ML20199E310
| ML20199E310 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 11/13/1997 |
| From: | Langenbach J GENERAL PUBLIC UTILITIES CORP. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20199E315 | List: |
| References | |
| 6710-97-2478, NUDOCS 9711210161 | |
| Download: ML20199E310 (1) | |
Text
,
6 a'
{
~
Route 441 South GPU Nucleat. Inc.
g NUCLEAR
'**'C"*'******
Middletown. PA 17:157 0480 Tel 717 944 7421 l
(717)948-8005 November 13, 1997 6710-97-2478 U.S. Nuclear Regulatory Commission Attentior: Document Control Desk Washington,DC 20555 Gentlemen:
Subject:
Three Mile Island Nuclear Station, Unit 1 (TMI-1)
Operating License No. DPR-50 Docket No. 50-289 Cycle 12 Core Operating Limits Report, Revision 0 Pursuant to TMI-l Technical Specification Section 6.9.5.4, enclosed is a copy of the Cycle 12 Core Operating Limits Report (COLR), Revision 0. The Cycle 12 COLR, Revision 0, provides the cycle-specific limits established to support operation of Cycle 12 up to 678 Effective Full Power Days _(EFPD) and provides an updated list of references. The cycle-specific core operating limits contained in this report have been determined in accordance with Technical Specification 6.9.5.
If additional information is required, please contact us.
Sincerely,
\\
\\
James W. Langen ach Vice President and Director, TMI
/DJD Encl.: TMI-l Cycle 12 Core Operating Limits Report, Topical Report 110, Re Msion 0 Cc: Administrator, Region 1 TMI Senior P.esident Inspectc:
TMbt Senior Project Manager hh 9711210161 971113 PDR ADOCK 05000289 --
p PDR
_ _ _ ________