November 20, 1997-Mr. James W. Langenbach Vice President and Director Three Mile Island '
GPU Nuclear, Inc.
Route 441 South-P. O. Box 480 Middletown, PA 17057-0480
SUBJECT:
PLANT PERFORMANCE REVIEW - THREE MILE ISLAND 1
Dear Mr. Langenbach:
On October 22,1997, the NRC staff completed the semiannual plant performance review (PPR) of the Three Mile Island 1 reactor facility. The staff conducta d ase reviews for all operating nuclear power plants to develop an integrated understanding of safety performance. The results are used by NRC management to facilitate planning and allocation of inspection resources. The PPR for Three Mile Island 1 involved the participation of all technical divisions in evaluating inspection results and safety performance information for the period April 1997 to September 1997. The PPR provides NRC management with a current summary of licensee performance and serves as input to the NRC systematic assessment of licensee performance (SALP) and senior management meeting (SMM) reviews.
This letter advises you of our planned inspection effort resulting from the Three Mile Island 1 PPR. It is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite. The enclosure details our inspection plan at Three Mile Island 1 for the remainder of the current SALP period which ends January 24,1998. Resident inspections are not listed due to their ongoing and continuous nature.
We willinform you of any changes to the inspection plan. If you have any questions, please contact me at (610) 337-5234.
Sincerely, 7A
/
,p Peter W. Eselgruth, Chief Projects Branch 7 j
Dwision of Reacto; Projects
,I, Docket No.- 50-289 h
I
Enclosure:
Three Mile Island 1 Inspection Plan 9712010d42 971 20 lll lll PDR ADOCK 05000289 G
t Mr. James W. Langenbach
-2 cc w/ encl:
E. L. Blake, Shaw, Pittman, Potts and Trowbridge (Legal Counsel for GPUN)
J. C. Fornicola, Director, Nuclear Safety Assessment M. J. Ross, Director, Operations and Ma!ntenance D. Smith, PDMS Manager TMI-Alert (TMIA)
J. S. Wetmore, Manager, TMI Regulatory Affairs Commonwealth of Pennsylvania Distribution w/encI:
Region i Docket Reom (with concurrences)
Nuclear Safety information Center (NSIC)
PUBLIC NRC Resident inspector H. Miller (RA)
P. Eselgroth, DRP N. Perry, DRP D. Haverkamp, DRP A. Linde, DRP DRS Director DRS Deputy Director M. Oprendek, PPRs K. Kennedy, OEDO P. Milano, NRR, PDI 3 B. Buckley, PM, NRR, PDI 3 L. Thonus, NRR S. Weiss, NRR R. Correia, NRR F. Talbot, NRR DOCDESK inspection Program Branch, NRR (IPAS)
DOCUMENT NAME: G:\\ BRANCH 7\\PPRL1197.TMI n,m*.. e, os m. eco nt. ineesi. m the ws:
C* = Copy mthout enachmenuencloswa "P = Copy mth euechmenvencloswo T = No copy 0FFICE. Rl/ORP Ic. Rl/DRd is
/
1 l
[
NAME DHaverkamp Af>J-PE M toth DATE 11/20/97 11/2p /97 11/
/97 11/
/97 11/
/97 0FFICIAL RECORD COPY
THREE MILE ISLAND INSPECTION PLAN INSPECTION TITLE / PROGRAM AREA PLANNED INSPECTION PROCEDURE DATES TYPE 40500 Effectiveness of Licensee Controls in Identifying, Resolving, and 11/12-21/97 Core Preventing Problems.
81700 Physical Security Program for Power Reactors - Visit No. 2 11/17-19/97 Core 8475'.
Radioactive Waste Treatment, and Effluent and Environment.I 11/17-21/97 Core Monitoring (Efheats) 71001 Licensed Operator Requalification Program Evaluation 1/19-23/97 Core NOTE:
Does not include core resident inspections: 71707 (plant operations), 61726 (surveillance), 62707 (maintenance), 37551 (onsite engineering), and 71750 (plant support activities).