ML20196H980

From kanterella
Jump to navigation Jump to search
Submits Two RAI Re ITS Section 4.0 That Were Never Sent. Reply to RAI Via e-mail
ML20196H980
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 06/10/1999
From: Padovan L
NRC
To: Ajluni M, Sparkman W
SOUTHERN NUCLEAR OPERATING CO.
Shared Package
ML20196H977 List:
References
NUDOCS 9907070064
Download: ML20196H980 (1)


Text

. E Mark ~Pldov;.n - OopsTEinut:ilTSlSectioK40 RAI

~

1

~

Pig 61]

l I

From:

L Mark Padovan

{

To:

Ajtuni, Mark, Sparkman, Wesley j

Date:

Thu, Jun 10,199910:14 AM J

Subject:

Oops - Last Minute ITS Section 4.0 RAI l

Mark & Wes, j

Good moming. We goofed. We found two RAls (shown below) that we never sent to you. Can you reply to these via E-mail to me ASAP 7 Carl started writing up our SE and needs your reply. I will prepare a formal RAI and get it to you soon. Thanks. Have a good day.

Mark 4.0-1 ITS 4.3.1 Criticality JD6 STS 4.3.1.1.f is revised by the deletion of "the NRC approved [ specific document containing the analytical methods, title, date, or specific configuration or figure].", and the addition of insert D.

Comment: The revised 4.3.1.1.f should retain the wording "NRC approved"in front of Figures 4.3-2 through 4.3-5.

SNC Response:

4.0-2 ITS 4.3.1 Criticality l

JD7 STS 4.3.1.1 is revised by the addition of Insert F.

]

Comment: 4.3.1.1 is revised by the addition of Insert E as 4.3.1.1.g. Insert F is added to STS 4.3.1.2 as 4.3.1.2.a and 4.3.1.2.b.

SNC Retponse:

@' % o';&%

PDR f

u

..