ML20199E193

From kanterella
Jump to navigation Jump to search
Advises of Planned Insp Effort Resulting from Plant Semiannual Plant Performance Review.Details of Insp Plan for Next 8 Months Encl
ML20199E193
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 11/14/1997
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Gambhir S
OMAHA PUBLIC POWER DISTRICT
References
NUDOCS 9711210118
Download: ML20199E193 (5)


Text

.

-+

p ** "N%g.

' UNITE D ST ATE S

j. '$f NUCLEAR REGULATORY COMMISSION 3.[
  • -)

-j' REoloN IV -

~

'611 RY AN PLAZA DRIVE, $UITE 400

. /

AR LINoToN, T E X AS 76011 8064.

'1,-

g3

[S. K. Gambhir, Division Manager d

Engineering-& Operations Support-Omaha Public Power District

~ f ort Calhoun Station FC-2 4 Adm.

P.O. Box 399 Hwy. 75 North of Fort Calhoun Fort Calhoun, Nebraska. 68023 0399

SUBJECT:

SEMIANNUAL PLANT PERFORMANCF EVIEW (SPPR).- FORT CALHOUN

- STATION

Dear Mr. Gambhir:

On October 9,'1997, the NRC staff completed the Semiannual Plant Performance Review (SPPR; M Fort Calhoun Station. The staff conducts these reviews for all operating nuclear power plants to develop an integrated understanding of safety performance. The results are used by NRC management to f acilitate p;anning and allocation of inspection resources. The SPPR for Fort Calhoun Stati_on involved the participation of all technical-divisions in evaluating inspection results and safety performance information for the period 1

of March to September 1997. SPPRs provide NRC management with a current summary of licensee r 1rformance and serve as inputs to the NRC Systematic Assessment of Licensee Performance (SALP) and Senior Management Meeting (SMM) reviews.

This letter advises you of our planned inspection effort resulting from the Fort Calhoun Station SPPR review. It is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite. -The enclosure details our inspection plan for the next 8 months.

The rationale or basis for each inspection outside the core inspection program is provided so that you are aware of the reason for emphasis in these program areas. Resident inspections are not listed due to their ongoing and continuous nature.

- We willinform you of any changes to the inspection plan, if you have any questions, please contact W. D. Johnson at (817).860-8148.

Sinceret Thomas P. Gwynn Direc r Division.of Reacto Pr ' ct I

Docket No.: 50-285-License Nos.: DPR-40 j

9711210118 971114 PDR ADOCK 05000285 lllhiltkikh.

~.

G PDR

W ll Omaha Public Power District -

22 i

I'

Enclosure:

--Inspection Plan-cc w/ enclosure:

' James W. Tills, Manager -

Nuclear Licensing _-

Omaha Public Power District, Fort Calhoun Station ' FC 2 4 Adm.

P.O.' Box 399 -

- Hwy. 75 - North of Fort Calhoun Fort Calhoun, Nebraska. 68023-0399-James W. Chase, Matager-

Fort Calhoun Station -

- P.O. Box 399 Fort Calhoun, Nebraska 68023-Perry D. Robinson, Esq.

Winston & Strawn

-1400 L. Street, N.W.

Washington, D.C. 20005-3502 Chairman

-Washington County Board of Supervisors Blair, Nebraska 68008 Cheryl Rogers, LLRW Program Manager Environmental Protection Section Nebraska Department of Health 301 Centennial Ma:1, South-

' P.O. Box 95007 Lineoln, Nebraska 68509 5007 David P. Schor, MD, MPH, FAAP-Low-Level Radioactive Waste Program-HHS Regulation and Licensure P.O. Box 95007i Lincoln, Nebraska 68509-5007 4

.. ~

E

.e

,g-NOV{ l 41997 f

f Omaha Public Power District

3 w

. bec to DCD (IE01) bec distrib. by RIV:

' Regional Administrator ~

DRS-PSB DRP Director MIS System

Branch Chief (DRP/B)

RIV File Project Engineer _(DRP/B)

Branch Chief (DRP/TSS)

Rep,ident Ir.spector

.- A l

l

]

DOCUMENT NAME:. R:\\_FCS\\FCSP9704.LTR To receive copy of document, indicate in box: "C" = Copy without enclosures "E" = Copy with erhures "N" = No copy RIV:DRP/B C:G. '

l,

D:DRS

//,

D:DRP

//

DNGraves;df[p WDJons. onf ATHowell / '

TPGwynn f)/

10M /97 10/Vi /97 1$/f3/97 5/

1$//7/97 7

OFFICIAL RECORD col3Y 3

..I 4

Omaha Public Power District '

bec to DCD (IE01)-

bec distrib. by RIV:

Regional Administrator DRS-PSB DRP Director MIS System Branch Chief (DRP/B)

RIV File Project E'10 neer (DRP/B)

Branch Chief (DRP/TSS) i Resident inspector DOCUMENT NAME: R:\\_FCS\\FCSP9704 LTR To receive copy of document, Indicate in box: "C" = Copy without enclosures "E" = Copy wth enclosures "N" = No copy RIV:DRP/B C:DRP/B D:DRS l,A D:DRP

/,/

l DNGraves;df[p WDJohnson $', ATHowell '

TPGwynn (/7 10/4 /97 10/d /97 1p/

/97 1 //7/97 OFFICIAL RECORD CdPY

FORT CALHOUN STATION INSPECTION PLAN IP -!nspection Procedure Tl - Temporary Instruction Core Inspection - Minimum NRC Inspection Program (mandatory all plants)

INSPECTION TITLE /

NUMBER OF DATES TYPE OF INSPECTION /CCMMENTS PROGRAM AREA INSPECTORS IP 71715 Sustained Control Room 1

To Be Regional initiative to review conduct of control Observation Determined room operations IP 81700 Security Program 1

3/2-6/98 Core inspection IP 73753 Inservice !nspection 1

3/23-28/98 Core inspection l

IP 62706 Maintenance Rule Audit 7

4/13-17/98 NRR Programmatic Requirement L