ML20196F740

From kanterella
Jump to navigation Jump to search
Forwards Rev 6 to EOP-07, Inadequate Core Cooling, Rev 7 to EOP-08, LOCA Cooldown & Rev 12 to EOP-12, Station Blackout
ML20196F740
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 11/23/1998
From:
FLORIDA POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20196F742 List:
References
NUDOCS 9812070116
Download: ML20196F740 (1)


Text

.__.

Document Transmittal #: 107919 Date: 11/23/98 n

Tc:

NRC (DC DESK)

MAC: N/A Holder #: 1242 Destination:

==

Description:==

Copy Totals Document:

Revision:

Comment:

INFO CNTL MSTR EOP0007 06 1

0 0

. EOP0008 07 1

0 0

EOP0012 03 1

0 0

l Instructions to the Addressee: Please verify the document (s) received agrees with the above information.

Engineering managers are required by NEP-121 to determine if new, revised, or temporary changes to

/

procedures affect job functions of their personnel. Managers will communicate change information appropriately and provide documentation of any training conducted to the Engineering Training Coordinator.

/

Operations department must attach old document (s) or portions of document (s) superseded by the above

/'hh to this transmittal.

The signature indicates acknowledgment of receipt of the above document (s) and that documents have been l

i updated. Retum signed and dated transmittal to Document Control within 15 working days of transmittal date to mail code:

NA1C Florida Power Corporation Document Control, NA1C Crystal River Energy complex 15760 W. Power Line St.

Crystal River, FL 344284708

.- m 2 s

Jt Signature of Addressee:

Date:

9812070116 981123 I

PDR ADOCK05000302{

j F

Pm l

-