ML20154C254
| ML20154C254 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 09/30/1998 |
| From: | FLORIDA POWER CORP. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20154C259 | List: |
| References | |
| NUDOCS 9810060213 | |
| Download: ML20154C254 (1) | |
Text
__
Document Transmittil #: 105490 Date: 9/30/98 Tc:
NRC (DC DESK)
MAC: N/A Holder #: 1242 Destination:
==
Description:==
Copy Totals Document:
Revision:
Comment:
INFO CNTL MSTR AR0304 19 1
0 0
' AR0701
'18 1
0 0
instructions to the Addressee: Please verify the document (s) received agrees with the above information.
Engineering managers are required by NEP-121 to determine if new, revised, or temporary changes to procedures affect job functions of their personnel. Managers will communicate change information appropriately and provide documentation of any training conducted to the Engineering Training Coordinator.
Operations department must attach old document (s) or portions of document (s) superseded by the above to this transmittal.
The signature indicates acknowledgment of receipt of the above document (s) and that documents have been updated. Retum signed and dated transmittal to Document Control within 15 working days of transmittal date to mail code:
4 Aofa /
j NA1C
.,,f3 Florida Power Corporation i.; J #
Document Control, NA1C Crystal River Energy Complex 157S0 W. Power Line St.
Crystal River, FL 34428-6708 Signature of Addressee:
Date:
9810060213 990930 PDR ADOCK 05000302 F
PQ