ML20198Q243
| ML20198Q243 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 11/03/1997 |
| From: | NORTHEAST NUCLEAR ENERGY CO. |
| To: | |
| References | |
| NUC-EPOP-4428E, NUDOCS 9711120151 | |
| Download: ML20198Q243 (3) | |
Text
-
h>&
- NDS Document Transmittal #16816 11/3/97 To:
Nuclear Regulatory Commission Addressee Unique 8140 ROUTINE distnburon Document Contr01 Desk Washington, D.C. 20555 The following documents have been revised. You are currently on distribution for
'.hese documents. Verify that all documents are included in this distribution set.
DOCUMENT REV COPIES NUC EPOP 4428E, CH1 2
1 q/'
/
.?1
/YD'Ol
?.'? M i 9711120151 971103 PDR ADOCK 05000245 P
PDR Retum this form to NOS, MP475,3rd Floor, C/O Rd Lundin (x2446) as soon as recewed hfhfh ll,flhllfl Signature Date:
1
1 Procedure and Form Change Request
+
4 J
(5ht ct 1 Of I)
See DCJ Section 1.5for instructlons 1Section 1: Change initiation informatiolv
'c.
Document No.:- NUC EPOP 4428E Resision No.
2 Change No.
1-
Title:
Post Accident Release Rates Date 10-16 1997. !m __,,,,, _, ;_
One Time Chanac? YES NO[
l initiated H): B. Tarallo T)pe of Change:
. latent [.- Non Intent ]
l b '""" '
0"[!Oa br' a
Reason:
l E3pirstjodpadirlem:
i Changed wind speed data on Attachment i from WS 142 to WS 1H to correct an error in stack height.
L-I"""""dD*".b===__]
1Section__2: Instructions for Entering Chang'e$
- Electronic Change Replace page 11 with the attached.
iSection. 3: Non Intent Change Interim Approval: --
Section 3a: Apprmed by SOkC or PORC Member or First 1.ine Supenisor Signature:
Date:
l Section 3h: Apprmed by Shift Manager or SRO Licensed on Unit l-Signature:
Date:
Section 4: Reviews.
MlA Date:
QA Resiewer Signature ofrequ,,,a>
/A,/P '7 Independent Reviewer (s) Signature (s) 4h16 Date:
I U1 No Commenn
""0""'"' IUS"""
@ ^IX') not reqwred
~
~
U2 No Commenu U3 No Comments Datc:
NOh
[
c Safety EsatuatiIn Required?
YES t/,uw,,wnina = a=*.=d I-co Ensironmental Resica Required?
(ES] NO]
,,hf#
~
Section 5: Review and Approval
.. pORC or SORC YES [/i NO R 4y2 Review Required?
LI gojpg Responsible Department licad or x
w Date:
Responsible Individual Signature:
WudcIt$% D5Nl"""
Datc:
n-.
o Date:
[
iSection 6: PORClo ORC Approval (l[ required)b m - ( j, J
,l~ u i.
s h - CP O r7 I
PORCo SORC Meeting No:
/ /.
- rd r Chairperso ignature:
Approval Date:
/O'Mi"N Effective Date:
i\\-9 -%
0C1 Att:6 - Rev. 6 (09 03-97)
I-l Station Admin Procedures Group OSCAR Report
~
. Attachment 1:
~*
Release Rates e
(Sheet 1 of 13) _
CY Main Stack (Mixed Release)
Daterrime Period of Release Preparer Reviewer Flow Rate Stack Flow Rate Meter Default Flow Rate = 70.000 CFM METER READING
'For Stack Flow Status, refer to Attachment 2 Release Mode Classification 2.6E-4
=
STACK TO WIND SPEED RATIO:
X.
. FLOW RATE CONVERSION WS196 RATIO CFM-FACTOR m/sec O
{-
Ratio:
1.0 1.1 1.2 1.3 1.4 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0 pCircle I
Elevated Fraction: 0.00 0.16 0.32 0.47 0.63 0.79 0.82 0.85 0.88 0.91 0.94 0.97.1.00 Ground Fraction: 1.00 0.84 0.68 0.53 0.37 0.21 0.18 0.15 0.12 0.09 0.06 0.03. 0.00 i
l
. Complete Only One (1) Main Stack Monitor (RMS.14A) 4.7E-4 Ci/sec -
=
MONITOR CALIBRATION FLOW RATE CONVERSION NOBLE GAS CPM FACTOR" CFM FACTOR RELEASE RATE 1'
Use DEFAULT = 1.45E-8 Ci/cc/ CPM (2)
Wide Range Stack Gas Monitor (RMS+14B) x -
-1.0 E-6 Ci/sec MONITOR' CONVERSION ~
NOBLE GAS-Ci/see
- FACTOR RELEASE RATE O
-Level Of USe NUC EPOP 4428E sTOe mlNK
-ACT REVIEW Rev. 2
. Generai 11 of 32
._