Partially Withheld Memo Forwarding List of Facility Summary Disposition,Proposed Assignments & Schedule for Completion, Per 840712 Request
ML20199H325
Person / Time
Site: 05000000, Comanche Peak
Issue date: 07/29/1984
From: Ippolito T
Office of Nuclear Reactor Regulation
To: Knight J
Office of Nuclear Reactor Regulation
Shared Package
ML17198A302 List: ... further results
References
FOIA-85-299, FOIA-85-59, FOIA-86-A-18, FOIA-86A-18, FOIA-A-18 NUDOCS 8607030270
Download: ML20199H325 (3)


Text

--

f L.

t_

lq/u/U

/

g g

(

~ f ~...,

.i UNITED STATES NUCLE AR REGUL ATORY cot.". MISSION j

~

{, ).,y,:l,s{-

!y v.e smr.cToN o c 20s55 j

3, >.01k/ /

./

July 29,1952

(

^

MEMDRC;DJ' FOR: James P. Knight, Assistant Director

)

for Compor.ents and Structures Engineering Division of Engineering gr 1

THRU:

Darrell G. Eisenhut, i/

Division of Licensun]s FROM:

Thomas A. Ippolito, Project Director Comanche Peak Division of Licensing COMANCHE PEAK - ASSIGriMENT Af;D SCHEDULE FOR COMPLETICN

SUBJECT:

OF

SUMMARY

DISPOSITIONS ON M ISSUES 1

12, 1984, you requested the Cc anche Peak Technical q

By memcrancum dated July Review Team (TRT) include in their review theMissues raised thrcugh In a telephone disc:!ssion on July 16, 1954, I informed ycu the ASLE hearing.

that I was develeping a plan for obtaining the rescurces necessary to address En-the subject issues in a time frame consistent with the hearing schedule.

closed herewith is a list of the Comanche Peak sumary dispositions, prc::osed assignments, and a schedule for their completion.

As ycu may note, DE person-nel are designated to respond to three (3) of the twenty-one (21) dispositions.

Picase review this enclosure and confirm that the propcsed assignments and the scheduled completion dates can be met.

I can be reached on extension 2701* or at the Cccanche Peak plant site on (817) 897-3167.

. g__

hThomas n.$2-O bL K Ippolito, Project Director Coranche Peak Division of Licensing

Enclosure:

As stated cc:

H. Denton E. Case R. Vollmer L. Shao J. Scinto S. Trety G. I'iruno

+ " *

j., y E. Youn;; blood

},(,-l 1 ;...\\ <.,

s*

I; ;

8607030270 860623 PDR FOIA

'3 q lV GARDE 86A-18 PDR

.f, f

' G

f

- ~.

ENCLOSURE Comanche Peak Summary Dispositions Persons Scheduled Assigned /

Completion Received Affiliation Date 1.

Pipe Support Design Process Yes R. Enos/ Parameter 09/14/84 (cc.bined w/6)

T. King / Parameter D. Landers / Parameter 2.

Stability Yes D. Terao/NRR 08/10/84 3.

U-bolt Cinching (Combined Yes H. Fleck /ETEC 09/14/84 w/4 and 5)

J. Brammer/ETEC P. Chen/ETEC 4

Effects on U. Bolts Yes H. Fleck /ETEC 09/14/84 J. Brammer/ETEC P. Chen/ETEC 5.

Stress on Pipes Due to Yes H. Fleck /ETEC

~

U-Bol ts J. Brammer/ETEC.

09/14/84 P. Chen/ETEC 6.

App Response to NRC Re Weld Yes P. Chen/ETEC 09/14/84 Audit (combined w/1) 7.

ASME/AWS Welding Code a.

1 Resolved by Terao Yes D. Terao/NRR Complete b.

2nd In Process Yes D. Terao/NRR 08/10/84 8.

Upper Lateral Restraint Yes P. Kuo/NRR 08/30/84 C. Costantino/BNL C. Miller /BNL 9.

Generic Stiffness Yes J. Fair /IE 08/10/84

10. Richmond Inserts (Bolts)

Yes J. Fair /IE 08/10/84 (Cortired w/11)

11. Richrend Inserts (Torque)

Yes J. Fair /IE 08/10/84

12. Evaluation of All Walsh/Doyle No H. Fleck /ETEC 09/21/84 Supports J. Brammer/ETEC P. Chen/ETEC m

u

(.

~

ENCLOSURE (CONT'D)

Persons Schedulec Assigned /

Completic-Received Affiliation Date

13. Wall to-Wall / Floor to Yes H. Fleck /ETEC 08/31/84 Ceiling Support J. Brammer/ETEC P. Chen/ETEC
14. U-Bolts As 2 Way Restraints Yes J. Fair /IE 08/10/84
15. Torsional Resistance of Axial Yes H. Fleck /ETEC 08/14/84 Restraints J. Brammer/ETEC P. Chen/ETEC 16 Damping Factors Yes J. Fair /IE 08/10/84 17 Safety Factors Yes J. Fair /IE Complete 18.

Friction Due to Small Thermal Yes J. Fair /IE Complete Movements

19. Local Displacements and Yes H. Fleck /ETEC 08/10/84 Stresses J. Brammer/ETEC P. Chen/ETEC
20. Section Property Values Yes J. Fair /IE Complete

- 21.

Effects of Gaps on Seismic Yes J. Fajr/IE Complete

Response