Forwards SE Re & Suppl Which Submitted Response to NRC 980406 RAI Re GL 92-08, Thermo-Lag 330-1 Fire Barriers, for Plant,Unit 2
ML20154C660
Person / Time
Site: Beaver Valley
Issue date: 10/01/1998
From: Brinkman D
NRC (Affiliation Not Assigned)
To: Cross J
DUQUESNE LIGHT CO.
Shared Package
ML20154C665 List:
References
GL-92-08, GL-92-8, TAC-MA1347, NUDOCS 9810060356
Download: ML20154C660 (3)


Text

_ _ -. _. _ _. _ _ _

Octohar 1, 1998 Mr. J. E. Cross President.- Generation Group Duquesne Light Company Post Office Box 4 Shippingport, PA 15077

SUBJECT:

GENERIC LETTER 92-08 CLuc, OUT REPORT,'THERMO-LAG RELATED AMPACITY DERATING ISSUES FOR BEAVER VALLEY POWER STATION, UNIT NO. 2 (TAC NO. MA1347)

Dear Mr. Cross:

By [[letter::L-97-039, Provides Notification of Completion of Corrective Actions for Thermo-Lag 330-1 Fire Barrier Systems at BVPS,Unit2,as Requested in GL 92-08.Response to 970829 RAI Re Ampacity Derating Issues & Calculation DE&S-SR/EM01,also Encl|letter dated October 13,1997]], as supplemented May 27,1998, Duquesne Light Company (DLC) submitted a response to the NRC staff's April 6,1998, Request for Additional information (RAI) related to Generic Letter (GL) 92-08, "Thermo-Lag 330-1 Fire Barriers," for Beaver Vciley Power Station, Unit No. 2 (BVPS-2). The NRC staff, in conjunction with its contractor, Sandia National Laboratories (SNL), has completed its review of DLC's analytical approach for ampacity derating determinations. The results of the review are documented in the enclosed safety evaluation and in the SNL Technical Letter Report, "A Technical Evaluation of the Beaver Valley Fire Barrier Clad Cable Ampacity Assessments," dated January 23,1998, (see attachment to enclosed safety evaluation).

On the basis of our review and DLC's commitment to take corrective actions to address the 4

overloaded cables in conduits 2CL213ND and 2CL6070E, the NRC staff concludes that there are no outstanding ampacity derating issues identified in GL 92-08 for BVPS-2. This completes the NRC staff's action under TAC No. MA1347.

Please contact me at 301-415-1409 if you have any further questions regarding this issue.

r-Sincerely, Dona d S. Brinkman, Senior Project Manager Project Directorate 1-2 Division of Reactor Projects - 1/Il Office of Nuclear Reactor Regulation Docket No. 50-412

Enclosure:

Safety Evaluation cc w/ encl: See next page DISTRIBUTION:

Docket File THarris (e-mail SE, TLH3)

AKlugler PUBLIC OGC h%( l PDI-2 Reading ACRS g

- JZwolinski PEselgroth, RGN I RCapra JCalvo MO'Brien RJenkins DBrinkman PGill I,; J,, 'g 7 OFFICE PDI-2/PM /)1/

PQif2M PDi 2/D NAME DBrinkman:

hB RCapra @F DATE 4 /M /98 98 I/ 8/98 OFFICIAL RECORD COPY 7

f y. [ h h h m[ M DOCUMENT NAME: a:\\BVMA1347.LTR i

9810060356 981001 PDR ADOCK 05000412

.P PDR

l e'

j

,p T

UNITED STATES j

NUCLEAR REGULATORY COMMISSION 2

WASHINGTON, D.C. 3066H001 October 1, 1998

,g, Mr. J. E. Cross President - Generation Group Duquesne Light Company Post Office Box 4 Shippingport, PA 15077 l

SUBJECT:

