ML20141F196
| ML20141F196 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 11/27/1985 |
| From: | Wallace P TENNESSEE VALLEY AUTHORITY |
| To: | NRC OFFICE OF RESOURCE MANAGEMENT (ORM) |
| Shared Package | |
| ML20141F202 | List: |
| References | |
| NUDOCS 8601090025 | |
| Download: ML20141F196 (1) | |
Text
r 5<f>- 3 M TENNESSEE VALLEY AUTHORITY Sequoyah Nuclear Plant P. O. Box 2000 Soddy-Daisy, Tennessee 37379 November 27, 1985 Nuclear Regulatory Commission Office of Management Information and Program Control Washington, DC 20555 Gentlemen:
Please find enclosed revisions to the Monthly Operating Report for the months of July, August, September, and October 1985.
Corrections were made to the unit two " Operating Data Report," item 17
- Gross Generation. The monthly gross generation reported for July 1985 was in error; therefore, the correction affected all reports through October 1985.
Very truly yours, TENNESSEE VALLEY AUTHORITY
}"
P. R. Wallace Plant Manager Enclosure cc (Enclosure):
Director, Region II INPO Records Center Nuclear Regulatory Commission Suite 1500 Office'of Inspection and Enforcement 1100 circle 75 Parkway 101 Marietta Street Atlanta, CA 30339 (1 copy)
Suite 3100 Atlanta, GA 30323 (1 copy).
Director, Office of Inspection and Enforcement Nuclear Regulatory Counaission Washington, DC. 20555 (12 copies)
Mr. A. Rubio, Director Electric Power Research Institute P. O. Box 10412 Palo Alto, CA 94304 (1 copy) 8601090025 851127p Mr. R. C. Goodspeed
[A O
MNC 461 Westinghouse Electric Corporation Pittsburgh, PA 15230 (1 copy)
Mr. K. M. Jenison, Resident NRC Inspector Sequoyah Nuclear Plant i) 1983-TVA SOTH ANNIVERSARY An Equal Opportunity Employer