Text
.~
-
'
.
,
,
.
s
'
Enclosure 1
SALP 7
APPENDIX
SALP BOARD REPORT
.
--
V. S. NUCLEAR REGULATORY C0f7ISSION
REGION III
SYSTEMATIC ASSESSMEt,T OF LICENSEE PERFORMANCE
50-373/880C1 50-374/88001
Inspection Report No.
Corronwealth Edison Cortpany
hame of Licensee
i
LaSalle County Nuclear Power Station
Name of Facility
Nover.ber 16, 1986 through March 15, 1988
Assessment Period
)
$%f ISSES SSE
G
-
-
-
- . _ _
-
._
.
-
. . . _ .
_.
_
_
'
.
,
e
'
LaSalle County Nuclear Power Station
'
i
A.
Sumetry of Meeting with Comenwealth Edison Company on June 21, 1988
_
}
The findings and cenclusions of the SALP Board are documented in
~
Report No. 50-373/88001; 50-374/88001 and were discussed with the licensee on
!
June 21, 1988, at the Brookfield Towr. ship Hall in Seneca, Illinois.
The
.
licensee's regulatory performance was presented and found acceptable in
-
each functional area.
,
4
The hKC acknowledged the improvements in performance at LaSalle as
compared to SALP periods 3, 4 and 5 and suggested that the licensee needs
,
'
to raintain their effort to sustain this long-term improving trend in
order to acHese superior performance.
While the treeting was primarily a discussion between the licenses
!
and NF.C. it was cpen tc rembers of the public as observers.
The following licensee and NRC personnel were in attendance, as well
as the noted observers.
!
i
Corronwealth Ediscn Corg
j
1
C. Reec, Senior Vice President
'
.
i
G. Diederich, Station Mar.ager
!
!
D. Ceres, District Superintendent
l
!
C. Allen, Nucleer Licensing Administrater
!
H. Bliss, Nuclear Licensing Manager
,
D. Farrar. Technical Services Manager
l
4
l
W. Huntingten Services Superintendent
l
{
L. Aldrich, Radiation / Chemistry Supervisor
R. Clark, Quality Control Supervisor
4
I
W. Marcis, Site Engineering Supervisor
l
P. Manning. Assistent Superintendent - Tech. Serviccs
-
T. Harrerich, Regulatory Assurance Supervisor
'
l
H. Massin, BWRE
!
M. Servoss. Offsite Resiew, Dept. of Nuclear Safety
!
'
L., Lauterbach, Onsite Nuclear Safety Supervisor
l
T. Shaffer. Training Supervisor
(
,
R. Morely, Jr. , Security Administrator
!
'
D. Winchester, Quality Assurance
J. Atchley, Operating Engineer
)
J. Renwick, Production Superintendent
!
,
!
l
'
!
4
t
i
I
i
'
i
'
i
,. ,-
j
'
-
.
l
-
l
Nuclear Regulatory Conrnission
i
A. B. Davis, Region III Administrator
W. L. Forney, Chief. Projects Branch 1
l
M. A. Ring, Chief Projects Section IB
!
'D
E. Jones, Project Engineer
R. D. Lanksbury, Senior Resident Inspector
R. A. Kopriva, Resident Inspector
R. M. Lickus, Chief, State and Governrrent Affairs
M. A. Hunter, Co-op
i
T. C. Barton, Co-op
- i
P. C. Shemanski, Project t!anager, NRR
Other
l
B. Widman, Brookfield Township Supervisor
L. Gage Brockfield Township Clerk
C. Moran, Brookfield Township Trustee
i
R. Gage, Brookfield Resident
{
R. Widman, Brookfield Resident
R. Shultz, Illinois Departrnent of Nuclear Safety
!
J. Hustis, Reporter
!
J. Perry, Trustee SRFPD
i
B.
Cenrents Received Frot Licensee
Cormonwealth Edison's response to the LaSalle SALP 7 Board report dated
l
August 19, 1988, had no conrents addressing the specific centent of the
i
report.
One typographical error was identified by the NRC as stated it,
i
Enclosure 2.
}
[,
C.
Regieral Administratcr's Cerclus,1,on Based Cn Corsi,d,e, ration Of
l
Licensee C'oMnents
i
r
I but ccccluded that the overall ratir:gs in the affected areas have not
!
changed.
!
l
!
l
i
l
!'
-
-
-
- -