AUS 261988 r'
i f
Docket Nos. 50-348, 50-364 License Nos. NPF-2 and NPF-8 l
i i
Alabama Power Company i
ATTN: Mr. W. G. Hairston, III l
Senior Y4e President-Nuclear j
Operations P. O. Box 2641 Birmingham, AL 35291-0400 i
Gentlemen:
f i
j
$UBJECT: TRIENNIAL POSTFIRE SAFE SHUT 00WN CAPABILITY REVERIFICATION INSPECTION t
i This letter is to confirm the dates September 26-30, 1988, for the reverifica-tion of the postfire safe shutdown capability (Module 64150) inspection of j
Farley, which was established during the telephone conversation of August 22, i
1983, between David Jones of your staff, and Hugh Dance of this office.
l The purpose of this inspection is to verify your continued compitance with i
10 CFR 50, Appendix R, Sections III.G, III.J., III.L. and !!!.0; reverify your j
postfire safe shutdown capability; and review your configuration management I
{
program with respect to fire protection. This will be a team type inspection, f
~
composed of personnel from NRC Region II office.
I f
In order for us to perform the inspection in an expeditious manner, we request I
that you have the materials listed on the enclosure to this letter readily available to the inspection team when they arrive on site on September 26, i
{
1988.
I 1
Your cooperation with us during this inspection will be appreciated.
Please j
contact us if you have any questions, j
q I
j Sincerely, i
i i
C l
Luis A. Reyes Otrector i
Division of Reactor Projects 1
Enclosure:
(
Postfire Safe Shutdown Capability 4
I Reverification Inspection:
l
}
Requested Materials l
I cc:
(See page 2) l J
l mWAE l,
JEol 8
AUS 261988 Alabama Power Company 2
cc w/ enc 1:
B. M. Guthrie Executive Vice Preside it D. N. Morey, General Manager -
Nuclear Plant J. D. Woodard, Vice President -
Nuclear Generation J. W. McGowan, Manager-Safety Audit and Engineering Review S. Fulmer, Supervisor-Safety Audit and Engineering Review bec w/ encl:
NRC Resident Inspector DRS Technical Assistant E. Reeves, Project Manager, NRR State of Alabama J. U111, RIII J. Singh, RIV C. Ramsey, RV D. Kubicki, NRR Document Control Desk Ryg0 gy
?,!
R7 RII RI t
q
/f @,;
RIQ O
GWise7an Ne *dt AGibson HDance DVerrelli fpDWard:es 8/3Y/63 8/Ji/SS S,]//SB S/q'/SS i
S/s t /SS 8/af/88
t j
ENCLOSURE POSTFIRE SAFE SHUTOOWN CAPABILITY REVERIFICATION INSPECTION:
REQUESTED MATERIALS l
i 1.
Current revision of the Farley Fire Protection Program Report;
'l 2.
Current revision of piping and instrumentation (flow) diagrams for hot strindby and cold shutdown systems, alternate shutdown, and RCP oil collection system; 3
3.
Plant layout drawings showing the location of fire barriers and hot standby and cold shutdown equipment; 4.
Electrical raceway drawings 1
5.
Cable and raceway location drawings; 6.
Plant operating procedures for postfire safe shutdown and repair procedures for cold shutdown systems (if any);
i 1
7.
Plant procedures governing design changes and work requests which 1
implement the configuration control program for fire protection; 8.
All approved exemption requests and the associated NRC generated SERs approving or denying these exemptions; 9.
All engineering evaluations prepared in accordance with Generic etter 86-10 justifying NFPA code deviations, the lack of area wide supp?ession l
or detection, and nonrated fire barriers or fire barrier penetrations;
- 10. The associated circuits analysis and breaker / fuse coordination study;
- 11. All 50.59 evaluations which justify design modifications should be l
j available on site.