ML20155C120

From kanterella
Jump to navigation Jump to search
Forwards Rev B to QA Program Manual (QAPM) for NRC Approval. Allowance for Phased Implementation Time of 6 Months from Date of Approval of QAPM Requested,By Nrc.Details of Revs, Discussions of Changes & Markups of Current QA Program,Encl
ML20155C120
Person / Time
Site: Grand Gulf, Arkansas Nuclear, River Bend, Waterford  Entergy icon.png
Issue date: 10/26/1998
From: Kansler M
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20155C125 List:
References
CNRO-98-00025, CNRO-98-25, NUDOCS 9811020080
Download: ML20155C120 (3)


Text

_.. _

. - ~ _.. ~,.. ~.. -

n* En

= = w """'-

Jackson, MS 39286-1995 Tel 601368 5760 1

Michael R. Kansler wce PresKlent Operatons Support Octaber 26,1998 Document Control Desk United States Nuclear Regulatory Commission Mail Stop P1-17 Washington, DC 20555-0001 Subject -

Entergy Operations, Inc.

Consolidation of the Four Current Quality Assurance Programs inh One Quality Assurance Program - Revision Arkansas Nuclear One Grand Gulf Nuclear Station Units 1 & 2 Docket No. 50-416 Docket Nos. 50-313 & 50-368 License No. NPF-29 License Nos. DPR-51 & NPF-6 River Bend Station Waterford 3 Steam Electric Station Docket No. 50-458 Docket No. 50-382 License No. NPF-47 License No. NPF-38 Reference CNRO-98/00013, Consolidation of the Four Current Quality Assurance Programs into One Quality Assurance Program, dated April 30,1998 C

CNRO-98/00025 in the referenced letter, in accordance with 10 CFR 50.54(a)(3), Entergy Operations, Inc.

(EOI) requested NRC review and approval of a Quality Assurance Program Manual

- (OAPM) for use by all of EOI. In subsequent meetings the NRC Staff and EOl have identified changes to the originally proposed QAPM and EOl has identified some editorial corrections. This letter submits the revised document. The proposed QAPM continues to fully implement the requirements of 10 CFR 50 Appendix B.

The details of EOl's revisions can be found in the attached. Attachment 1 (Entergy Operations, Inc. Quality Assurance Program Manual) and Attachment 2 (Discussions of Change) are complete replacements for the previously provided attachments.

Attachments 3 through 6 (markups of the current QA programs) are page replacements.

As discussed in the referenced letter, EOl requests allowance for a phased implementation time of 6 months from the date of approval of the QAPM by the NRC.

O 00 k 9811020000 98i PDR ADOCK 05000313 P

pm

Consolidition of ths Four Currtnt Quality Assurance Programs - Revision CNR0-98/00025 Pag'a 2 of 2 Please address any comments or questions regarding this matter to Mr. Bryan Ford at (601) 368-5792.

Sincerely, NR

}

MRK/SJB/BSF/baa attachments: 1.

Entergy Operations, Inc. Quality Assurance Program Manual 2.

Discussions of Change 3.

Arkansas Nuclear One OA Manual Operations Markup 4.

Grand Gulf Nuclear Station OQAM Markup 5.

River Bend Station OADs Markup 6.

Waterford 3 OAPM Markup cc:

Mr. J. L. Blount (w/o)

Mr. J. R. McGaha (w/o)

Ms. J. Dixon-H 'rrity Mr. E.W. Merschoff Mr. J. N. Dono aw (w/o)

Mr. C. J. Paperiello Mr. C. M. Dugger (w/o)

Mr. C. P. Patel Mr. W. A. Eaton (w/o)

Mr. W. D. Reckley Mr. T. R. Farnholtz Mr. G. D. Replogie Mr. R. K. Edington (w/o)

Mr. N. S. Reynolds Mr. R. J. Fretz Mr. L. J. Smith (w/o)

Mr. C. R. Hutchinson (w/o)

Mr. F. W. Titus (w/o)

Mr. K. M. Kennedy Mr. D. L. Wigginton

=

Page1 i

Entergy Operations, Inc.

Quality Assurance Program Manual i QAPM}

..