEPH OAT CORP 23121 A N/A 986 GR17 NHX102A EXCESS LETON HX 1 A JOSEPH OAT CORP 2312 3A J/A 988 i

5R171NHX103A RHR HX 1 A JOSEPH OAT CORP J 2312-4A N/A 990 2R101NHX101A RPR HX 10 JOSEPH OAT CORP J 2312 4B N/A 991 l'

2R101NHX101B RHR HX 1C JOSEPH OAT CORP 2312 4C N/A 992 2R161NH; ~.01C RHR PUMP 1 A PACIFIC PUMP 51731 N/A 343 2R161NPA101A RHR PUMP 1B PACIFIC PUMP 51732 N/A 344 2H101NPA1018 RHR PUMP 1C PACIFIC PUMP 51733 N/A 345 2R161NPA101C-ASSOC CLASS 2 EBASCO (1)

N/A N/A N/A PIPING ASSOC. CLASS 2.

VARIOUS N/A N/A N/A VALVES 1 A, B,128,11 C, -

AND 12C Note: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in.

X 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

s..aa.

p.

,.,,,a.,,g

,._.,p.y-%

x,9.+g

...,..y_..---,E y,3n,..m_

g

,., __yyy

,...y7,,,--,-w,--ww;n--w.m,,,,.

,._+,.w-,,,,,

..my.--,,-,,%--

,q,4e

,w-n

.,r.--,. - ~e T

evW"s' e-

I Page 2 of 3 FORM NIS 1 (Back) 8.

Examination Dates._D212519L to__1DL10/32_ 9. Inspection Interval from _OD1251BIL to 09/24/3a z

10. Abstract of Examinations, include a list of examinations and a statement concerning status of work required for current interval. Refer to Supplemental Sheet Page 3 of 3.
11. Abstract of Conditions Noted No relevant cenditions affecting pressure retaining boundaries were noted.
12. Abstract of Corrective Measures Recommended and Taken Refer to Supplemental Sheet Pa0e 3 of 3.

We certify that the statements made in this report are correct and the examinations an corrective measures taken conform to the rules of the ASME Code,Section XI.

Certificate of Auihoritation No tif applicable)

N/A Expiration Date N/

19b Signed Boulton Lighting & PovyctCn, _ By [.

Date _./ $

8 Owner shley Reliabilit

gineering Manager CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Texas _ and employed by Arkwricht MutualInsurance Co. of..

WalthanLJdASS _ have inspected the components described in this Owner's Report during tae period 7/?J/%

4 to / 0ftel'l 7

. and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures describad in this Owner's Report in accordance with the inspection plan and as required by the ASME Code,Section XI.

By rigning this certificato neither the inspector not his employer makes any warranty, expressed or impliod, concer ng the examinations and corrective n ensures described in this Owner's Report. Furthermore, i either the inst, : tor not hb employer shall be liable in any marmer for any personalinjury or property damage or a loss of any ' d s. sing from or connected with this inspection, l

FACTORY MUTUAL SYSTEM I

Commissions

-TsB16Y D

{

Inspractor's Signature National Board, State, Province, and Endorsements b'

Date

_._19

-o

Page 3 of 3 SUPPLEMENTAL FOR ASME CODE CLASS 2 PIPING AND COMPONENTS 1

i s

1.

Owner Houston Llahtina & Power Comoany Electric Tower. P.O. Box 1700. Houston. TX 77001 (Name and Address of Owner) 2.

Plant.SnuitLIgxas Proinci_Elecitic_Gitneratina Station P.O. Box 289. Wadsworth. TX 77493 (Name and Address of Owner) 3, Plant Unit 1

4. Owner certificate of Authorization (if required)

N/A

~

ti. Commercial Service Date 08/25/88

6. National Board Number for Unit N/A
10. ABSTRACT OF EXAMINATIONS System Functional and Inservice Pressure Tests as prescribed by IWA 5211 (b) and (c), respectively, were conducted on selected ASME Code Class 2 pressure retaining components in accordance with Table IWC 2500-1, Examination Category C H, Item Nos. C7.20, C7.40, C7.60 and C7.8r The Pressure Tests and VT-2 visual examinations were conducted during the third period of examination in accordance with the following Plant Surveillance Pressure Test Procedures:

OPSP15-CC 0001 Component Cooling Water System inservice Pressure Test OPSP15 CM-0001 -RCB H Monitioring Functional Pressure Test, 2

OPSP15-CV-0007 -Chemical and Volume Control System inservice Pressure Test (IRC)

OPSP15 RC 0001 -Reactor Coolant System Leakage Pressure Test OPSP15 RH 0001 Rasi.iual Heat Removal System inservice Pressure Test ASME Code Class 2 piping and valves are specifically identified in the above referenced procedures. These test procedures were conducted during the time period of July 25,1996 to October 10,1997.

12. ABSTRACT OF CORRECTIVE MEASURES RECOMMENDED AND TAKEN The Visual Examinations (VT 2) performed during these Pressure Tests found only minor leakage at mechanical joints such as valve stems and flanged connections.

These leaks were evaluated and determined acceptable for continued system operation. Appropriate corrective action was initiated to correct these leaks.

- k@kh '

b

-u.-m.s~-re,-,.--...--..

--w-

.~. m ---

-,,..v---.....--..

w r+e w..

-..a..~,

COVER SilEET IRE 07 INSERVICE INSPECTION

SUMMARY

REPORT FOR REPAIRS AND REPLACEMENTS SOUTil TEXAS PROJECT ELECTRIC GENERATING STATION, UNIT I P.O. HOX 289 WADSWORTii, TEXAS 77483 USNRC DOCKET NO: 50-498 OPERATING LICENSE NO: NPF-76 COMMERCIAL OPERATION DATE: A UGUST 25,1988 TRACKED llY CR# 97-17559 Prepared by:

/o-3e 27 D. W. I eD 3, Engineer

! e f" ll fIl $1 Reviewed by:

(AMM C.A. Murry, Supervising Engineer O$

f(

rgGZO

1 SCOEE 1RE07 ItEPAIRS AND itEPLACEMENTS l

The inspections and records sununarized in this report were perfonned in accordance with the 1983 Edition through Summer 1983 Addenda of the ASMl?

Code,Section XI which is applicable to the South Texas Project Electric Generation Station, Unit 1. This report covers ASME Code Class I and 2 Pressure Retaining Components and their Supports where repair or replacement was perfortned b: tween the end of the sixth refueling outage until the end of the seventh refueling outage just completed. The submittal of this repor: is required by Section XI in accordance with paragraph IWA-6230 for ASME Code Class 1 and 2 Pressure Retaining Components and their Supports.

l l

l

j SOUTil TEXAS PRO. JECT UNIT I ASME SECTION XI IRE 07 INSERVICE INSPECTION

SUMMARY

REPORT FOR REPAIRS AND REPLACEMENTS (CLASS I AND 2) r l

I

CLASS R or R SYSTEM WORK COMPONENT COMPONENT MFG.

