ML20196H980
| ML20196H980 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 06/10/1999 |
| From: | Padovan L NRC |
| To: | Ajluni M, Sparkman W SOUTHERN NUCLEAR OPERATING CO. |
| Shared Package | |
| ML20196H977 | List: |
| References | |
| NUDOCS 9907070064 | |
| Download: ML20196H980 (1) | |
Text
. E Mark ~Pldov;.n - OopsTEinut:ilTSlSectioK40 RAI
~
1
~
Pig 61]
l I
From:
L Mark Padovan
{
To:
Ajtuni, Mark, Sparkman, Wesley j
Date:
Thu, Jun 10,199910:14 AM J
Subject:
Oops - Last Minute ITS Section 4.0 RAI l
Mark & Wes, j
Good moming. We goofed. We found two RAls (shown below) that we never sent to you. Can you reply to these via E-mail to me ASAP 7 Carl started writing up our SE and needs your reply. I will prepare a formal RAI and get it to you soon. Thanks. Have a good day.
Mark 4.0-1 ITS 4.3.1 Criticality JD6 STS 4.3.1.1.f is revised by the deletion of "the NRC approved [ specific document containing the analytical methods, title, date, or specific configuration or figure].", and the addition of insert D.
Comment: The revised 4.3.1.1.f should retain the wording "NRC approved"in front of Figures 4.3-2 through 4.3-5.
SNC Response:
4.0-2 ITS 4.3.1 Criticality l
JD7 STS 4.3.1.1 is revised by the addition of Insert F.
]
Comment: 4.3.1.1 is revised by the addition of Insert E as 4.3.1.1.g. Insert F is added to STS 4.3.1.2 as 4.3.1.2.a and 4.3.1.2.b.
SNC Retponse:
@' % o';&%
PDR f
u
..