ML20198H545
| ML20198H545 | |
| Person / Time | |
|---|---|
| Site: | Indian Point |
| Issue date: | 05/16/1986 |
| From: | Harpster T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Liebler G CONSOLIDATED EDISON CO. OF NEW YORK, INC. |
| References | |
| NUDOCS 8605300485 | |
| Download: ML20198H545 (2) | |
Text
-
4 e
gg 1G N y
l Docket No. 50-247 Consolidated Edison Company of New York, Inc.
Indian Point Station, Unit No. 2 ATTN: Mr. George Liebler Emergency Preparedness Group i
Broadway and Bleakley Avenues Buchanan, New York 10511 i
Dear Mr. Liebler:
r
/
Thank you for working and cooperating with the staff of this section while we prepared for the June full-participation exercise.
The NRC observation team roster is attached.
The required time for site access training and badging has been scheduled for the morning of
- Tuesday, June 3,
prior to Consolidated Edison's controller-observer briefing. Our exit meeting is scheduled to begin at 1:30 p.m., Thursday, June 5 in the location you suggested - the Simulator Building conference room.
Please call Charles Amato (215-337-5394) if you have any questions, problems or comments.
Sincerely, Orfs%2 ci, g v..,
^
Terry L. Harpster, Chief Emergency Preparedness Section i
Division of Radiation Safety and Safeguards
Enclosure:
As stated bec:
D. J. Vito j
8605300485 860516 i-PDR ADOCK 05000247' e
F PDR
~.
l
)
RI:DRSS Amato//y/P H ps.er l
l 5/rf/86 5/<(486 i
1
}
)
0FFICIAL RECORD COPY
Enclosure NRC 05servor Team Roster IP-2 Full-Participation Exercise Location Team Member Control Room Gary Weale, PNL TSC Larry Rossback, SRI, IP-2 OSC/ Accountability Darrell Fisher, PNL E0F Ed Podolak, NRC, HQ l
E0F Charles Amato, NRC, RI On-site Team John Davis, PNL Off-site Team Joseph Stephen, PNL 2
JNC David Vito, NRC, RI NRC RAC Observer James Hawxhurst, NRC, RI Notes: PNL Battelle Pacific Northwest Laboratory 1 - Team Leader - general observer 2 - Senior Inspector - general observer 1
0FFICIAL RECORD COPY
=--+ -
=
--+>ww 9
=m,,-
,