SERIAL NO.

NBN DESCRIPT10N OF COMP.

i NO.

DOC.

DESCRIITION IDENTITY WORK DATE (TAGTPNS)

I l-97-016 RC 327863 Valve N1RCPSV3450 Crosby N60491 1124 Replaced valve,new SNa 10-15-97

[

0007 N6049I-00-0003, and 4 4

Stud-Gr. b60 B I

i-97-017 RC 327862 Valve NIRCPSV3451 Crosby N60491 1125 Replaced valve, new 10-15-97 l

0008 SN8 N60491-00-0004 I

l-97-018 RC 327861 Valve NIRCPSV3452 Crosby N60491 1126 Replaced valve,new SN8 10-15-97 l

0009 N60491-00-0005, and 4 studs lite EVJ i

.I l-97-022 SG 351936 Inspection Port Steam Generator Westinghouse-M0764-1 N/A Drilland tap Secondary 10-16-97 Covers 2' Covers Astro Nuclear M0764-2 side covers for seal Dynamics Inc.

injection I

1-97-025 SG 356776 Steam Generator IR121NSG101D Westinghouse 2134 W18694 Installed im,n.j 4-30-97 l

sealingdence, drill nd l

tap cover j

i 1-97-033 RC 348208 Valve IR141XRC000! A Westinghouse W750001 WI4271 Drilled 3/16' hole in 10-16-97 j

up>tien side ofdisc I

l-97-034 RC 325977 Valve IR141XRC0001B Westinghouse W7500ll W18058 Drilled 3/16' hole in 10-15-97

[

vy>L mu side of disc

[

l-97-058 SG 332881 Steam Generator 1R121NSG101A Westinghouse 2131 W18691 Replaced belicoit Pt.#

10-14-97 1

(Primary Side) 4190-30-CN 3.750 l

1 1-97-059 SG 332882 Steam Generator 1R12iNSG101B Westinghouse 2132 W18692 Replaced 5 studs / nuts 10-15-97 (Primary Side) new SN8 l

4 643,623,636.692,618, 614.610,673,733,651 I

l-97-062 SG 332885 Steam Generator 1R121NSG101 A Westinghouse 2131 W18691 Replaced inspection 10-14-97 (Secondary Side) covers new lit # 33iYNF,

)

R6388, Cont.8 MB-62398-M I

l-97-063 SG 332886 Steam Generator IR121NSG101B Westinghouse 2132 W18692 Replaceiinspection 10-14-97

[

(Secondary Side) cover new Ht# 331YNF, s

R638.8 i

ANil: R.R. RUSSELL, TX-826 Pagel

}

}

SOUTII TEXAS PROJECT l' NIT I ASilE SECTION XI 1RE07 INSERVICE INSPECTION SUM 31 ARY REPORT FOR REPAIRS AND REPLACE 31ENTS (CLASS I AND 2)

CLA%

R or R SYSTEM V.ORK COMPONENT COMPONENT MFG.

SERIAL NO-NBN DESCRil' TION OF CO M P-NO.

DOC DESCRII' TION IDENTITY WORK DATE (TAGTPNS)

I 1-97-0M SG 332887 Steara Generator iR12iNSG10lC Westmghouse 2133 WI8693 Replac-d mspectxm 10-14-97 cover new lite 331YNF.

(Secondary Side)

R6383 1

1-97-065 SG 332888 Stean Generator IRI21NSG101D Westinghouse 2134 W18694 Replaced inspecnon 10-14-97 ceser new lits 33IYNT.

(Seconday Side)

R6388 1

1-97-114 SG 355697 Steam Generator 1R121NSG101 A Astro Nuclear SN-M-1263-1 N/A Drilled, tapped holes.

10-14-97 Secondary machined photocraphic Manway Cover finish on manway cover 2

1 95-057 CV 161367 Flex llose CV-1132-IFli-Metal Bellows 007 rt'a Rcplaced ibuge and 10-27-97 Assembly BB2 Corp.

reducer insert 2

I 95-073 SI 304734 Valve 2N121XS10016C Westinghouse

% 750003 W12067 Drilled 3/16 hole in 6-17-97 uWmu side of disc 2

1-95-074 51 3M732 Valve 2N121XS10016A Westinghouse W750001 W12054 Drilled 3/16 hole in 8-7 97 upstream side ofdisc 2

1 05-075 SI 304733 Valve 2N121XS10016B Westinghouse W750002 W12055 Drilled 3/16 hole in 8-7-97 up.. side of disc 2

1-96-025 CC 332387 Valve 2R201TCC0198

  • RW Mission Q-5126 N'A Replaced valve, new SNe 10-14-97 90-1328-01(h}02 l

l 2

1 96-072 CV 344923 Valve 2R171TCV0243 Borg Warner 20593 N'A Replaced valve. new SNe 10-15-97 95SD0202.Eltw.nv litd BG. Pipe lite 467477.470172 2

1-96-077 CV 341158 Valve 2R171TCV0246 Anderson A3348 N'A Replaced valve.new SN#

10-14-97 Greenwood EZ874-1-8. Pipe IIt*

470172.Eibow Ilts OJ 2

1-96-082 CV 341159 Valve 2R171TCV0247A AnchorDarling EZ874-1-2 N'A Replaced valve,new SN#

10-14-97 A3841. Pipe lit # 470172 Elbow lits OJ 2

1-96-084 CV 344924 Velve 2R171TCV0244 Anderson B3146 N'A Replaced valves. new 10-l>97 2R171TCV0245 Greenwood A3845 SN# EZ874-1-I.EZ874-1-7. Pipe lite C7366 Elbow lit # BF ANII: n.R. RUSSI'LL.TX-826 Page2

k SOUTli TEXAS PROJECT UNIT I ASME SECTION XI IRE 07 INSERVICE INSPECTION

SUMMARY

REPORT FOR REPAIRS ANJ REPLACEMENTS (CLASS 1 AND 2)

[

i

[

CLASS R or R SYSTEM WORK COMPONENT COMPONENT MFG.

SERIAL NO.

NBN DESCRIPT ON OF COMP.

I NO.

DOC-DESCRIPTION IDENTITY WORK DAfE i

(TAGTPNS) f 2

1-97-005 FW.

343360 Valve 2S131TFWO222 Kerotest ZN4-2 N'A Replaced valves. new 10-15 97 2S131TFWO226 YM9-6 SN# 97ZV1012, 97ZV1011.

t 2

1 97-006 FW 352968 Valve 25131TFWO467 Anchor / Darling E3326-23-1 NTA Replaced valve discs.

