ML20155B910

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-220/98-14 & 50-410/98-14 on 980816-0926.No Violations Noted.During Insp Period,Continued Safe Operation of Both Units Noted
ML20155B910
Person / Time
Site: Nine Mile Point  Constellation icon.png
Issue date: 10/26/1998
From: Doerflein L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mueller J
NIAGARA MOHAWK POWER CORP.
Shared Package
ML20155B914 List:
References
50-220-98-14, 50-410-98-14, NUDOCS 9810300338
Download: ML20155B910 (3)


See also: IR 05000220/1998014

Text

. .

.

__ . _ _ __ _ _. _.__

_ . _ _ . . ___ _ _ .

.

_ _ _ _ _ .

.

"

,.

' 4'

October 26, 1998

Mr. John H. Mueller

Chief Nuclear Officer

Niagara Mohawk Power Corporation

Nine Mile Point Nuclear Station

Operations Building,2nd Floor

P.O. Box 63

Lycoming, NY 13093

SUBJECT:

NRC INTEGRATED INSPECTION REPORT NOS. 50-220/98-14

AND 50-410/98-14

Dear Mr. Mueller:

-This report transmits the findings of safety inspections conducted by NRC inspectors at the

Nino Mile Point Nuclear Station, Units 1 and 2, from August 16 through September 26,

1998. At the conclusion of the inspection, the findings were discussed with you and

members of your staff.

During this six-week inspection period, we noted continued safe operation of both units by

your staff.

In accordance with 10CFR2.7900f the NRC's " Rules of Practice," a copy of this letter and

its enclosures will be placed in the NRC Public Document Room.

Sincer ely,

Original Signed by:

Lawrence T. Doerflein, Chief

Projects Branch 1

Division of Reactor Projects

Docket Nos. 50-220,50-410

License Nos. DPR-63, NPF-69

Enclosure: NRC Inspection Report Nos. 50-220/98-14 and 50-410/98-14

I

I

S'

j

_

C (, O b ,'. 0

0FFICIAL RECORD COPY

IE:01

9810300338 981026

7

PDR

ADOCK 05000220

0

PDR

g

-

.

-

.

-- ..

. . . _ _ _ _ . - . . _ - _ __ _ .__ _

_

. _ . _ . . _ _ . _ .

_ . _

. _ _ _ - . . . . _ _ . . - _ _ _ _ _ _ _ . . _ . _ _

..

.

' '

John H. Mueller

2

cc w/ enclosure:

G. Wilson, Senior Attorney

M. Wetterhahn, Winston and Strawn

)

J. Rettberg, New York State Electri: and Gas Corporation

{

P. Eddy, Electric Division, Department of Public Service, State of New York

C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law

J. Vinquist, MATS, Inc.

l

F. Valentino, President, New York State Energy Research and Development Authority

J. Spath, Program Director, New York State Energy Research

And Development Authority

(.

l

i

l

1

I

'

l

t

t

,

I

l

l

.

.

.

- , . ,

._

_ . _ _

_

..

.

.

John H. Mueller

3

Distribution w/ encl:

H. Miller, RA/W. Axelson, DRA (1)

Region I Docket Room (with concurrences)

Nuclear Safety Information Center (NSIC)

PUBLIC

NRC R(sident inspector

L. Doerfisin, DRP

W. Cook, DRP

R.Junod,DRP

Distribution w/ encl: (VIA E-MAIL)

B. McCabe, RI EDO Coordinator

B. Norris - FitzPatrick

G. Hunegs, Nine Mile Point

R. Fernandes, FitzPatrick

S. Bajwa, NRR

D. Hood, NRR

M. Campion, RI

Inspection Program Branch (IPAS)

R. Correia, NRR

DOCDESK

DOCUMENT NAME: G:\\ BRANCH 1\\NMPSTUFF\\NMP9814.lNS

To receive a copy, Indicate in the box: c - copy w/ attachment / enclosure

"E" = Copy w/

attachment / enclosure

  • N" = No copy

0FFICE

Rl/DRP

Rl/DRP

Rl/DRP

NAME

BNorris/g g

WCook/M M

LDoerflein/M

'

'

DATE

10/24/98

10bc/98

10k6/98

OFFICIAL RECORD COPY

I