UNIT Eo ST ATES f * " %,y$,

NUCLEAR REGULATORY COMMISSION

/,

i REoloN tv Ih i

k,'8Oh[//

61) RY AN PL AZA oRivf. SulT E 400 ARLINotoN, TE XAS 760118064 LOV l 4 j99'l 9

G. R. Horn, Senior Vice President of Energy Supply Nebraska Public Power District 141415th Street Columbus, NeL aska 68601 SEMIANNUAL PLANT PERFORMANCE REVIEW (SPPR)- COOP

SUBJECT:

STATION

Dear Mr. Horn:

On October 8,1997, the NRC staff completed the Semiannu operating nuclear power plants to develop an integrated understanding of safety performance. The results are used by NRC management participation of all technical divisions in evaluating inspection results and safety performance information for the period April 1997 through September 1997. SP provide NRC management with a current summary of licensee performance and se inputs to the NRC Systematic Assessment of Licensee Performance (SALP) and S Management Meeting (SMM) reviews.

This letter advises you of our planned inspection effort resultirig from the Cooper Nuc Stotion SPPR review. It is provided to minimize the resource impact on your staff and allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite. The enclosure details our inspec so that you are aware of the reason for emphasis in these program areas. The regio initiative inspection scheduled is consistent with SALP assessments. Resident inspe are not listed due to their ongoing and continuous nature.

We willinform you of any changes to the inspection plan if you have any questions, please contact Elmo Collins at (817) 860-8291.

Sincerel N

\\

omas P. Gw Tn, Di e tor Division of Rea or oj cts

)

l Docket No. 50 298 License No.. DPR-46 lil.l!ll.l!al,l!Illl il!!Illljpli 9711210121 971114 PDR ADOCK 05000290 POR 0

_ _ ; gy.-

4'~

g y:U-ef -

~

4_

,l

?.* :

1 Nebraska Public Power District -

"a2+ -

--i

j

Enclosure:

.i inspection Plan -

. cc w/ enclosure:'.

John R. McPhail, General Counsel i

Nebraska Public Power District 1

- P.O. Box 499 -

- Colu'mbus,- Nebraska 68602 0499 P. D. Graham, Vice Presloent of Nuclear Ene.gy 7

Nebraska Public Power District l

' P.O. Box 98 Brownville, Nebraska 68321 B. L. Houston, Nuclear Licensing and Safety Manager Nebraska Public Power District P.O. Box 98

= Brownville, Nebraska ' 68321~-

'Dr.3Niiliam D. Leech MidAmerican Energy 907 Walnut Street P.O. Box 657 Des Moines, Iowa 50303-0657 Mr.'Ron Stoddard-Lincoln Electric System 11th and O Streets Lincoln, Nebraska-68508 Randolph' Wood, Directer Nebraska Department of Environmental

- Quality

~ P.O. Box 98922 Lincoln, Nebraska-68509-8922

- Chairman :

Nemaha County Board of Commissioners.

Nemaha County Courthouse 1824 N Street.

Auburn,-. Nebraska._68305_

c 4

-a,

_.1 ;.

o

..}

{

i 4

. Nebraska Public Power District '

3-r Cheryl Rogers, LLRW Program I;1anager '

Environmental Protection Section 1

Nebraska Department of Health

-301 Centennial Malli South.

i

~-

. P.O. Box 950072 Lincoln, Nebraska-68509 5007 s

David P. Schor, MD,' MPH,- FAAP-J Low Level Radioactive _ Waste Program-HHS Regulation and Licensure,

- P.O. Box 95007 Lincoln, Nebraska _68509 5007 R. A. Kucera, Department Director

-of Intergovernmental Cooperation Department of Natural Resources-P.O. Box 176 Jefferson City, Missouri 65102

- Kansas Radiation Control Program Director d

L t

E

+

b A

s-v tm

-'n, n-+,,

mws.-

-r.n s-~..

- e n

wrx

^

_.. ~...

4

=.:

.Nebtaska Public Power D,' strict :

t:

F

-bec to DCD (IE01) bec distrib. by RIV:

~ Regional Administrator' Resident inspector DRP Director -

DRS PSB

' Branch Chief (DRP/C)

MIS System Branch Chief (DRP/TSS)

RIV File Project Engineer (DRP/C)

DOCUMENT NAME: R:\\_CNS\\CNSP9704.LTR

- To receive copy of document, Ind6cate in bou: "C' = Copy without enclosures "E" = ';opy with enclosures "N" = No copy RIV:PE:DRP/C C:DF}P/C D:DRS p

D:DRP g

CSMarschell;df (94 EE06ffMs ATHowell '/# TPGwytin

/y 10/70/97 10/2/ /97 19/ /(/97 (W 1p/ /l/97. ' (/

OFFIC.AL RECORD COPY 1

t

.s

'-l7

~ Nebraska Public' Power District <

J-4 J W :I II !997

~

9

s --

bcc~ to DCD_(IE01):-

bec distrib. by RIV:

Regional Adminit.'rator_-

Resident inspector '

DRP Director

DRS-PSB -

Branch CN1f (DRP/C)

MIS System Branch Chief (DRP/TSS)

RIV File --

Project Engineer _(DRP/C)

,k D

T 7-.

N

. DOCUMENT NAME: R:\\ CNS\\CNSP9704.LTR

~

To receive copy of document. inoicate in boa: "c = copy weout enciosures "E" = Copy with enclosures "N" = No copy RIV:PE:DRP/C C:DR,PfC -

D:DRS D:DRP g

CSMarschall:df 3-EEG6 tikis ATHowell TPGwynn //

10/ ^, - /97 10/ffl/97 i 19/ r;;/97 10/ /p97-G OFFICIAL RECORD COPY

)

.-:Ek INSPECTION PLAN COOPER NUCLEAR STATION IP - Inspection Procedure T1 - Temporary Instruction Core Inspection - Minimum NRC Inspection Program (mandatory all plants)

INSPECTION TITLE /

NUMBER OF DATES TYPE OF INSPECTION / COMMENTS PROGRAM AREA INSPECTORS IP 93801 Design Basis inspection 6

11/17-21/97 Headquarters Team IP 71001 Licensed Operator 2

11/17-21/97 Regional Initiative Requalification Program Evaluation IP 84750 Environmental 1

11/17-21/97 Core IP 71715 Sustained Operations 1

12/9-12/97 Core Observation iP33801 Design Basis inspection 6

12/1-5/97 Headquarters Team IP 81700 Physical Security Program 1

1/5-9/98 Core inspection IP 83750 Occupational radiation 1

1/12-16/97 Core exposure IP 93809 Safety System Engineering 5

2/9-13/98 Safety Initiative, improved Technical 2/23-27/98 Specifications IP 84750 Radwaste Management 1

2/23 27/98 Core Inspection IP 82701 EP Operational Status 2

3/9-13/98 Regionallnitiative IP 37550 Focus inspection 3

4/6-10/98 RegionalInitiative IP 37550 Focus inspection 3

6/1-5/98 Regional initiative

- Tentative dates and team sizes e