10-15-97 I

new SN5 241. 208 2

.1-97-007 FW 352 % 8 Valve 2S131TF%TM68 AnchorVarling E3326-23-3 N/A Replace valve discs, new 10-15-97 j

SN# 240.242 l

2 1-97-012 MS 356699 Valve CIMSPV7431 Control 35199-1-3 N'A Skim cut stem seating 10-16-97 Components.

surface. existing seat ring.

l Inc.

plug, seating surface on

(

emstmg plug i

2 1-97-019 CV 356990 Valve NICVFCV0202 Ametek 54-89-002 N/A Replaced valve plug.new 10-14-97

)

SN8 M-1243-1 i

2 1-97-020 CV 356988 Valve N1CWCV0201 Ametek 54-89-001 379 Replaced valve plug. new 10-14-97 i

SP5 M0930-1

[

2

.1-97-02I FW 316829 V.lve 2SI3ITFWO220 Kerotest YM9-15 N!A Replaced v2ves, new 10-15-97 2S131TFWO224 ZNI-12 SN# 97ZV10i:$.

i 97ZV1013. Pipe R8

[

698814 i

2 I-97-029 WL 345597 Valve BlWLFV4913 WKM 70-119184 1877 Replaced valve plug new 10-14-97 i

Ht# OA3557-2. seat i

2 1-97-067 CV 345446 Flew Element N1CVFE0132 Vickery-Simms K81067 N/A Replaced flow elemen%

10-14-97 i

new Ht# 33402 i

j 2

1-97-074 CV 316049 Heat Exchanger SRl71NHX102A Joseph Oat 2312-IA 986 Replaced studs new lite 10-14-97

[

Corp.

83038 nuts SNe 33120 i

l-97-104 MS 367705 Valve N1MSPSV7430B Dresser BT-2176 N/A Drilled hole in 10-14-97 i

i compression screw 2

'1-97-107 CV 359848 Valve 2R171TCV0014 Kerotest CAB 16-25 N/A Replaced valve, new SNs 10-16-97 ASZ2-1 2

1-97-110 SI 362207 Valve 2N121TS10120A Anderson A3832 N/A Replaced valve, new SNe 9-3-97

(

Greenwood EZ874-1-4 ANII: B.R. RUSSELL.TX-826 Page3

SOUTH TEXAS PROJECT UNIT I l

ASME SECTION XI l

IRE 07 INSERVICE INSPECTION

SUMMARY

REPORT FOR REPATRS AND REPLACEMENTS (CLASS I AND 2)

CI ASS R or R SYSTEM WORK COMPONENT COMPONENT MFG.

SERIAL NO.

NBN DE.SCRIPTION OF COMP.

NO.

DOC DESCRIPTION IDENTITY WORK DATE (TAGTPNS).

2 1-97-121 RC 355208 Supt. ort RC-1212-MS5002 ESI N/A N/A Removed Remstalled le23-97 supp<wt and replaced 2 bolts' nuts Ht.8 A-307 I

Gr.A. A-563 Gr.A 2.

1-97-122 CV 344923 Support CV-1112-Itr $006 Southwest Fab N/A N/A RemovedRemstalled 10-15-97 pipe rtrap t

I i

f i

T i

l I

I i

I i

l AI:II: H.R. RUSSELL. TX-826 Page4 l

i t

CAVER SHEEI 1RE07 INSERVICE INSPECTION

SUMMARY

REPORT FOR SYSTEM PRESSURE TESTS

( CLASS 1 AND 2 )

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNIT 1 P. O. BOX 289 WADSWORTH, TEXAS 77483 USNRC DOCKET NO: 50-498 OPERATING LICENSE NO: NPF-76 COMMERCIAL OPERATION DATE: AUGUST 25, 1988 TRACKED BY CR# 97-17559 Prepared

(

)

by:

/eV s*27 D.W. ECHARD', Consulting Engineer

/0 U!77 by:

'7" h"

C.A. MURitY, Supervising Engineer G y q(f G O SI-%[ p

SCOPE 1RE07 SYSTEM PRFSSURE TESTS The examinations summarized in this report were performed in accordance with the 1983 Edition through Summer 1983 Addenda of the ASME Code,Section XI which is applicable to the South Texas Project Electric Generating Station. Unit 1. This report covers selected ASME C de Class I and 2 Systems / Components. Examinations and tests required by the Code are scheduled in accordance with " Inspection Program II" as delir:ed in IWil 2412 and IWC-2412 for ASME Code Class 1 and 2 Systems / Components. All ASME Code Class I componems were examined as prescribed by Table IWil 2500-1, Examination Category Il P which established the examination frequency at each refueling outage. The ASME Code Class 2 Systems / Components were selected on a prorated basis.

This prorated selection process will continue until all ASME Code Class 2 Systems / Components are examined in accordance with Table IWC-2500-1, Examination Category C-II. This examination category for ASME Code Class 2 Systems / Components established the examination frequency at each inspection period. The remaining third period examinations are anticipated to be completed by the end (9/24/99) of the third inspection period and the first 10 year inspection Interval.

l' age 1 of 3 170llM NIS 1 OWNI:It'S Iti:POllT 1014 INSI:ltVICI:INSI'l:CTIONS As rc<iuired by the Prmisions of the ASMI: Code Itules 1.

Owner lipuston Lighting & Power Company _Elttiricl01tI. P. O. Ilox 1700. llouston. T)* 77001 2.

Plant South Taas ProjetLEltrtric_Gengtatint' Station P.O. Ilox 289. Wadsworth. TX 77483 3.

Plant Unit 1

4. Owner Certif kate of Authorization (if required)

N/A 5.

Commercial Service Date 08/25/81L 6. National Board Number for Unit N/A 7.

Components Inspected ASMiifDDE_ CLASS I Pil'ING.AMILC.OMI'ONENTS

~

C mponent or Manufacturer Manufacturer or State or National Appurtenance or installer Installer Serial Province lloard No.

No.

No.

i RiiAC' LOR VESSlil.

COMilUS'ilON ENGR /

11073 N/A 22190 iR10lNRV101 A WESTINGl!OUSE (M)

Si M. Gl:NERAIOR 1 A W1511NGilOUSE (M) 2131 N/A W18691 1R121NSO'v,A SIM. GliNI.RAIOR lli W1511NGilOUSli(M) 2132 N/A W18692 1R121NSG10llt S1 M. Gl.NI RA~ LOR IC W15llNGilOUSli(M) 2133 N/A Wl8693 1R121NSG10lc S'I M. GliNi;RNIOR ID W iS'11NGilOUSE (M) 2134 N/A Wl8694 1Rl21NSG101D PRESSURl/ER l A W1511NGilOUSli(M) 2141 N/A Wl8590 lRlllNPZ10l A RC PUMP I A WlXilNGilOUSli(M) 1-115E580001 N 'A 28 IRl31NPP101 A RC PUMP 111 W1511NGilOUSF (M) 2-115E580001 N/A 29 1R131NPPl3til RC PUMI' IC W1511NGilOUSE (M) 3 115E580G01 N/A 30 IRl31NPP10lc RC PUMP ID WES ilNGilOUSE (M) 4Il5E580001 N/A 31 1R131NPP101D Cl. ASS 1 l'll'ING 1:11ASCO (l)

N/A N/A Cl. ASS I val.VI S VARIOUS N/A N/A N/A Note: Supplemental sheets in the form of lists, sketches, or drawings may be used, pros ided (1) size is 81/2 in. X 1 I in. (2)

Information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form i

Page 2 of 3 FORM NIS 1 (llack) 8.

linamination Dates 07/25/96 to IR/1HT 9. Inspection Inter al from _08/25/b8 to 09/24/99 10.

