i /'
hh' h
J W$LF CREEK
?
r NUCLEAR OPERATING CORPORATION May 20,1997 i
QS 97-0024 Ameron Protective Coating Group 11605 Vimy Ridge Road P.O. Box 192610 Little Rock, AR 72219 2610 Attention:
Mr. Michael Lamb, Quality Assurance Manager j
Subject:
Evaluation of Ameron Corrective Action Status Report to WCNOC/ Supplier Quality Audit l
Findings
Reference:
- 1) WCNOC Audit Report-A350-K002
- 2) Ameron Response -letter dated 2/27/97
- 3) WCNOC/SQ Evaluation of Ameron Response - QS 97-0016 letter dated 3/28/97
- 4) Ameron Corrective Action Status Report-letter dated 5/1/97
Dear Mr. Lamb:
Wolf Creek Nuclear Operating Corporation / Supplier Quality has received and evaluated Ameron's Corrective Action Status Report to the findings identified during the audit conducted 1/22-23/97 and 1/28-31/97. Additional information was obtained from the Ameron QA Manager by phone on 5/16/97 to supplement the status report.
Below is a summary of the WCNOC/SQ evaluation. It is requested that Ameron provide another status report by 7/1/97. Ameron should state in the report what specific and detailed actions have been taken to date and provide the additionalinformation requested.
J As stated in the WCNOC/SQ letter dated 3/28/97, these updates are important to ensure that corrective action due dates are being met and implemented as required. It is imperative that this occurs; failure to do so may result in additional conditions and restrictions imposed by utilities, including source surveillance activities.
RON NUMBER FINDING STATt's AcrlONs TAKEN AND REQUIRED 01/97-001 Open Detailed corrective action status update due 7/1/97. Per the Ameron QA Manager on 5/16/97, procedures are currently in revision process.
4 e e.
01/97-002 Open Detailed corrective action status update due 7/1/97. Per the EEE.
Ameron QA Manager on 5/16/97, procedures are currently in EEE revision process.
E1
=
01/97-003 Open Detailed corrective action status update due 7/1/97. Per the Ameron QA Manager on 5/16/97, the Quality Manual is E-currently in the final stages of the revision process.
E-IEEi-01/97-004 Open Per the Ameron QA Manager on 5/16/97, the situation has been documented and placed in Mr. Wilson's qualification file for future reference. It is requested that Ameron provide g
a copy of subject documentation to WCNOC/SQ by 7/1/97.
3 I
l 280031
$p
's
[
P. O. Box 411/ Bunington. KS 66839 / Phone:(316) 3S4-8831 Od,J(D
. A Aa h"*8 n portunrty Employer M/F/HCNET o
9705290087 970520 PDR ADOCK 05000482 P
PDR 1
j
l'r l
QS 97-0024 1'
Y l
01/97 005 Open Per the Ameron QA Manager on 5/16/97, the Work Instruction for Intemal audits and Management Reviews has been revised and will be implemented during the next audit and review. It is requested that Ameron provide a copy of the subject Work Instructions to WCNOC/SQ by 7/1/97.
01/97-006 Open Deteiled corrective action status update due 7/1/97. Per the Ameron QA Manager on 5/16/97, the four procedures are currently in the revision process.
01/97 007 Open Detailed corrective action status update due 7/1/97. Per the Ameron QA Manager on 5/16/97, procedures are currently in revision process.
01/97-008 Open Detailed corrective action status update due 7/1/97. Per the Ameron QA Manager on 5/16/97, procedures are currently in revision process.
l 01/97-009 Open Detailed corrective action status update due 7/1/97. Per the Ameron QA Manager on 5/16/97, the in-coming audits of all calibrated equipment refer to calibration validation by Ameron's in-house standards, traceable to NIST. However, j
Ameron must ensure that in-house validation of calibrated equipment will be conducted in accordance with approved procedr e.
01/97-010 Open Detailed conective action status update due 7/1/97. Per the Ameron QA Manager on 5/16/97, the corrective action target date has been pushed out one month due to schedule slippage of a computer system installation. WCNOC requests that i
Ameron concentrate its efforts on the immediate corrective actions that are separate from the installation of the computer system.
01/97-011 Open Detailed corrective action status update due 7/1/97. Ameron noted that all calibrations were brought up to date, as of 4/28/97. Per the Ameron QA Manager on 5/16/97, no M&TE was found to be out of tolerance.
i Should you have any questions about the evaluation, please contact me at (316)364-4156 or Mr. Vic Canales, Supervisor Supplier / Materials Quality at (316) 364 4214.
Sincerely, 1
f W
i l
Terry L. Krause j
Supplier Quality Specialist !!!
