ML20141F898

From kanterella
Jump to navigation Jump to search
Ltr Contract NRC-02-83-046,Mod 5,increasing Total Amount of Funds Obligated & Extending Period of Performance to 851031, to Criteria for Evaluating Engineers Facilities
ML20141F898
Person / Time
Issue date: 11/19/1985
From: Wiggins E
NRC OFFICE OF ADMINISTRATION (ADM)
To: Banks D
ARMY, DEPT. OF, CORPS OF ENGINEERS
Shared Package
ML20141F896 List:
References
CON-FIN-D-1001-6, CON-NRC-02-83-046, CON-NRC-2-83-46 NUDOCS 8601090585
Download: ML20141F898 (2)


Text

6 c,# *%,

UNITED STATES 21 NUCLEAR REGULATORY COMMisslON e

WASHINGTON, D.C. 20555 NOV : 9 1985 U.S. Army Corps of Engineers Waterways Experiment Station Attn: Don C. Banks, WESGR/GL P. O. Box 631 Vicksburg, MS 39180

Dear Dr. Banks:

Subject:

Interagency Agreement No. NRC-02-83-046, " Criteria for Evaluating Engineered Facilities," Modification No. 5 This modification is issued to extend the period of performance and to increase the total amount obligated to the subject Interagency Agreement.

Therefore, the following changes are nereby incorporated:

1.

Article I - PERIOD OF PERFORMANCE, delete the date " September 30, 1985" and insert " October 31, 1985 " in lieu thereof.

2.

Article III - Estimate of Cost, delete the amount "$447,000.00" and insert "$450,000.00" in lieu thereof.

3.

Article IV - Oblisation of Funds, delete the amount "$447,000.00" and insert "$450,000.00" in lieu thereof.

These additional funds are chargeable to the following appropriation data:

B&R Number FIN Number 50-19-03-02 D1001-6 As a result of this modification, the total amount obligated to this Intergency Agreement is increased by $3,000.00 from $447,000.00 to

$450,000.00.

All other terms and conditions remain the same.

8601090585 851202 PDR CONTH l

NRC-02-03-046 PDR e

I.

e,

's U.S. Army Corps of Engineers 2

If this modification is acceptable to the U.S. Army Corps of Engineers, please so indicate by having the. authorized personnel sign in the space provided below on three copies and return two fully executed copies to me.

The third copy is for your retention.

I l

Sincerely,

  • 1>
f,.--

Elois Wiggin

j Contracting Officer

~

I ACCEPTED BY T S. ARMY CORPS OF ENGINEERS:

By: _

fMA

'W.'F.'MARCUSON', III

Title:

chief, Geotechnical Laboratory 3

Date:

_2 December 1985 i

l G

S

.y n

---,e,,.

_-_.,yr-w.~_-r s.

_