Abstract on lixaminations, include a list of examinations and a statement concerning status of work required for cunent interval. Refer to Supplemental Sheet Page 3 of 3.

11.

Abstract of conditions Noted No relevant conditions affecting prescare retaining boundaries were noted.

j 12.

Abstract of Conective hicasures Recommended and Taken Refer to Supplemental Sheet Page 3 of 3.

We certify that the statements made in this report are conect and the examinatmns and conective measures taken conform to the rules of the ASMI!Cnie,Section XI.

Certificate of uthorization No. (if applicable)

N/A lixpiration Date N/A Date _ // [

19N Signed Jiouston Lichtinc & Power Co. II)h 6

/

Owner W / Mt. ' vhley

~

Reliabil~, ingineering Manager CERTIFICATE OF INSERVICE INSPECTION

\\

1, the undersi 1ed, holding a valid commission issued by the National 11oard of aloiter and Pressure Vessel Inspectors

}

F

)

and the State or Province of Inci and employed by.Arkwricht hintulhntuin 1 of Walthat SSmhave inspected the components described in this Owner's Report during the period ~7.2 s O to

  • f 'l and state that to.he best of my knowledge and belief, the Owner has perfonaed exami'nationsand t Len conective measures described in this Ow ner's report in accordance with the inspection plan and as required by the ASMii Code,Section XI fly signing this certifnate neither the Im.pector nor his employer makes any wananty, expressed or implied, concerning the examinations and conec te rneasures described in this Owner's Report. Furthermore, neither the inspector nor his yer shall be) inh in iny manner for any personalinjury or porperty damage or a loss of any kind arising from or em c nne ted lth ti ins;- ion.

p Commissions K O-53NN Ro beH, inspector's ignature National lloard, State. Province, and findorsements N dyn Date 19 l

3

l' age 3 of 3 SUPPL EMENTAl, PAGE FOR ASSIE CODE Cl ASS 1 PIPING AND COh1PONENTS 1.

Ow ner 11guston l_lchting & Power Comnany l'lectric Tower. P. O. Ilox 1700 licuston. TX 77001 2.

l>lar.t Scyth Texas Podcrtjilectdc Generating $1ation P.O. Box 289. Wads. worth TX 77483 3.

Plant Unit 1

4. Owner Certificate of Authorliation (if required)

N/A 5.

Commercial Service Date 08/253 3, 6. National floard Number for 11 nit N/A 10.

AllSTRACT OF EXAMINATIONS A System Leakage Test as prescribed in IWA-5211(a) for all ASME Code Class 1 Pressure Retaining Conponents was conducted in accordance with Table IWu 2500-1. Examination Category ll P, item Nos. B15.10,1115.20,1115.30,1115.40, B15.50,1115.60, and 1115.70.

The Pressure Test and VT-2 visual examinations were conducted in accordance with Plant Surveillance Pressure Test Procedure, OPSPl5-RC-0001, Reactor Coolant System Leakage Pressure Test (Rev. 3) at the conclusion of the seventh refueling outage. ASME Code Class 1 piping and valves are specifically identified in the above referenced procedure.

12.

ABSTRACT OF CORRECTIVE MEASURES RECOMMENDED AND TAKEN The Visual Examinations (VT-2) perfo;med during the Pressure Test found minor leakage at mechanicaljoints such as valve stems and flanged connections. i'hece leaks were evaluated and determined acceptable for continued operation. Appropriate corrective action was initiated to correct these leaks.

Page 1 of 3 I

FORM NIS 1 OWNER'S REPORT FOR INSERVICE INSPECTIONS i

As required by the Provisions of the ASME Code Rules

]

1.

Owner Houston Iinhtino & Power comoany Electric Tower. P.O. Box 1700. Houston. TX 77001 (Name and Address of Owner) 2.

Plant Jguth Texas PrehdElgC1dCSADeratino Station P.O. Box 289. Wadsworth. TX 77483 (Name and Address of Owner) 3.

Plant Unit 1

4. Owner Certificate of Authorization (if required)

N/A l

l 6.

Commercial Service Date _ 0812518B

0. National Board Number for Unit N/A i

i 7.

Components inspected ASME CODE CLASS 2 PlPING AND COMPONENTS

^

Manufacturer Component or Manufacturer or Installer State or National Appurtenance or installer Serial No.

Province No.

Board No.

REGEN HX 1 A JOSEPH OAT CORP 2380-1 A N/A 2051 2R171NHX101A LETDOWN HX 1 A JOSEPH OAT CORP 23121 A N/A 986 SR171NHX102A EXCESS LETDN HX 1 A JOSEPH OAT CORP 2312-3A N/A 988 SR17?NHX103A-RHR HX 1 A JOSEPH OAT CORP J 2312-4A N/A 990 2R161NHX101A RHR HX 18 JOSEPH OAT CORP J 2312 4B N/A 991 2R101NHX1018 RHR HX IC JOSEPH OAT CORP 2312-4C N/A 992 2R161NHX101C RHR PUMP 1 A PACIFIC PUMP 51731 N/A 343 2R161NPA101A RHR PUMP 1B PACIFIC PUMP 51732 N/A 344 28101NPA1018 RHR PUMP 1C PACIFIC PUMP 51733 N/A 345 2R161NPA101C ASSOC. CLASS 2 EBASCO (t)

N/A N/A N/A PIPING ASSOC. CLASS 2 VARIOUS N/A N/A N/A L

VALVES RCFC COILS AMERICAN AIR FILTER VARIOUS N/A VARIOUS 11 A,12A,110,128,11C, AND 12C Note:. Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in.

X 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

v,,wa

.._.~.._-,,--m.,-..,-.-----

-.,-..._,.,~,____-._,.._.r.--,_,_.-,

.-,_.m.mm_,._,-m,.

.,,m--.-

Page 2 of 3 FORM NIS 1 (Back) 8.

Examination Dates.. 07/251911_ to 10/10/97

9. Inspection interval from __08/2filaB_ to. 09/24/99
10. Abstract of Examinations. Include a list of examinations and a statement concerning status of worx required for current interval. Refer to Supplemental Sheet Page 3 of 3.
11. Abstract of Conditions Noted No relevant conditions affecting pressure retalning boundaries wore noted.
12. Abstract of Corrective Measures Recommended and Taken Refer to Supplement 1 Sheet Page 3 of 3, We certify that the statements made in this report are correct and the examinations an corrective measures taken conform to the rules of the ASME Code,Section XI.

