APPENDIX A NOTICE OF VIOLATION i
Philadelphia Electric Company
'Occket,No. 50-277 Peach Bottom Unit 2 License No. DPR-44 i
As a result of the-inspection conducted on March 14-18, 1988, and in accord-ance with the "General Statement of Policy and Procedure for NRC Enforcement 7
Actions," 10 CFR Fart 2, Appendix C (Enforcement Policy) (1988), the following violation b s identified:
10 CFR 50, Appendix B, Criterion VI, requires that measures be established to control the issuance of drawings and that drawings be reviewed for adequacy and approved for release for distribution and use at the location where the work will be performed.
l Contrary to the above, on March 16, 1988 the inspector identified Emergency Service Water piping being fabricated to sketches that were not in the drawing control system, and showed no indication of i
approval prior to release, i
i This is a Severity Level IV violation (Supplement II).
[
t Pursuant to the provisions of 10 CFR 2,201, Philadelphia Electric Company is i
hereby required to submit to this office within thirty days of the date of the letter which transmitted this Notice, a written statement or explanation in reply, including: (1) the corrective steps which have been taken and the results achieved; (2) corrective steps which will be taken to avoid further violations; and (3) the date when full compliance will be achieved. Where r
good cause is shown, consideration will be given to extending this response
- time, r