Submits 1998 Annual Rept on Safety Relief Challenges for Pbas as Required by TMI Action Plan,Item II.K.3 & PBAPS TRM App a Item 5.0 R17
ML20199F354
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 01/13/1999
From: Doering J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
TASK-*****, TASK-TM NUDOCS 9901210298
Download: ML20199F354 (1)


Text

John Doering, Jr.

C Vice President d

Peach Bottom Atomic Power Station y

PECO NUCLEAR esco rne<2<comne v 1848 Lay Road A Unit of PECO Energy Detta, PA 17314-9032 717 456 4000 Fax 717 456 4243 E-mat idoenng@peco-energycom January 13,1999 Docket Nos. 50-277 and 50-278 U.S. Nuclear Regulatory Commission Document Control Desk

'Nashington, D.C. 20555

SUBJECT:

1998 Annual Report on Safety Relief Challenges for the Peach Bottom Atomic Power Station Gentlemen:

This represents the 1998 Annual Report on Safety Relief Challenges for Peach Bottom Atomic Power Station (PBAPS) as required by the TMl Action Plan, item II. K.3, and by PBAPS Technical Requirement Manual Appendix A Item 5.0 R17. During 1998 there were no automatic actuations of the Main Steam Safety or Main Steam Relief Valves in response to high reactor pressure.

If you have any questions regarding this matter, please call.

Sincerely, Y.

John Doering, Jr.

Vice President, 1

Peach ottom Atom Power Station i 0 9p ($

JD/

/PJD/JJB

lik cc:

N. J. Sprout, Public Service Electric & Gas R. R. Janati, Commonwealth of Pennsylvania

/

R. I. McLean, State of Maryland i

h (o

H. J. Miller, Administrator, Region I, USNRC A. C. McMurtray, USNRC, Senior Resident inspector l

A. F. Kirby, Ill, Delmarva Power & Light INPO Records Center A. Winter, PBAPS Experience Assessment Correspondence Control Desk,61B-3 9901210298 990113 PDR ADOCK 05000277 R

PDR d

i CCN 99-14006 l