Certificate of Authorization No. (if applicable)

N/A Expiration Date N/A Date // $

19N Signed tlppston Light [ng & Power Co.

By_

Owner TA. "' ashley Reliability gineering Manager CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid c3mmission issued by the National Roard of Boiler and Pressure Vessel inspectors and the State or Province of Texas. and employed by Arkwricht Mutun! Insurance Co. of Walttlam. MASSp have inspected the components described in this Owner's Report during the period $b6 to /Choli~l

. and state that to the best of my knowledge and belief, the Owner has performed examinations 'and taken corrective toeasures described in this Owner's Report in accordance with the inspection plan and as required by the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor b' employer shall be liable in any manner for any personal injury or property damage or a loss of any d a sing from or connected with this inspection.

(

i FACTORY MUTUAL SYSTEM

/

I Commissions m oz6 Y

~-

Ymt; inspbetor's Signature National Board, State, Province, and Endorsements r* ts s n 19 Date

5$hk Page 3 of 3 SUPILEMENTAL FOR ASME CODE CLASS 2 PIPING AND COMPONENTS 1.

Owner.tlomston Lighting & Power Comoany Electric Tower. P.Q Gox 1700. Houston. TX 77001 (Name and Address of Owner) k 2.

Plant Squthlexas Proiect Electric Gei.sratina Station _ P.O. Box 289. Wadsworth. TX 77483 (Name and Address of Owner)

ant Unit 1

4. Owner Certificate of Authorization (if required)

N/A 5.

Commercial S6 uke Date C8/25/88

6. National Board Number for Unit N/A

]

10. ABSTRACT OF EXAMINATIONS System functional and inservice Pressure Tests as prescribed by IWA-5211 (b) and (c), respectively, were conducted on selected ASME Code Class 2 pressure retaining components in accordance with Table IWC-2500-1, Examination Category

' " ~

C-H, item Nos. C7.20, C7.40, C7.60 ar.d C7.80.

The Pressure Tests and VT-2 visual excminations were conducted during the third period of examination in accordance with the following Plant Surveillance Pressure Test Procedures.

OPSP15-CC-0001-Ccmponent Cooling Water System Inservice Pressure Test OPSPiS-CM-0001 -RCB H Monitioring Functional Pressure Test, 2

OPSP15-CV-0007 -Chemical and Volume Control System Inservice Pressure Test (IRC)

OPSP15-RC-0001 -Reactor Coolant Sy. tem Leakage Pressure Test OPSP15 RH-0001 -Residual Heat Remova! System inservice Pressure Test ASME Code C ass 2 piping and valves ere specifically identified in the above referenced proceduies. These test procedures were conduct ?d varing the time period cf July 25,1996 to October 10,1997.

12. ABSTRACT OF CORRECTIVE MEASURES RECOMMENDED AND TAKEN The Visual Examinations (VT-2) performed during these Pressure Tests found only minor leaka[;e at mechanical joints such as valve stems and flanged connections.

These leaks were evaluated and determined acceptable for continued system operation. Appropriate corrective action was initiated to correct these leaks.

I beo ?ct2

COVFR SilEET 1RE07 INSERVICE INSPECTION

SUMMARY

REPORT FOR REPAIRS AND REPLACEMENTS SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNIT I P.O. BOX 289 WADSWORTH, TEXAS 77483

,Q USNRC DOCKET NO: 50-498 OPERATING LICENSE NO: NPF-76 COMMERCIAL OPERATION DATE: AUGUST 25,1988 TRACKED BY CR# 97-17559 Prepared by:

/C.Se 27 D. W. Eel 9, Engineer lleviewed by:

%l Am f '

ll fII.D

~

C.A. Murry, Supervising Engineer PQQ-E4W ff -~

SCOPE 1RE07 REPAIRS AND REPLACEMENTS The inspections and records summarized in this report were performed in tecordance with the 1983 Edition through Summer 1983 Addenda of the ASME Code,Section XI which is applicable to the South Texas Project Electric Generation Station, Unit 1. This report covers ASME Code Class 1 and 2 Pressure Retaining Components and their Supports where repair or replacement was performed between the end of the sixth refueling outage until the end of the seventh refeling outagejust completed. The submittal of this report is required by Section 4 in accordance with paragraph IWA-6230 for AWP code Class I and 2 Pressure Retaining Components and their Supports.

m

[

E v,

l 2

SOUTil TEXAS PRCJECY UNIT I ASME SECTION XI 1RE07 INSERVICE INSPECTION

SUMMARY

REPORT FOR kEPAIRS AND REPLACEMENTS (CLASS 1 AND 2)

CLASS R or R SYSTEM WORh COMPONENT COMPONENT MFG.

SERI AL NO.

NBN DESCRIPTION OF COM?-

NO.

DOC.

DESCRIPTION IDENTITY WORK DATE (TAGTPNS)

I l-97-016 RC 327863 Valve NIRCPSV3450 Crosby N6049 l 1124 Replacal valve, new SN#

10-15-97 0007 N6M91-00-0003, and 4 Studs Gr. 660 B 1

1-97-017 RC 327862 Valve NIRCPSV3451 Crosby N6N91 1125 Replaccd valve, new 10-15-97 0008 SN# N6N91-00-0004 1

1-97-018 RC 32786I Valve N!RCPSV3452 Crosby N60491 1126 Replaced va ve, new SNd Its-15-97 0009 N60491-00-0005, and 4 studs II:# EV1 1

1-97-022 SG 351936 Inspection Port Steam Generator Westinghouse-M0764-1 N/A Drill rnd tap Secondary 10-16-97 Covers 2" Covers Astro Nuclear M0764-2 side covers for seal Dynamics Inc.

injection I

l-97-025 SG 356776 Steam Generator 1R121NSG101D Westinghouse 2134 W18694 Installed temporary 4-30-97 sealing device, drill and tap cover 1

8 97-033 RC 348208 Valve IR141XRC0001 A Westinghouse W750001 W14271 Drilled 3/16" hole in 10-li

'7 upstream side of disc 1

l-97-034 RC 32.5977 Valve IR141XRC0001B Westinghouse W7500ll W18058 Drilled 3/16" hole in 10 upstream side ofdisc 1

1-97-058 SG 332881 Steam Generator iR121NSG101 A Westinghouse 2131 W18691 Replaced helicoil Pt.d 10-14-97 (Primary Side) 4190-30-CN 3.750 I

l-97-059 SG 332882 Steam Generator 1R121NSGIO1B Westinghous-2132 W18692 Replaced 5 studinuts 10-15-97 new SNd (Primary Side) 643,623,636,692,613, 614,610,673,733,65i l

1 1-97-062 SG 332885 Steam Generator 1R121NSG101 A Westinghouse 213I W18691 Replaced inspection 10-14-97 l

(Secondary Side) covers new }{:# 331VNF, I

R6388, Cont.# MB-f 62398-M i

1-97-063 SG 332886 Steam Generator iR121NSG101B Westinghouse 2132 WI8692 Replaced inspaction 10-14-97 cover new lit # 33iVI!F, (Secondary Side)

R6388 ANII: H.lt RUSSELI. TX-826 Pagel

l SOUTil TEXAS PROJECT UNIT I ASME SECTION XI IRE 07 INSERVICE INSPECTION SUMM ARY REPORT FOR REPAIRS AND REPLACEMENTS (CLASS I AND 2)

CLASS R or R SYSTEM WORK COMPONENT COMPONENT MFG.

