August 30, 1988
/
Docket Nos. 50-321, 50-366
Geprgia Power Company
(MTN: Mr. W. G. Hairston, III
Senior Vice President -
Nuclear Operations
P. O. Box 4545
Atlanta, GA 30302
Gentlemen:
SUBJECT:
NRC INSPECTION REPORT N05. 50-321/88-22 AND 50-366/88-22
This refers to the Nuclear Regulatory Comission (NRC) inspection conducted
by J. E. Menning on June 25 through July 22, 1988.
The inspection included
a review of activities authorized for your Hatch Nuclear Plant.
At the
conclusion of the inspection, the findings were discussed with those members
of your staff identified in the enclosed Inspection Report.
Areas examined during the inspection are identified in the report.
Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of
activities in progress.
The inspection findings indicate that certain activities appeared to violate
NRC requirements.
However, because all of the criteria for categorization of
licensee-identified violations were met, the violations are not being cited.
The details pertaining to the licensee-identified violations are described in
the enclosed Inspection Report.
In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
will be placed in the NRC Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sincerely,
Original Signed by
Virgil L. Brwnlec
00091jogg Q$o$0
1
Virgil L. Brownlee, Chief
p
P
Reactor Projects Branch 3
0
Division of Reactor Projects
Enclosure:
NRC Inspection Report
cc w/ encl:
(See page 2)
,
,
//
$(d
/
.
h
. .
.reoI
_ _ _ _ ,
'
<
-
.u
.
Georgia Power Company
2
August 30, 1988
cc / encl:
(9yP. Mcdonald,ExecutiveVicePresident,
.
, Juclear Operations
W. T. Beckham, Vice President, Plant Hatch
O V C. Nix, General Manager
lor'M. Fraser, Site Quality Assurance
Manager
V Gucwa, Managar, Nuclear Safety
id Licensing
. c,w/ encl:
A Resident Inspector
DRS, Technical Assistant
L Mgh S. Jordan, Executive Secretary
Document Control Desk
State of Georgia
Ril
Rll
ON
LTrocine:ser
MSinkule
08/Jo/88
08/);/88