Text
.
-
e
OCT 241986
In Reply Refer To:
Docket: 50-285/86-24
t
Omaha Public Power District
ATTN:
R. L. Andrews, Division Manager-
Nuclear Production
1623 Harney Street
Omaha, Nebraska 68102
.
Gentlemen:
This refers to the inspection conducted by Messrs. E. A. Plettner and P. H.
Harrell of this office during the period August 25-29, 1986, of activities
authorized by NRC Operating License DPR-40 for the Fort Calhoun Station, and to
the discussion of our findings with Mr. W. G. Gates, and other members of your
staff at the conclusion of the inspection.
-
Areas examined during the inspection included the licensee's licensed operator
training and requalification program. Within these areas, the inspection
consisted of selective examination of procedures and representative records,
interviews with personnel, and observations by the inspectors. The inspection
findings are documented in the enclosed inspection report.
During this inspection, it was found that certain of your activities were
potential violations of NRC requirements.
However, since these potential
violations are related to training, they are not cited herein as violations
but are considered to be unresolved items in accordance with the Commission
Policy Statement on Training and Qualification of Nuclear Power Plant Personnel
(50 FR 11147). No response is required; however, your attention to the
unresolved items which have the potential of becoming violations in the future
is warranted.
Unresolved items are identified in paragraph 3 of the enclosed inspection
report.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
go{
8610310134 861024
ADOCK 05000285
Original Signed By
J. E. Gagliardo
,
G
'
'
J. E. Gagliardo, Chief
i
I
Reactor Projects Branch
si
,
c
sure:
(see next p
RPB/h
(R R;A
RPB
!
~ ,yV I
RIV:SR
'.UVEAPlettner
PHHarrell
DR Hunter
J Jaydon JEGagliar'do
g) /f /86
\\b/W/86
\\b/ \\V/86
[0/p/86 1o/13/86-
_ _ . _ _ _ _ .
_
_ . _ . . _
._.
__
,
.
,
i
Omaha Public Power District
-2-
Enclosure:
Appendix - NRC Inspection Report
50-285/86-24
cc w/ enclosure: W. G. Gates, Manager
Fort Calhoun Station
P. O. Box 399
Fort Calhoun, Nebraska 68023
-
Harry H. Voigt, Esq.
LeBoeuf, Lamb, Leiby & MacRae
1
1333 New Hampshire Avenue, NW
Washington, DC 20036
Kansas Radiation Control Program Director
Nebraska Radiation Control Program Director
bectoDMB(IE01)
bec distrib. by RIV:
- RPB
- Resident Inspector
R. D. Martin, RA
- R&SPB
- SectionChief(RPB/B)
- RSB
- RIV File
DRSP
- D. Weiss, LFMB (AR-2015)
- MIS SYSTEM
- RSTS Operator
- DHFT
- E. Plettner, Cooper
- w/766
--
-
.
..
-
..
.. -