SERIAL NO.

NUN DESCRIPTION OF COMP.

NO.

DOC.

DESCRIPTION IDENTITY WORK DATE (TAGTPNS)

I l-97-064 SG 332887 Steun Generator 1R121NSG101C Westinghouse 2133 WI8693 Replaced inspection 10-14-97 cover new IIt# 33IYNF.

(Secondary Side)

R6388 1

1 97-065 SG 332888 Steam Generator IR121NSG101D Westinghouse 2134 W186',4 Replaced inspection 10-14-97 cover rew lit # 33 IYNF, (Seconday Side)

R6388 1

1-97-114 SG 355697 Steam Generator 1R12INSG101 A Astro Nuclear SN-M-1263-1 N/A Drilled, tapped holes, 10-14-97 Secondary machined photographic Manway Cover finish on manway ccver 2

1-95-057 CV 161367 Fiex Ilose CV-1132-IFli-Metal Bellows 007 n'a Replaced flange and 10-27-97 Assembly BB2 Corp.

reducer insert 2

1-95-073 S1 304734 Valve 2N1?lXS10016C Westinghouse W750003 W12%7 Drilled 3/16 hole in 6-17-97 upstream side ofdisc 2

1-95-074 S1 304732 Valve 2N121XS10016A Westinghouse W750001 W12054 D-illed 3/16 hole in 8-7-97 a side ofdisc 2

1-95-075 SI 304733 Valve 2N121XSI0016B Westinghouse W750002 W12055 Drilled 3/16 hole in 8-7-97 upstream t._de of disc 2

1-96-025 CC 312387 Valve 2R20lTCC0198 JRW Mission Q-5126 N/A Replaced valve, new SN#

10-14-97 90-1328-Ol(N)-02 2

1-96-072 CV 344923 Valve 2R171TCVC243 Borg Warner 29598 N/A Replaced valve, new SN#

10-15-97 95SD0202, Elbow lit #

BG, Pipe Ilt#

467477,470172 2

1-94 077 CV 341158 Valve 2R171TCV0246 Anderson A3848 N/A Replaced valve, new SN#

10-14-97 Greenwood EZ874-1-8, Pipe lite 470172, Elbow IIt# OJ 2

1-96-082 CV 341159 Valve 2R171TCV0247A Anchor / Darling EZ874-1-2 N/A Replaced valve, new SN#

10-14-97 A3841 Pipe lit # 470172.

Elbow lit # OJ 2

'l-96-084 CV 344924 Valve 2R171TCV0244 Anderson B3146 N/A Replaced valves, new 60-13-97 2R171TCV0245 Greenwood A3845 SN# E'.874-1-1.EZ874-I-7, Pipe lit # C7366 Elbow lit # BF A Nil: II.R. RUSSELI, TX-826 Page2 l

SOUTil TEXAS PROJECT UNIT I ASME SECTION XI IRE 07 INSERVICE INSPECTION

SUMMARY

REPORT FOR REPAIRS AND REPLACEMENTS (CLASS 1 AND 2)

CLASS R or R SYSTEM WORK COMPONENT COMPONENT MFG-SERIAL NO.

NBN DESCHililON OF COMP.

NO.

DOC.

DESCRIPTION IDENTITY WORK DATE (TAGTPNS) 2 1-97-005 FW 348360 Valve 2S131TFWO222 Kerotest ZN4-2 N/A Replaced valves, new 10-15-97 2S13ITFWO226 YM9-6 SN# 97ZV1012, g

97ZV10ll, 2

1-97-006 FW 352968 Valve 2S131TFWO467 Anchor / Darling E3326-23-1 N/A Replaced valve discs, 10-15-97 new SN# 24I,,208 2

1-97-007 FW 352968 Vahe 2S131TFWO468 Anchor / Darling E3326-23-3 N/A Replace valve discs, nc v 10-15-97 SN8 240,242 2

1-97-012 MS 356699 Valve ClMSPV7431 Control 35199-1-3 N/A Skim cut stem seating 10-16-97 Components, surface, existing seat ring, Inc.

plug, seating surface on existing plug 2

1-97-019 CV 356990 Valve N1CVFCV0202 Ametek 54-89-002 N/A Replaced valve plug, new 10-14-97 SN8 M-1243-1 2

1-97-020 CV 356988 Valve NIC v'FCV0201 Ametek

$4-89-001 379 Replaced valve plug, new 10-14-97 SN# M0930-1 2

1-97-021 FW 316829 Vaive 2S131TFWO220 verotest YM9-15 N/A Replaced valves, new 10-15-97 2S131TFWO224 ZN1-12 SNA 97ZV1010, 97ZV1013, Pipe lite 698814 2

1-97-029 WL 145597 Valve B1WLFV4913 WKM 70-119184 I877 Replaced valve plug new 10-14-97 Ilt# OA3557-2, seat 2

1-97-067 CV 345446 Flow Element NICVFE0132 '

Vickery-Simms K81067 N/A Replaced flow element, 10-14-97 new IIt# 33402 2

1-97-074 CV 316049 Ileat Exchanger SR171NilX102A Joseph Oat 2312-I A 486 Replaced studs new lite 10-14-97 Corp.

83038, nuts SN# 33120

)

2 1-97-104 MS 367705 Valve N1MSPSV7430B Dresser BT-2176 N/A Drilled hole in 10-14-97 j

compression screw 2

1-97-107 CV 359848 Valve 2R171TCV0014 Kerr*est CAB 16-25 N/A Replaced valve, new SN#

10-16-97 ASZ2-1 2

1-97-110 SI 362207 Valve 2N12'.510120A Anderson A3832 N/A Replaced valve, new SNd 9-3-97 Greenweal EZ874-1-4 ANil: H.R. RUSSELL, TX-826 Page3

SOUTH TL%AS PROJECT UNIT I ASME SECTION XI

. IRE 07 IN52RVICE INSPECTION

SUMMARY

REPORT FOR REPAIRS AND REPLACEMLNTS (CLASS 1 AND 2)

CLASS R or R SYSTEM WORK COMPONENT COMPONENT MFG.

SERIAL NO.

NBN DESCRIPTION OF COMP.

NO.

DOC.

