Text
-
Pb97Dlb
8
^%
UNITED STATES
!
%
NUCLEAR REGULATORY COMMISSION
h
$
WASHINGTON, D. C. 20555
\\...../
MAY 2 31986
'
Ms. Billie Pirner Garde, Director
Environmental Whistleblower Clinic
Government Accountability Project
1555 Connecticut Avenue, NW, Suite 202
IN RESPONSE REFER
Washington, DC 20036
TO F01A-86-193 and
Dear Ms. Garde:
This is in further response to your letter dated March 18, 1986, in which you
-
requested, pursuant to the Freedom of Information Act (FOIA), copies of all
records related to Inspection Report 50-445/84-16 regarding the Comanche Peak
plant.
The documents listed on the enclosed Appendix A are being placed in the NRC
Public Document Room (PDR) located at 1717 H Street, NW, Washington, DC. You
may obtain access by presenting a copy of this letter to the PDR staff or by
requesting PDR folder F0!A-86-193 in your name.
This completes action on your request. Also, in light of our responses of
_
"~
April 30, 1986, and this date, no further action will be taken on your letter
of April 8,1986, appealing our lack of response to this FOIA request.
Sincerely,
Donnie H. Grimsley, Director
Division of Rules and Records
Office of Administration
Enclosure: As stated
8605300116 860523
GARDE 86-A-55
. - -
- -
-
't
1
. .
.
,
./
-
1
'
Appendix A
F0IA 86-193 -
>
,
x
.
-
r
t.
>
2/1/85
TUCCo Engineering Divisism Instruction CP-EI-4.0-67,
,,
Rev. 1, subject: Cable Tray Hanger As-Designed and
As-Built Drawing Development.
(9 pgs)
50-445/84-16
1
.
2/1/85
TUCCo Engineering Division Instruction CP-EI-4.0-69
Rev. O, subject: Cable Tray Hanger.'As-Built Weld
'
Mapping Unit No. 1.
(5 pgs)
'
50-445/84-16
Y
5/6/85
TUCCo Engineering Division Instruccion CP-EI-4.0-71
Rev. 1, subject:
Cable Tray Ha'ger As-Built " Bolt
n
Hole Verification" Unit No. 2.* (21 pgs)
-
50-445/84-16
'i
'
,
i
,
.Y
?
r
.
!
.
"
..
l
!
,o
e
f
R
o
f
9
i
.
>
}
'
r
i
,
.
.
r
>
i
.
.
'
.
,
Y
.
m.
t
y
]
- '
..
.
,
'
.o
GOVERNMENT ACCOUNTABILITY PROJECT
'
1555 Connecticut Avenue, N.W., Suite 202
Washington, D.C. 20036
(202)232-8550
March 18, 1986
FREEDOM OF INFORMATION ACT REQUEST
IcL W J vr iNFONMarf0h
Director
ACT REQUEST
Office of Administration
~ E b ' N.3
Nuclear Regulatory Commission
3 a.t. 8d 3 - G $
D.C.
20555
To Whom It May Concern:
Pursuant to the Freedom of Information Act (FOIA), 5 U.S.C.
552, the Government Accountability Project -(GAP) requests copies
of any and all agency records and information, including but not
limited to notes, latters, memoranda, drafts, minutes, diaries,
logs, calendars, tapes, transcripts, summaries, interview
reports, procedures, instructions, engineering analyses,
drawings, files, graphs, charts, maps, photographs, agreements,
handwritten notes, studies, data sheets, notebooks, books, tele-
phone messages, computations, voice recordings, computer runoffs,
any other data compilations, interim and/or final reports, status
reports, and any and all other records relevant to and/or
generated in connection with Inspection Report 84-16.
This request includes all agency records as defined in 10 C.F.R. 9.3a(b) and the NRC Manual, Appendix 0211, Parts 1.A.2 and
A.3 (approved October 8,
1980) whether they currently exist in
the NRC official, " working", investigative or other files, or at
any other location, including private residences.
If any records as defined in 10 C.F.R. 9.3a(b) and the NRC
Manual, supra, and covered by this request have been destroyed
and/or removed after this request, please provide all surrounding
records, including but not limited to a list of all records which
have been or are destroyed and/or removed, a description of the
action (s) taken relevant to, generated in connection with, and/or
issued in order to implement the action (s).
o/#
N g\\ 'ff
x
..
-
-
. e r"' * *
-
- _ _ _
-1
-
.
.t
-
-2-
,
i
GAP requests that fees be waived, because " finding the
information can be considered as primarily benefitting the
general public," 5 U.S.C. 552 (a) (4) (a) .
GAP is a non-profit,
non-partisan public interest organization concerned with honest
'
and open government.
Through public outreach, the Project
'
promotes whistleblowers as agents of government accountability.
Through its Environmental Whistleblower Clinic, GAP offers assis-
tance to local public interest and citizens groups seeking to
ensure the health and safety of their communities.
The Environ-
mental Whistleblower Clinic is currently assisting several
citizens groups, local governments and intervenors in Texas
concerning the construction of the Comanche Peak nuclear power
plant.
We are requesting the above information as part of an
ongoing monitoring project on the adequacy of Region IV and the
NRC's efforts to protect public safety and health at nuclear
power plants.
For any documents or. portions that you deny due to a
specific FOIA exemption, please provide an index itemizing and
describing the documents or portions of documents withheld.
The
index should provide a detailed justification of your grounds for
claiming each exemption, explaining why each. exemption is
relevant to the document or portion of the document withheld.
This index is required under Vaughn v.1Rosen (I), 484;F.2d 820
(D.C. Cir. 1973), cert. denied, 415 U.S. 977 (1974).
We look forward to your response to this request within ten
working days.
Sincerely,
h
b%m bMN
i
Billie Pirner Garde
,
Director, Environnt' ntal
e
Whistleblower Clinic
'
,
s.
<
/
i
r
.
.-
- , . - - - - , . , -
-
. - , .
--
,4.,
, _ _ . , ,
. _ . .
. . , - _ .
, ,
,-g,.-,
, , , ,
.
,n,