ML20141F898
| ML20141F898 | |
| Person / Time | |
|---|---|
| Issue date: | 11/19/1985 |
| From: | Wiggins E NRC OFFICE OF ADMINISTRATION (ADM) |
| To: | Banks D ARMY, DEPT. OF, CORPS OF ENGINEERS |
| Shared Package | |
| ML20141F896 | List: |
| References | |
| CON-FIN-D-1001-6, CON-NRC-02-83-046, CON-NRC-2-83-46 NUDOCS 8601090585 | |
| Download: ML20141F898 (2) | |
Text
6 c,# *%,
UNITED STATES 21 NUCLEAR REGULATORY COMMisslON e
WASHINGTON, D.C. 20555 NOV : 9 1985 U.S. Army Corps of Engineers Waterways Experiment Station Attn: Don C. Banks, WESGR/GL P. O. Box 631 Vicksburg, MS 39180
Dear Dr. Banks:
Subject:
Interagency Agreement No. NRC-02-83-046, " Criteria for Evaluating Engineered Facilities," Modification No. 5 This modification is issued to extend the period of performance and to increase the total amount obligated to the subject Interagency Agreement.
Therefore, the following changes are nereby incorporated:
1.
Article I - PERIOD OF PERFORMANCE, delete the date " September 30, 1985" and insert " October 31, 1985 " in lieu thereof.
2.
Article III - Estimate of Cost, delete the amount "$447,000.00" and insert "$450,000.00" in lieu thereof.
3.
Article IV - Oblisation of Funds, delete the amount "$447,000.00" and insert "$450,000.00" in lieu thereof.
These additional funds are chargeable to the following appropriation data:
B&R Number FIN Number 50-19-03-02 D1001-6 As a result of this modification, the total amount obligated to this Intergency Agreement is increased by $3,000.00 from $447,000.00 to
$450,000.00.
All other terms and conditions remain the same.
8601090585 851202 PDR CONTH l
NRC-02-03-046 PDR e
I.
e,
's U.S. Army Corps of Engineers 2
If this modification is acceptable to the U.S. Army Corps of Engineers, please so indicate by having the. authorized personnel sign in the space provided below on three copies and return two fully executed copies to me.
The third copy is for your retention.
I l
Sincerely,
- 1>
- f,.--
Elois Wiggin
- j Contracting Officer
~
I ACCEPTED BY T S. ARMY CORPS OF ENGINEERS:
By: _
fMA
'W.'F.'MARCUSON', III
Title:
chief, Geotechnical Laboratory 3
Date:
_2 December 1985 i
l G
S
.y n
---,e,,.
_-_.,yr-w.~_-r s.
_