DESCRIPTION IDENTITY WORK DATE (TAGTPNS) 2 1.-97-121 RC 355208 Support RC-1212-HS5002 ESI N/A N'A Removed / Reinstalled

.10-23 support and replaced 2 bolts / nuts Ht.# A-3^7 Gr.A.'A-553 Gr.A i

2 1-97-172 CV 344923 Support CV-1112-HF5006 Southwest Fab N/A N/A Removed / Reinstalled 10-15-97 l

i P Pe 5"P.

P I

t P

ANil: B.R. RUSSELL, TX-826 pageg

COVER SHEEI 1RE07 INSERVICE INSPECTION

SUMMARY

REPORT FOR SYSTEM PRESSURE TESTS

( CLASS 1 AND 2 )

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNIT 1 P. O. BOX 289 l

WADSWORTH TEXAS 77483 1

USNRC DOCKET NO: 50498 OF ERATING LICENSE NO: NPF-76 COMMERCIAL OPERATION DATE: AUGUST 25, 1988 TRACKED BY CR# 97-17559 Prepared q

by:

/e Is'27

- D.W. ECHA3D', Consulting Engineer y:

I c~p' M [-

/0 2X/77 C.A. MURFtY, Supervising Engineer

$ ~] E~2 O 2 D Y l -

f-

l l

SCOPE 1RE07 SYSTEM PRESSURE TESTS The examinations summe.rized in this report were performed in accordance with the 1983 Edition through Summer 1983 Addenda of the ASME Code,Section XI which is applicable to the South Texas Project Electric Generating Station, Unit 1. This report covers selected ASME Code Class 1 and 2 Systems / Components. Examinations and tests required by the Code are scheduled in accordance with " Inspection Program B" as defined in IWB-2412 and IV/! : 2412 for ASME Code Class 1 and 2 Systems / Components. All ASME Code Class I components were examined as prescribed by Table IWB-2500-1, Examination Category B-P which established the examination frequency at each refueling outage. The ASME Code Class 2 Systems / Components were selected on a prorated basis.

This prorated selection process will continue until all ASME Code Class 2 Systems / Components are uamined in accordance with Table IWC-2500-1, Examination Category C-II. This eyamination category for ASME Code Class 2 Systems / Components established the examinadon frequency at each inspection period. The remaining third period examinations are anticipated to be completed by the end (9/24/99) of the third inspection period and the first 10 year inspection Inten al.

l l' age 1 of 3 l

l'OllM NIS-1 OWNEl;'S ItEl'OllT FOlt INSEltVICE INSI'ECTIONS As required by the l'ro /isions of the ASME Code Itules 1.

Owner llomton Lighting & Power Company Electric Tower. P. O. Box 1700.11ouston. TX 77001 2.

Plant South Texas Project Electrie Generating Station P.O. Box 289. Wadsworth. TX 77483 3.

Plant Unit 1.

4. Owner Certnicate of Authorization (if required)

N /A 5.

Commercial Service Date 08'25/88 6. NationalIloard Number for Unit N/A 7.

Components inspected ash 1E CODE CLASS 1 PIPING AND COMPONEN1S Component or Manufacturer Manufacturer or State or National Appurtenance or installer installer Serial Province board No.

No.

No.

REAC' LOR VESSEL, COMBUSTION ENGR /

11073 N/A 22190 IR10lNRV10l A WESTINGilOUSe gM)

STM. GENERATOR I A WESTING H')UF E (M) 2131 N/A Wl8691 IR12iNSG101 A SIM. GENERAIOR 111 WESTINGilOUSE(M) 2132 N/A W18692 IR121NSG10ll!

STM, GENERA' LOR IC WESTINGilOUSE (M) 2133 N/A Wl8693 1R121NSG101C STM. GENERATOR ID WESTINGilOUSE (M) 2134 N/A Wl 8694 pl21NSGl0lO PRESSURIZER I A WESTINGilOUSE (M) 2141 N'A W18590 1RillNP7101 A RCPUMPIA WESTINGilOUSE (M) 1-il5E580G01 N/A 28 IR131NPPl01 A RC PUMP 111 WESTINGilOUSE (M) 2-Il5E580G01 N/A 29 IR131NPP101B RC PUMP IC WESTINGilOUSE (M) 3 115E580001 N/A 30 1R131NPP10lc RC l' UMP ID WLiSTINGilOUSE (M) 4 ll5E580G01 N/A 31

]

IRl31NPP101D CLASS i PIPING EllASCO (l)

N/A N/A CLASS I VALVES V ARIOUS N/A N/A N/A Note: Supplemental sFeets in the form of lists, sketches, or drawings may be used, provided (1) ize is 81/2 in. X 1 I in., (2)

Information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form

Page 2 of 3 FORM NIS I (Back) 8.

Enamination Dates 07/25/96 to 10/10/97 9. Inspection Interval from 08/25/88 to 09/24/99 10.

Abstract of Examinations. Include a list of examinations and a statement concerning status of work required for current interva', Refer to Supplemental Sheet Page 3 of 3.

I 1.

Abstract of conditions Noted No relevant conditions affecting pressure retaining boundaries were noted.

12.

AbstrsM uf Corrective Measures Recommended and Taken F

1 to Supplemental Sheet Page 3 of 3.

We certify that the statements made in this report are correct and the examinations and corrective measures taken conform to the rules of the ASME Code.Section XI.

Certificate of uthorization No. (if applicable) _

N/A Expiration Dat N/A Date

// f 19k Signed Houstan Lichting & Power Co. Pyb O

'/

Owner

[V F51.

shley Reliabil'

'ngineering Manager CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of. Texas and employed by Arkwricht.11gmal Insurance Co. of Waltham. MASS. have inspected the components described in this Owner's Report during the p:riod ~7/a5/16 to /0/1of C and state that to the best of my knowledge and belief, the Owner has performed exami'nationsand taken corrective measures describeo in this Owner's report in accordance with the inspection plan and as required by the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or imphed, concerning the examinations and correcde measures described in this Owner's Report. Furthermore, neither the Inspector nor his em yet shall be in ny manner for any personal injury or perperty damage or a loss or any kind crising from or e nnes ted th tigins ion.

/

Commissions x l6l An n,-M " O

5..! L.:R, inspector's 8ignature National Board, State, Province, and Endorsements M ab/n Date.

19 d

1 1

- - ~..

l Page 3 of 3 SUPPLEh1 ENTAL PAGE FOR ASME CODE CLASS 1 PIPING AND COMPONENTS 1.

Owner llouston Lighting & Pour Comnany Electric Tow er. P. O. Box 1700Jiouston. TX 77001 2.

Plant South Texas Poriect Electric Generating Station P.O. Box 289 %dswonh. TX 77483 3.

I'lant Unit 1

4. Owner Cenificate of Authorization (if required)

N/A 5.

Commercial Service Date 0125/ftfL 6. National Board Number for Unit N/A 10.

ABSTRACT OF EXAMINATIONS A System Leakage Test as prescribed in IWA-5211(a) for all ASME Code Class 1 Pressure Retaining Conponents was conducted in accordance with Table IWB-2500-1, Examination Categorv B P, Itc.n Nos. Bl5.10, B15.20, B15.30, B15.40, B15.50, B15.60, and B15.70.

