Gag a Por,cr Cypry
- 33) Ke rrm A,v ue r
's e Ava Georga 3TG Tcqw-e 404 S2b E'6 6 4545 M r % Gv,rga W 32 Georgia Power Executive Department SL-4452 0985U X7GJ17-C110 X7GJ17-C210 April 28, 1988 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Hashington, D.C.
20555 PLANT V0GTLE - UNITS 1, 2 NRC DOCKETS 50-424, 50-425 OPERATING LICENSE NPF-68 CONSTRUCTION PERMIT CPPR-109 RESPONSE TO NRC GENERIC LETTER 88-03 "STEAM BINDING OF AUXILIARY FEEDWATER PUMPS" Gentlemen:
By the subject Generic Letter dated February 17, 1988, NRC requested that Georgia Power Company submit an affirmation of compliance with the requirements of I&E Bulletin 85-01 that the plant rocedures monitoring Auxiliary Feedwater (AFH) fluid conditions and identifying and restoring from AFH steam binding are in place and will be maintained.
Monitoring of Auxiliary Feedwater (AFH) system fluid conditions when the AFH system is required to be operable is accomplished as part of operator daily rounds.
Plant Vogtle Unit 1 Procedure 11882-1, "Outside Operator Rounds Sheets" requires checking of the three AFH pumps suction and discharge piping temperatures by touch once per shift (12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />).
Symptoms of AFH steam binding and corrective actions to restore the AFH system to operational status are addressed in Unit 1 Standard Operating Procedure (SOP) 13610-1, "Auxiliary Feedwater System".
This program will remain in place for Unit I and a similar program will be implemented for Unit 2 prior to initial criticality.
The following information is provided for cost evaluation of this Generic Letter:
1.
Staff time to perform the requested confirmation and any needed followup actions - 16 manhours.
2.
Staff time to prepare requested documentation - 23 manhours.
88050
\\0 e
60289 880428 DCD
c 9
GeorgiaPowerd U. S. Nuclear Regulatory Commission April 28, 1988 Dage Two Mr. R. P. Mcdonald states that he is authorized to execute this oath on behalf of Georgia Power Company, and that to the best of his knowledge and belief the facts set forth in this letter are true.
Sincerely, hL R. P. Mcdonald Executive Vice President Nuclear Operations Sworn to and subscribed before me this 28th day of April 1988.
J H/h f
NotaryBdbl\\p MJB:ju W%sso c: Georaia Power Company Mr. P. D. Rice, Vice President and Vogtle Project Director Mr. G. Bockhold, Jr., General Manager - Plant Vogtle GO-NORMS U. S. Nuclear Reaulatory Commission. Washinaton D.C.
Mr. J. B. Hopkins Licensing Project Manager - Vogtle (2 copies)
U. S. Nuclear Reaulatory Commission. Reaion II Dr. J. N. Grace,~ Regional Administrator ~
Mr. J. F. Rogge, Senior Resident Inspector, Operations - Vogtle Mr. R. T. Schepen, Senior Resident Inspector, Construction - Vogtle 0985U
.