ML20149J433
| ML20149J433 | |
| Person / Time | |
|---|---|
| Site: | Summer |
| Issue date: | 02/16/1988 |
| From: | Nauman D SOUTH CAROLINA ELECTRIC & GAS CO. |
| To: | Grace J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| Shared Package | |
| ML20149J436 | List: |
| References | |
| SPR-88-002, SPR-88-2, NUDOCS 8802230052 | |
| Download: ML20149J433 (2) | |
Text
10CFR50.36 f-gth Carot na Electric & Gas Company n. u n lu ia.
29218 Nuclear Operations SCE&G 4
..c - -
February 16, 1988 Dr. J. Nelson Grace Regional Administrator U. S. Nuclear Regulatory Commission Region II, Suite 2900 101 Marietta Street, N. W.
Atlanta, Georgia 30323
Subject:
Virgil C. Summer Nuclear Station Docket No. 50/395 Operating License No. NPF-12 Special Report (SPR 88-002)
Steam Generator Tube Eddy Current Examination
Dear Dr. Grace:
This report is being submitted in accordance with Technical Specification 4.4.5.5(b). This inspection constitutes the "Third Inservice Inspection" of Steam Generator tubes as required by Technical Specification 4.4.5.2 and 4.4.5.3.
This report includes the following:
1.
Introduction 2.
The number and extent of tubes inspected 3.
Location and percent of wall thickness penetration for each indication of an imperfection, degradation, or defects 4.
Identification of tubes plugged or repaired Should there be any questions, please call s-at your convenience.
r; 1: yours, 4
./
uma CJM/ DAN:jz Attachment t
c:
Page 2 g
o urmush P
1
Dr. J. Nelson Grace February 16, 1988
.l Page 2 c:
- 0. W. Dixon, Jr./T. C. Nichols, Jr.
E. C. Roberts
- 0. S. Bradham W. A. Williams, Jr.
General Managers L. A. Blue C. A. Price S. R. Hunt R. B. Clary W. R. Higgins J. R. Proper R. M. Campbell, Jr.
K. E. Hodland J. C. Snelson G. O. Percival R. L. Prevatte J. B. Knotts, Jr.
Marsh & McLennan Document Management Branch INP0 Records Center ANI Library NSRC RTS NPCF File