ML20141M184

From kanterella
Jump to navigation Jump to search

Forwards Rev 1 to License Change Application 186 to License NPF-1,changing TS 4.0.3 to Negatively State That Failure to Perform Required Surveillances on Schedule Constitutes Noncompliance W/Operability Requirements of LCO
ML20141M184
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 03/27/1992
From: Cross J
PORTLAND GENERAL ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20141M186 List:
References
GL-87-09, GL-87-9, TAC-M75774, NUDOCS 9204020075
Download: ML20141M184 (2)


Text

<

e!!ss.

.__ ee!

m Portland General Electric Company 2

James E. Cross l

Vice President and Chiet Nuclear Officer 1

March 27, 1992 l

Trojan Nuclear Plant Docket 50--344 License NPF-1 l

U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington DC 20555

Dear Sir:

Supplement to License Chango Application 15 Rp"iwion 1 Attached is one signed original of a supplement to License Changa Application (LCA) 186, Revision I requesting amendment of Oporating Licenso NPF-1.

This LCA responds to the recommended changes contained in Cecoric Lntter (CL) 87-09, " Sections 3.0 and 4.0 of the Standard Technical Specifications (STS) on the Applicability of Limiting Conditions for Operation and Surveillance Requirements".. Soveral minor administrativo changes are also included.

This LCA also includos our response to yuur Roquest for Additional Information on the Licenso Amendment Application under CL 87-09 for Trojan

.NuclearPlant(TACNo.fif5774).

We request that LCA 186, Revision 1 be replaced in its entirety by this supplomont.

Changes made to Attachments A and C are denoted by side bars.

l l

i f.

IL I.

- : n., r:.

4 9204020075 920327 i

PDR ADOCK 05000344

\\t p

PDR

\\

121 SW Salma Street, Portland, OR 97204 673/464-8897 a:

3 a

Document Control' Desk

' March 274-1992

.? ate 2

-Also attached is one signed copy of a certificato of Service for this

-_ supplement to-LCA 186, Revision 1 to the Chief Executivo of-Columbia County ar.d to the Director of the Oregon Depcetment of Energy.

Sinceroly,

.c-- j}

r, ls

.)j

- }V WI t'.d Q.kuv,q;_,_,j W. R. Robinson-for J. E. Cross Attachments c: Mr John B, Martin-Regional Administrator, Negion V U.S. Nuclear Regulatory Commission Mr.-David StewartL mith S

State-of_ Oregon Department of Energy Mr. R. C. Barr

.NRC Realdent Inspector Trojan-Muclear Plant e

. _ -