Monthly Operating Repts for Dec 1998 for Bvps,Units 1 & 2. with
ML20199C997
Person / Time
Site: Beaver Valley
Issue date: 12/31/1998
From: David Jones, Ostrowski K
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-97-02, GL-97-2, L-99-003, L-99-3, NUDOCS 9901190254
Download: ML20199C997 (5)


Text

.

l

'A@

Telephone (412) 393-6000 Nuclear Group L 99-003 P.O. Box 4 Sh.ppingport. PA 15077-0004 January 7,1999 Beaver Valley Power Station Unit 1 - Docket No. 50-334, License No. DPR-66 Unit 2 - Docket No. 50-412, License No. NPF-73 Monthly Operating Report U. S. Nuclear Regulatory Commission Document Control Desk Washington,DC 20555 Gentlemen:

In accordance with NRC Generic Letter 97-02, " Revised Contents of the Monthly Operating Report", and Unit I and 2 Technical Specification 6.9.1.6, the " Monthly Operating Report" is submitted for Unit I and Unit 2 for the month of December,1998.

Respectfully, hh.

1 K. L. Ostrowski Division Vice President, Nuclear Operations Group and Plant Manager DTJ/slp i

Enclosures g<

I cc:

NRC Regional Office King ofPrussia, PA k

The Nuclear Professionals w

~

9901190254 981231 PDR ADOCK 05000334-R PDR_

O 4

UNIT SHUTDOWNS DOCKET NO. 50-334 UNIT NAME BVPS Unit #1 DATE January 5,1999 COMPLETED BY David T. Jones TELEPHONE (412) 393-4962 REPORTING PERIOD:

December 1998 No.

Date Type Duration i Reason Method of Cause / Corrective Actions F: Forced (Hours)

(1)

Shutting s: scheduled Down (2)

Comments l

i l

NO SHUTDOWNS (1) Reason (2) Method A Equipment Feuure (Eglein) 1 - Manuel B Maintenance or Test 2-Manusi Trip / Scram C - Refuelin0 3 - Automatic Trip / Scram D Reguistory Restriction 4 - Continuation E - Operator Training / Ucense Examination 5 Other(Explain)

F - Administrothe G - Operational Error (Explain)

H - Other (Explain)

SUMMARY

The Unit operated at a nominal value of 100% output for the entire month of December 1998.

I l

l l

i~

OPERATING DATA REPORT DOCKET NO.:

50-334 UNIT NAME:

BVPS UNIT #1 REPORT DATE:

01/05/99 1

COMPLETED BY: DAVID T. JONES TELEPHONE:

(412) 393-4962 I

r 1a. REPORTING PERIOD:

DECEMEER 1998

  • Notes 1.

DESIGN ELECTRICAL RATING (Net MWe):

835 2.

MAX. DEPENDABLE CAPACITY (Net MWe):

810 THIS MONTH YEAR TO DATE CUMULATIVE 3a. HOURS IN REPORTING PERIOD:

744.0 8760.0 198720.0 3.

NO. OF HRS. REACTOR WAS CRITICAL:

744.0 3617.8 129280.0 l

4.

SERVICE HOURS GENERATCR ON LINE:

744.0 3558.2 127031.7 5.

UNIT RESERVE SHUTDOWN HOURS:

0.0 0.0 0.0 6.

NET ELECTRICAL ENERGY GEN. (MWH):

617400.0 2827309.0 93685892.0 7.

GROSS ELECT. ENERGY GEN. (MWH):

653240.0 3017579.0 100166775.0 8.

GROSS THERMAL ENERGY GEN. (MWH) :

1968795.0 9199973.0 309469777.5 I

9.

UNIT AVAILABILITY FACTOR (%) :

100.0 40.6 65.5 1

10. UNIT CAPACITY FACTOR (MDC) (%):

102.4 39.8 60.3

11. UNIT FORCED OUTAGE RATE (%):

0.0 58.9 18.4 i

i

UNIT SHUTDOWNS DOCKET NO. 50-412 UNIT NAME BVPS Unr. 82 DATE January 5,1999 COMPLETED BY David T. Jones TELEPHONE (412) 393-4962" REPORTING PERIOD:

December 1998 No.

Date Type Duration Reason Method of Cause / Corrective Actions

p. Forcod (Hours)

(1)

Shutting s: scheduisd Down (2)

Comments No SHUTDOWNS (1) Reason (2) Method j

A. Equipment FeRure (Emplain) 1 - Manuel B MaintenanceorTest 2-Manuel Trip / scram C Refustnf

3. Automatic Trip / scram D-Regulatory Restricson
4. Continuation E. operaler Trainin0 / uoenee Examination 5 other(Emplain)

F - Administrathe o-operellonel Error (Emplain)

H other(Emplain)

SUMMARY

The Unit began the report period operating at a nominal value of 100% output. On 12/04/98 at 1416 hours0.0164 days <br />0.393 hours <br />0.00234 weeks <br />5.38788e-4 months <br />, a planned reduction in output of approximately 1% was portormed to support individual calit, rations of each of the three Reactor Coolant System Delta-T loops. This was done as a conservative measure to gain extra margin in order to prevent a possible turbine runback should one loop spike while a second loop was out-of-service for calibration. Following completion of all three calibrations, power was restored to a nominal value of 100% output at 0300 hours0.00347 days <br />0.0833 hours <br />4.960317e-4 weeks <br />1.1415e-4 months <br /> on 12/09/98. The Unit operated at a nominal value of 100% output for the remainder of the report period.

g, j,

E

.... -.. -.. -. - - ~ -.

....~.

J OPERATING DATA REPORT DOCKET NO.:

50-412 4

3 UNIT NAME:

BVPS UNIT #2 REPORT DATE:

01/05/99 COMPLETED BY: DAVID T. JONES

?

TELEPHONE:

(412) 393-4962

\\

ic, REPORTING PERIOD:

DECEMBER 1998

  • Notes 1.

DESIGN ELECTRICAL RATING (Net MWe):

836 2.

MAX. DEPENDABLE CAPACITY (Net MWe):

820

,I THIS MONTH YEAR TO DATE CUMULATIVE 3a. HOURS IN REPORTING PERIOD:

744.0 C760.0 97503.0 3.

NO. OF HRS. REACTOR WAS CRITICAL:

744.0 2251.8 77596.3 4.

SERVICE HOURS GENERATOR ON LINE:

744.0 2179.7 77029.1 5.

UNIT RESERVE SHUTDOWN HOURS:

0.0 0.0 0.0 6.

NET ELECTRICAL ENERGY GEN. (MWH):

622744.0 1753284.0 59400582.0 7.

GROSS ELECT, ENERGY GiilN. (MWH):

654896.0 1855280.0 62856952.0 8.

GROSS THERMAL ENERGY GEN. (MWH):

1960771.0 5618282.0 192504755.0 9.

UNIT AVAILABILITY FACTOR (%) :

100.0 24.9 79.0

10. UNIT CAPACITY FACTOR (MDC) (%):

102.1 24.4 74.0

11. UNIT FORCED OUTAGE RATE (%):

0.0 75.1 12.3 l

l I

9