ML20195C174

From kanterella
Jump to navigation Jump to search
Final Response to FOIA Request for Records Re Insp Rept 50-445/84-16.Forwards App a Documents.Documents Also Available in PDR
ML20195C174
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 05/23/1986
From: Grimsley D
NRC OFFICE OF ADMINISTRATION (ADM)
To: Garde B
GOVERNMENT ACCOUNTABILITY PROJECT
Shared Package
ML20195C180 List:
References
FOIA-86-193, FOIA-86-A-55 NUDOCS 8605300116
Download: ML20195C174 (2)


See also: IR 05000445/1984016

Text

-

Pb97Dlb

8

^%

UNITED STATES

!

%

NUCLEAR REGULATORY COMMISSION

h

$

WASHINGTON, D. C. 20555

\\...../

MAY 2 31986

'

Ms. Billie Pirner Garde, Director

Environmental Whistleblower Clinic

Government Accountability Project

1555 Connecticut Avenue, NW, Suite 202

IN RESPONSE REFER

Washington, DC 20036

TO F01A-86-193 and

(F01A-86-A-55)

Dear Ms. Garde:

This is in further response to your letter dated March 18, 1986, in which you

-

requested, pursuant to the Freedom of Information Act (FOIA), copies of all

records related to Inspection Report 50-445/84-16 regarding the Comanche Peak

plant.

The documents listed on the enclosed Appendix A are being placed in the NRC

Public Document Room (PDR) located at 1717 H Street, NW, Washington, DC. You

may obtain access by presenting a copy of this letter to the PDR staff or by

requesting PDR folder F0!A-86-193 in your name.

This completes action on your request. Also, in light of our responses of

_

"~

April 30, 1986, and this date, no further action will be taken on your letter

of April 8,1986, appealing our lack of response to this FOIA request.

Sincerely,

Donnie H. Grimsley, Director

Division of Rules and Records

Office of Administration

Enclosure: As stated

8605300116 860523

PDR

FOIA

GARDE 86-A-55

PDR

. - -

- -

-

't

1

. .

.

,

./

-

1

'

Appendix A

F0IA 86-193 -

>

,

x

.

-

r

t.

>

2/1/85

TUCCo Engineering Divisism Instruction CP-EI-4.0-67,

,,

Rev. 1, subject: Cable Tray Hanger As-Designed and

As-Built Drawing Development.

(9 pgs)

50-445/84-16

1

.

2/1/85

TUCCo Engineering Division Instruction CP-EI-4.0-69

Rev. O, subject: Cable Tray Hanger.'As-Built Weld

'

Mapping Unit No. 1.

(5 pgs)

'

50-445/84-16

Y

5/6/85

TUCCo Engineering Division Instruccion CP-EI-4.0-71

Rev. 1, subject:

Cable Tray Ha'ger As-Built " Bolt

n

Hole Verification" Unit No. 2.* (21 pgs)

-

50-445/84-16

'i

'

,

i

,

.Y

?

r

.

!

.

"

..

l

!

,o

e

f

R

o

f

9

i

.

>

}

'

r

i

,

.

.

r

>

i

.

.

'

.

,

Y

.

m.

t

y

]

- '

..

.

,

'

.o

GOVERNMENT ACCOUNTABILITY PROJECT

'

1555 Connecticut Avenue, N.W., Suite 202

Washington, D.C. 20036

(202)232-8550

March 18, 1986

FREEDOM OF INFORMATION ACT REQUEST

IcL W J vr iNFONMarf0h

Director

ACT REQUEST

Office of Administration

~ E b ' N.3

Nuclear Regulatory Commission

3 a.t. 8d 3 - G $

Washington,

D.C.

20555

To Whom It May Concern:

Pursuant to the Freedom of Information Act (FOIA), 5 U.S.C.

552, the Government Accountability Project -(GAP) requests copies

of any and all agency records and information, including but not

limited to notes, latters, memoranda, drafts, minutes, diaries,

logs, calendars, tapes, transcripts, summaries, interview

reports, procedures, instructions, engineering analyses,

drawings, files, graphs, charts, maps, photographs, agreements,

handwritten notes, studies, data sheets, notebooks, books, tele-

phone messages, computations, voice recordings, computer runoffs,

any other data compilations, interim and/or final reports, status

reports, and any and all other records relevant to and/or

generated in connection with Inspection Report 84-16.

This request includes all agency records as defined in 10 C.F.R. 9.3a(b) and the NRC Manual, Appendix 0211, Parts 1.A.2 and

A.3 (approved October 8,

1980) whether they currently exist in

the NRC official, " working", investigative or other files, or at

any other location, including private residences.

If any records as defined in 10 C.F.R. 9.3a(b) and the NRC

Manual, supra, and covered by this request have been destroyed

and/or removed after this request, please provide all surrounding

records, including but not limited to a list of all records which

have been or are destroyed and/or removed, a description of the

action (s) taken relevant to, generated in connection with, and/or

issued in order to implement the action (s).

o/#

N g\\ 'ff

x

..

-

-

. e r"' * *

-

- _ _ _

-1

-

.

.t

-

-2-

,

i

GAP requests that fees be waived, because " finding the

information can be considered as primarily benefitting the

general public," 5 U.S.C. 552 (a) (4) (a) .

GAP is a non-profit,

non-partisan public interest organization concerned with honest

'

and open government.

Through public outreach, the Project

'

promotes whistleblowers as agents of government accountability.

Through its Environmental Whistleblower Clinic, GAP offers assis-

tance to local public interest and citizens groups seeking to

ensure the health and safety of their communities.

The Environ-

mental Whistleblower Clinic is currently assisting several

citizens groups, local governments and intervenors in Texas

concerning the construction of the Comanche Peak nuclear power

plant.

We are requesting the above information as part of an

ongoing monitoring project on the adequacy of Region IV and the

NRC's efforts to protect public safety and health at nuclear

power plants.

For any documents or. portions that you deny due to a

specific FOIA exemption, please provide an index itemizing and

describing the documents or portions of documents withheld.

The

index should provide a detailed justification of your grounds for

claiming each exemption, explaining why each. exemption is

relevant to the document or portion of the document withheld.

This index is required under Vaughn v.1Rosen (I), 484;F.2d 820

(D.C. Cir. 1973), cert. denied, 415 U.S. 977 (1974).

We look forward to your response to this request within ten

working days.

Sincerely,

h

b%m bMN

i

Billie Pirner Garde

,

Director, Environnt' ntal