ML20148A954
| ML20148A954 | |
| Person / Time | |
|---|---|
| Issue date: | 09/15/1978 |
| From: | Potapovs U NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Woodson R BLACK & VEATCH |
| Shared Package | |
| ML20148A937 | List: |
| References | |
| REF-QA-99900526 NUDOCS 7810310011 | |
| Download: ML20148A954 (1) | |
Text
UNITED STATES g Efooq'o NUCLEAR REGULATORY COMMISSION g*
g
[
REClONIV n
611 RYAN PLAZA DRIVE. suite 1000 5
g j
2 ARLINGTON, TEXAS 76011
+/
15 SEP 1978 f
Docket No. 99900526/78-01 Black & Veatch Consulting Engineers Attn:
Mr. R. D. Woodsen Head, Power Division Post Office Box 8495 Kansas City, Missouri 64114 Gentlemen:
Thank you for your letter of September 7,1978, in response to our 15, 1978. As a result of our review, we find letter dated August that additional information, as discussed with your Mr. R. E. Blaisdell during a telephone call on September 13, 1978, is needed. The additional information necessary is summarized as follows:
I Response B:
A description of the actions that will be taken based on
~
~
the results of the investigation scheduled for completion on October 30, 1978.
The scope and salient points of the on-the-job training that was accomplished, and how this training was documented.
The tentative schedule for internal audits in the areas of document control and QA r.ords.
Response C:
Describe how the "QA Group instructions" are related to the
, formalized program of the Quality Assurance Program-Nuclear.
Please provide this additional information within twenty (20) days in order that we may complete our review in a timely manner.
Sincerely, 1 I, t
r hk(%
e-j Uldis Potapovs, C ie Vendor Inspection Branch a
L
_. _ -.