ML20149J237
| ML20149J237 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 02/19/1988 |
| From: | Mcdonald R ALABAMA POWER CO. |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| Shared Package | |
| ML20149J047 | List: |
| References | |
| NUDOCS 8802220324 | |
| Download: ML20149J237 (1) | |
Text
Alabama Power Company 600 North 18th Street Post office Box 2641 Birmingham, Alabama 352914400 Telephone 205 250-1835 L
L,P;,
ngsdent Alabama Power Docket No. 50-364 the sovrten emne system 10CFR50 Appendix J February 19, 1988 U. S. Nuclear Regulatory Comnission Attention: Document Control Desk Washington, D. C.
20555 Gentlemen:
Joseph M. Farley Nuclear Plant - Unit 2 Reactor Containment Building Integrated Leakage Rate Test Pursuant to the requirements of 10CFR50, Appendix J, Section V.B,, Alabama Power Company herewith submits the Joseph M. Farley Nuclear Plant Unit 2 second periodic Reactor Containment Building Integrated Leakage Rate Test Report. This report describes and sunnarizes the Integrated Leakage Rate Test (ILRT) activities performed as a part of the Unit 2 fifth refueling outage. This test was completed on November 21, 1987.
Other pertinent report information, including, as applicable, test plans and schedules, test results and reports and test methods and procedures, is available at Farley Nuclear Plant for review.
If there are any questions, or if additional information is needed, please advise.
Yours truly,,
g' a
R. P. Mcdonald RPM / CDP:csl-V3
\\
Enclosure cc: Mr. L. B. Long Oli Dr. J. N. Grace, w/1 enclosure 1
Mr. E. A. Reeves g
g Mr. W. H. Bradford l
l i
ADO K O PDR R
__