's Northem States Power Compan 414 Ncollet Mat Minneapoks. M nnesota 55401 Tek phone (612) 330 5500 May 4, 1988 Director of Nuclear Reactor Regulation U S Nuclear Regulatory Commission Attn:
Document Control Desk Washington, DC 20555 PRAIRIE ISLAND NUCLEAR GENERATING PIANT Docket Nos. 50 282 License Nos. DPR-42 50-306 DPR-60 Request for Meeting With NRC Staff Related to Project for Addition of Two Emergency Diesel Generators The purpose of this letter is to request a meeting with the NRC Staff to discuss our preliminary plans for the addition of two new safety related emergency diesel generators at the Prairie Island Nuclear Generating Plant.
The new emergency diesel generators are intended to improve the flexi-bility and reliability of the emergency power system, provide an al-ternate ac power capability to meet NRC station blackout requirements, and provided additional flexibility in the plant cooling water system.
This modification will require NRC Staff review and approval since changes to the Technical Specifications will be required, Because of the cost and complexity of this modification, it is important for us to solicit input from the NRC Staff early in the project.
If possi-ble, a meeting in June, 1988 with the Staff is requested.
A prelimi-nary agenda for this meeting is attached.
Please contact us if you have any questions related to our request.
MN David Musolf Manager Nuclear Support ervices c: Regional Administrator, Region III, NRC NRC St Resident Inspector 4
V NRC Project Manager
,k G Charnoff Attachment 8805120123 880504 PDR ADOCK 05000282 P
s May 4, 1988 PROPOSED AGENDA FOR MEETING BETWEEN NRC STAFF AND NORTHERN STATES POWER COMPANY INSTALLATION OF TWO NEW SAFETY GRADE DIESEL CENERATORS AND ENHANCEMENTS TO PLANT COOLING WATER SYSTEM OBJ ECTIVE: To present preliminary plans to NRC Staff related to planned installation of two new safety grade diesel generators at the Prairie Island plant.
NRC Staff views on several important licensing issues will be solicited.
Topic
- 1. Introduction and Brief Explanation of the Reason for the Project
- 2. Description of Current Prairie Island Emergency AC System
- 3. Description of Current Prairie Island Cooling Water System
- 4. Description of Proposed Emergency AC System With Addition of D$ and D6 Preliminary One Line Diagram Preliminary Switchgear and Logic Changes Supply to 121 Cooling Water Pump Sizing of D5 and D6 Cooling System for D5 and D6
- Use of Safeguards Bus Tie Breakers for Meeting Station Elackout Rule Alternate AC Requirements
- Nov Building Alternatives Preliminary Schedale
- 5. Diesel Vendor Selection Process (including potential foreign vendor and unique NRC requirements which may be imposed)
PROPOSED AGENDA FOR HEETING BETWEEN NRC STAFF AND NORTHERN STATES POWER COMPANY INSTAL 1ATION OF TWO NEW SAFETY GRADE DIESEL GENERATORS AND ENHANCEMENTS TO PIANT COOLING WATER SYSTEM Topic
- 6. Licensing Issues Technical Specification Changes to Reflect Two Diesel Generators per Unit vs. Shared Diesel Generators Technical Specification Changes to Reflect "swing" Safety Related Cooling Water Pump
- Plans and Schedule for Submitting License Amendment Request for NRC Review and Approval
- 7. NRC Preliminary Comments, Questions and Concerns J
J 1