Text
_
____
_ _ - - - _ _ _ _ _ _ _ _ _ .
,() ' i
"
.,
,
~ O RfC
UNITED STATES
M
o
NUCLEAR nEGULATORY COMMISSION
y
n
REGION IV
h
$
,$
611 HYAN PLAZA DRIVE, SUITE 1000
,
I
o '.
'[
%,
/
-
September 12, 1978
In Reply Refer To:
Docket No. 50-298/78-15
Nebraska Public Power District
ATTN: Mr. J. M. Pilant, Director
Licensing and Quality Assurance
P. O. Box 499
Columbus, Nebraska 68601
Gentlemen:
This refers to the inspection conducted by Mr. E. H. Johnson of this
office during the period August 28-30, 1978 of activities authorized by
NRC Operating License DPR-46, and to the discussion of the findings
with Mr. L. C. Lessor.
Principal areas examined during the inspection included:
(1) routine
plant operations; and (2) maintenance activities.
Within these areas,
the inspection consisted of selective examinations of procedures and
'
representative records, interviews with personnel, and observations by
the inspector.
Two new unresolved items were noted and are identified in the enclosed
report.
~
Based on the results of this inspection it appears that one of your
activities was not carried out in accordance with an industry approved
code.
You are requested to submit to this office within 20 days of your
rec::1pt of this notice, a written statement in reply including:
(1)
actions you have taken to satisfy the requirements of this code or
alternative steps you have taken, or are planning, to provide equivalent
protection; and (2) the date when the above actions will be completed.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the:
enclosed inspection report will be placed in the NRC's Public Document
Room.
If this report contains any information that you or your contrac-
tors believe to be proprietary, it is necessary that you make a written
application within 20 days to this office to withhold such information
781 lG CCY
-_
_ _ _ _ _ _ .
e
4
Nebraska Public Power District
-2-
September 12, 1978
from public disclosure.
Any such application must include a full state-
ment of reasons on the basis of which it is claimed that the information
is proprietary, and should be prepared so that proprietary information
identified in the application is contained in a separate part of the
document.
If we do not hear from you in this regard within the specified
period, the report will be placed in the Public Document Room.
Should you have any questions concerning this inspection, we will be
pleased to discuss them with you.
Sincerely,
.lbb$<2&v
G. L. Madsen, Chief,
Reactor Operations and
Nuclear Support Branch
Enclosures:
1.
Notice of Deviation
2.
IE Inspection Report No. 50-298/78-15
l
l
cc w/ enclosures:
l
L. C. Lessor, Superintendent
!
Cooper Nuclear Station
P. O. Box 98
Brownville, Nebraska 68321
.
.