ML20199H888

From kanterella
Jump to navigation Jump to search
Confirms 971117 Telcon Between W Pike & Ninh Re Engineering Meeting on Technical Issues Requested by Utility.Meeting Scheduled for 971211
ML20199H888
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 11/18/1997
From: Jaudon J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Richard Anderson
FLORIDA POWER CORP.
References
NUDOCS 9711260250
Download: ML20199H888 (3)


Text

.. -

^

e Novenber 18,;1997 Florida Power Corporation Crystal River Energy Complex Mr. Roy A. Anderson (SA2A)_

Sr. VP.- Nuclear Operations ATTN: Mgr.. Nuclear Licensing 15760 West Power Line Street Crystal River. FL 344 8-6708

SUBJECT:

PUBLIC MEETING - CRYSTAL RIVER 3 ENGINEERING MEETING CRYSTAL RIVER 3 - DOCKET N0. 50-302

Dear Mr. Anderson:

t This letter confirms the tele) hone conversation between Mr. W. Pike of your

= staff and Mr. S. Ninh of the iRC on November 17, 1997. concerning an engineering meeting on technical issues requested by Florida Power Corporation. The meeting is scheduled for December 11. 1997. from 3:00 p.m.

to 5:00 p.m.

3 The location of the meeting will oe at-your Training Center in Room 137. This meeting is an open meeting as per " Staff fleetings Open to che Public: Final Policy Statement" (September 20. 1994. 59 FR 48340).

Should you have any questions concerning this meeting, please contact me at (404) 562-4600.

Sincerely.

WWWIAL80NED8Y DOSP.J4000N Johns P. Jaudon, director Division of Reactor Safety Docket No. 50-302 License No. DPR-72 cc:

John-P. Cowan. Vice President Nuclear Production -(SA2C)

Florida Power Corporation

)

Crystal River Energy Complex

3

'15760 West-Power Line Street h

. Crystal River.. FL 34426-6708

.cc:

Continued see page 2 9711260250 971118 b

h TEYS

l FPC 2-cc:

Continued C-G. Pardee LDirector Nuclea' Plant Operations (NA2C)

FPC, Crystal River Energy Complex 15760 West Power Line Street Crystal River. FL _34428-6708 Robert E.'Grazio. Director Nuclear Regulatory Affairs (SA2A)

FPC, Crystal River Energy Complex 15760 West Power Line Street Crystal River, FL =34428-6708-

-James S. Baumstark Director Quality Programs (SA2C).

FPC, Crystal River Energy Complex 15760 We.st Power Line Street Crystal River, FL 34428-6708 R. Alexander Glenn, Corporate Counsel Florida Power Corporation MAC - ASA P._0. Box 14042 St. Petersburg, FL 33733-4042

-Attorney General Department of Legal Affairs The Capitol Tallahassee, FL 32304 Bill Passetti Office of Radiation Control Dept of Health and Rehab. Serv.

1317 Winewood Boulevard Tallahassee. FL 32399-0700 Joe Myers, Director Div. of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee,'FL 32399-2100 t

Chairman BJard of County Commissioners Citrus County 110 N. Apopka Avenue

' Inverness FL 34450-4245.

Robert B. Borsum Framatome Technologies

'1700 Rockville Pike Suite 525 Rockville, MD 20852-1631

P LFPC:

3 Distribution:

e 1Hard Paoer Cooy

'R. Borchardt. DISP /PIPB-RII Regional Coordinator, OEDO (17G21)-

J. Lieberman, OE F. Hebdon.-Director,. Project Directorate II L. Raghavan, NRR J. Johnson. RII L. Plisco, RII-J. Jaudon, RII B. Crowle.y. RII R. Schin, RII P. Steiner, RII F. Wright, RII L. Stratton, Ril Region II Reception'.st

PUBLIC

'NRC Pesident Inspector U.S. iuclear Regulatory Comm.

l 6745 N Taliahassee Road l

Crystal River. FL 34428 e.

fLJiail, Meeting Announcement Coordinator. 0ADM/DFIPS (PMNS)

Region II Administrator's Secretary DRF Division Secretary Region II Division Directors and Deputies Region II Public Affairs Officer

' Region II Security Officer Chief, RAB, AE00 Headquarters Operations Officer a

i UFFIChi -

Ell:INtP Ril:DRP l

r.

w NME-

. g att Klandis Dr.TE 11/ ]- /V7 / Vl/ (g-/V7 11/-

/V7-11/

/77 11/

/97 11/

/97 11/

/V7 uri r YEli 80 YE5 NO YES NO YE5 NO YES NO YES NO YES NO OFFICIAL RECOND COPY DOCLANENT MAME: Ga\\ crystal \\mmeting\\ctnot12.11

-