T;.e Pressure Test and VT-2 visual examinations were conducted in accordance with Plant Surveillance Pressure Test Procedure,9Ph 15-RC-000), Reactor Coolant System Leakage Pressure Test (Rev. 3) at the conclusion of the seventh refueling outage. ASME Code Class 1 piping and valves are specifically identified in the above referenced procedure.

12.

ABSTRACT OF CORRECTIVE MEASURES RECOMMENDliDJND TAKEN The Visual Examina ions (VT-2) performed during the Pressure Test found mmot leakage at mechanicaljoints such as valve stems and flanged connections. These leaks were evaluated and determined acceptable for continued operation. Appropriate corrective action was initiated to cmrect these leaks.

l Page 1 of 3 FORM NIS-1 OWNER'S REPORT FOR INSERVICE INSPECTIONS As required by the Provisions of the ASME Code Rules 1.

Owner.}Jouston Lichtino & Power Comoarns Electric Tower. P.O. Box 1700. Houston. TX 77001 (Name and Address of Owner) 2.

Plant JoultLlexas Project Electric Generating. Station P.O. Box 289. Wadsworth. TX 77483 (Name and Address of Owner) 3.

Plant Unit 1

4. Owner Certificate of Authorization (if required)

N/A 5.

Commercial Service Date 08/25/88

6. National Board Number for Unit N/A 7.

Components inspected ASME CODE CLASS 2 PIPING AND COMPONENTS I

I Manufacturer Component or Manufacturer or Installer State or National Appurtenance or installer Serial No.

Province No.

Board No.

REGEN HX 1 A JOSEPH OAT CORP 2380-1 A N/A 2051 2R171NHX101A LETDOWN HX 1 A JOSEPH OAT CORP 2312-1 A N/A 986 SR171NHX102A EXCESS LETDN HX 1 A JOSEPH OAT CORP 2L12-3A N/A 988 SR171NHX103A RHR HX 1 A JOSEPH OAT CORP J-2312-4 A N/A 990 2R161NHX101 A RHR HX 1B JOSEPH OAT CORP J-2312-48 N/A 991 2R161NHX101B RHR HX 1C JOSEPH OAT CORP 2312-4C N/A 992 2R161NHX101C RHR PUMP

  • A PACIFIC PUMP 51731 N/A 343 2R161NPA'01 A RHR PUMP 1B PACIFIC PUMP 51732 N/A 344 2R161NPA1018 RHR PUMP 1C PACIFIC PUMP 51733 N/A 345 2H161NPA101C ASSOC. CLASS 2 EBAGCO (1)

N/A N/A N/A PIPING ASSOC. CLASS 2 VARIOUS N/A N/A N/A VALVES RCFC COILS AM'IRlCAN AIR FILTER VARIOUS N/A VARIOUS 11 A,12 A,11 B,12R,11 C, AND 12C Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) sizo is 81/2 in.

Note:

X 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each 1

sheet is numbered and the number of sheets is recorded at the top of this form.

i, ao2

c.

Page 2 of 3 FORM NIS-1 (Back) 8.

Examination Dates 07/2519L to 10/10/97 - 9. Inspection laterval from _Q8/25/88 to 09/24/99

10. Abstract of Examinations, include a list of examinations and a statement concerning status of work required for current interval. Refer to Supplemental Sheet Page 3 of 3.
11. Abstract of Conditions Noted No relevant conditions affecting pressure retaining boundaries were noted.
12. Abstract of Corrective Measures Recommended and Taken Refer to Supplemental Sheet Page 3 of 3.

We certify that the statements mado in this report are correct and the examinations an corrective measures taken conform to the rules of the ASME Code,Section XI.

Certificate of Authorization No. (if applicable)

N/A Expiration Date N/A Dato // 5 19N Signed

/

Houston Lichtina & Power Co.

By /

%.S ashley Owner Reliability igineering Manager CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the NatiorM Joard of Coiler and Pressure Vessel inspectors and the State or Province of __IcKas_.and employed by fikwrioht Mutual Insurance Co. of WalthDm. MASS., have inspected the components described in this Owner's Report during the period 7/3[%

to /C/loI'll

. and stem that to the best of my knowledge and belief, the Owner has performed examinations 'and taken corrective measures described in this Owner's Reoort in accordance with the inspect.on plan and as required by the ASME Code,Section XI.

By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, conceming the examinations and entrective measures described in this Owner's Report. Furthermore, neither the Inspector nor h' employer shall be liable in any manner for any personal injury or property damage or a loss of any ' d a sing from or connected with this inspection.

FACTORY MUTUAL SYSTEM

/

N X

I Commissions M 28-i1; inspbetor's Signature National Board, State, Province, and Endorsements e

Date 19 q

track 12

~-

Page 3 of 3 SUPPLEMENTAL FOR ASME CODE CLASS 2 PIPING AND COMPONENTS 1.

Owner Houston Liahtino & Power Comoany Electric Tower. P.O. Box 1700. Houston. TX 77001_

(Name and Address of Owner) 2.

Plant. South Texas Pro _iect Electric Generatina Station P.O.E.ox 289. Wadsworth. TX 77483 (Name and Address of Owner) 3.

Plant Unit 1

4. Owner Certificate of Authorization (if required)

N/A h.

Commercial Service Date 08/23/88

6. National Board Number for Unit.

N/A

10. ABSTRACT OF EXAMINATIONS System Functional and Inservice Pressure Tests as prescribed by IWA-5211 (b) and (c), respectively, were conducted on selected ASME Code Class ' pressure retaining components in accordance with Table IWC-2500-1, Examination Category C H, item Nos. C7.20, C7.40, C7.60 and C7.80.

The Pressure Tests and VT-2 visual examinations were conducted during the third period of examination in accordance with the following Plant Surve:11ance Pressure Test Procedures:

OPSP15 CC-0001-Component Cooling Water System inservice Pressure Test OPSP15-CM-0001 -RCB H Monitioring Functional Pressure Test, 2

OPSP15-CV-0007 -Chemical and Volume Control System inservice Pressure Test (IRC)

OPSP15 RC-0001 -Reactor Coolant System Leakage Pressure Test OPSP15-RH-0001 -Residual Heat Removal System inservice Pressure Test ASME Code Class 2 piping and valves are specifically identihed in the above referenced procedures. These test procedures were conducted during the time period of July 25,1996 to October 10,1997.

12. ABSTRACT OF CORRECTIVE MEASURES RECOMMENDED AND TAKEN The Visual Examinations (VT-2) performed during these Pressure Tests found only minor leakage at mechanical joints such as valve stems and flanged connections.

These leaks were evaluated and determined acceptable for continued system operation. Appropriate corrective action was initiated to correct these leaks.

wom

_ _ _. _ _ _ _ _ _ _