Attachment:
Ameron Corrective Action Status Report cc:
V. J. Canales (AE-SQ), w/o US A350 File
'~
J. D. Kitchens (AE-PUR), w/o
.oraC Membership, w/a W. B. Norton (CC-PIA), w/o Vault (CC DS), w/a D. G. Long (AE-ME), w/o Docume.a Services (CC-DS), w/o R. L. Traudt (CC DES), w/a i
i I
l l
i
$@$0@@7 4 so.wg d A
J-By: %
AMERON INTERNATIONAL I
l Paartcirvs COAT Ncs GnoUP l
11605 Vimy Ridge Rrad i
Little Rock. Arkansas 72209 RO. Box 192610 Little Rock, Arkansas 72219 2610 Me/1*1997 Telephone:501/455 4500 Far 501/455-3061 Intemet:www.ameron net.com Wolf Creek Nuclear Operating Corporation E mail: wsloane@aol. corn P.
O. Box 411 Burlington, Kansas 66839 Attention: Terry Krause, Supplier Quality Specialist Subject Corrective Action Status Report 4
Dear Mr. Krause,
Per your request please find attached a Status Report identifying the progress that Ameron is making with our Corrective Action Plan to address the Nonconformities identrfied during you recent audit. As you can see by the attached report, the implementation of the corrective actions have meet or were earlier than the proposed completion target dates for that respective corrective action. I expect that we shall remain on schedule.
As you know, several of our Corrective Action Plans hinge on the installation of the new business computer system. The computer system project appears to be remaining on schedule and should not have a detnmental effect on our Corrective Action schedule.
The additional response you have requested on 01/97-008 is as follows: we are incorporating the requirement of either MIL STD 45662A or ANSI Z540 in all Ameron Purchase Orders issued to calibration suppliers (Note 1).
Conceming 01/97-009, as we have discussed previously, Ameron is implementing an ina:oming audit of all calibrated equipment. This should eliminate the requirement of doing On srte audtts for these l
particular vendors (Note 2).
On finding 01/97-004A conceming Bill Wilson's Lead Auditor Certification, we have contacted B. Wilson. He has indicated that he does not possess a copy of his Lead Auditor Certificate and that l
he had given it to Ameron Human Resources for their recon!s B. When's Human Resource files in both Brea and Little Rock have been investigated and no cedit cate has been located. The personal files that B. Wilson left with Ameron when he resigned have been gone through and no certrficate has been located. We have exhausted our avenues of investigation in this matter and conclude that we will not be able to supply this document.
l If you have further questions or require additional information, please contact me.
l I
Sincerely, A
~/
icheal Lamb uality Assurance Manager l
RON Number Completion Target Corrective Action Status DB 01/97-001-1 6/30/97 Open 01/97-001-2 7/31/97 Open 01/97-001-3 7/31/97 Open 01/97-001-4 7/31/97 Open 01/97-001-5 6/30/97 Open 01/97-001-6 6/30/97 in Process, Current copies of Work Instructions are being reviewed.
01/97-002-1 2/25/97 Completed 2/25/97 01/97-002-2 6/30/97 Open 01/97-002-3A 2/25/97 Completed 2/25/97 01/97-002-38 9/30/97 Open 01/97-002-4A 7/31/97 Open 01/97-002-4B 7/31/97 Open 01/97-003-1 5/15/97 in process, Procedure text completed, chart under revision.
01/97-004-1 5/15/97 Historical Lead Auditor CertMcation Unattainable.Hote1.
01/97-004-2A 3/31/97 Completed 2/25/97 01/97-004 28 5/15/97 Completed 3/31/97 01/97-004-3 4/30/97 Completed 4/28/97 01/97-005-1 5/15/97 Open 01/97-005-2 7/31/97 Open 01/97-006-1A 6/15/97 Open 01/97-006-1B 6/15/97 Open 01/97-006-1C 7/15/97 Open 01/97-006-1D 7/15/97 Open 01/97-007-1 5/15/97 in process, Current copies of Work Instructions are being reviewed 01/97-007-2 5/15/97 Open 01/97-007-3 6/30/97 In process, Multiple PO's being reviewed to establish required information categories 01/97-008 1 6/15/97 Open 01/97-008-2 4/30/97 Completed 4/1/97. Hote 2.
01/97-009-1 6/15/97 Open 01/97-009-2 5/15/97 Open 01/97-010-1 9/30/97 Open 01/97-010-2 9/30/97 Open 01/97-010-3 8/31/97 in process, MIS request has been made.
01/97-011-1 4/30/97 Completed 4/28/97 l
01/97-011-2 2/19/97 Completed 2/19/97 01/97-011-3 10/15/97 Open 01/97-011-4 10/15/97 Open Suggestion #1 4/30/97 Implemented 4/10/97, Work instruction being wntten.
Suggestion #2 7/31/97 in Process, containers are being investigated e Page 2