GENERIC LETTER 92-08 CLOSEOUT REPORT, THERMO-LAG RELATED l

AMPACITY DERATING ISSUES FOR BEAVER VALLEY POWER STATION, UNIT NO. 2 (TAC NO. MA1347)

Dear Mr. Cross:

By [[letter::L-97-039, Provides Notification of Completion of Corrective Actions for Thermo-Lag 330-1 Fire Barrier Systems at BVPS,Unit2,as Requested in GL 92-08.Response to 970829 RAI Re Ampacity Derating Issues & Calculation DE&S-SR/EM01,also Encl|letter dated October 13,1997]], as supplemented May 27,1998, Duquesne Light Company (DLC) submitted a response to the NRC staff's April 6,1998, Request for Additional Information (RA') telated to Generic Letter (GL) 92-08, "Thermo-Lag 330-1 Fire Barriers," for Beaver Valley Fower Station, Unit No. 2 (BVPS-2). The NRC staff, in conjunction with its contractor, Sandia National Laboratories (SNL), has completed its review of DLC's analytical approach for ampacity derating determinations. The results of the review are documented in the enclosed safety evaluation and in the SNL Technical Letter Report, "A Technical Evaluation of the Beaver Valley Fire Barrier Clad Cable Ampacity Assessments," dated January 23,1998, (see attachment to j

enclosed safety evaluation).

On the basis of our review and DLC's commitment to take corrective actions to address the overloaded cables in conduits 2CL213ND and 2CL6070E, the NRC staff concludes that there are no outstanding ampacity derating issues identified in GL 92-08 for BVPS-2. This completes the NRC staff's action under TAC No. MA1347.

Please contact me at 301-415-1409 if you have any further questions regarding this issue.

Sincerely, k

/

W Donald S. Brinkman, Senior Project Manager Project Directorate 1-2 Division of Reactor Projects - t/11 Office of Nuclear Reactor Regulation i

Docket No. 50-412

Enclosure:

Safety Evaluation cc w/ encl: See next page

J. E. Cross Beaver Valley Power Station, Units 1 & 2 Duquesne Ught Company cc:

Jay E. Silberg, Esquire Bureau of Radiation Protection Shaw, Pittman, Potts & Trowbridge Pennsylvania Department of 2300 N Street, NW.

Environmental Resources Washington, DC 20037 ATTN: Michael P. Murphy Post Office Box 2063 Director-Safety and Ucensing Harrisburg, PA 17120 Department (BV-A)

Duquesne Ught Company Mayor of the Borough of Beaver Valley Power Station Shippingport PO Box 4 Post Office Box 3 Shippingport, PA 15077 Shippingport, PA 15077 Commissioner Roy M. Smith Regional Administrator, Region I West Virginia Department of Labor U.S. Nuclear Regulatory Commission Building 3, Roore 31g 475 Allendale Road Capitol Complex King of Prussia, PA 19406 Charleston, WV 25305 Resident inspector Director, Utilities Department U.S. Nuclear Regulatory Commission Public Utilities Commission Post Office Bc 2g8 180 East Broad Street Shippingport, PA 15077 Columbus, OH 43266-0573 Director, Pennsylvania Emergency Duquesne Ught Company Management Agency Beaver Valley Power Station Post Office Box 3321 PO Box 4 Harrisburg, PA 17105-3321 Shippingport, PA 15077 ATTN: S. C. Jain, Senior Vice President Ohio EPA-DERR Nuclear Services (BV-A)

ATTN: Zack A. Clayton Post Office Box 104g Mr. J. A. Hultz, Manager Columbus, OH 43266-014g Projects & Support Services First Energy Dr. Judith Johnsrud 76 South Main Street National Energy Committee Akron, OH 44308 Sierra Club 433 Oriando Avenue State College, PA 16803 i

Duquesne Ught Company Beaver Valley Power Station PO Box 4 Shippingpo,1, PA 15077 ATTN: R. D. Brandt, Division Vice President, Nuclear Operations and Plant Manager (BV-SOSB-7) i