APR I
1986
In Reply Refer To:
Docket: 50-298/86-05
x
Nebraska Public Power District
ATTN:
J. M. Pilant, Manager, Technical
Staff-Nuclear Power Group
P. O. Box 499
Columbus, Nebraska 68601
Gentlemen:
This refers to the inspection conducted by Mr. R. E. Baer of this office during
the period February 24-28, 1986, of activities authorized by NRC Operating
License DPR-46 for Cooper Nuclear Station, and to the discussion of our findingt
with Mr. G. R. Horn and other members of your staff at the conclusion of the
inspection.
Areas examined during the inspection included selected segments of the radiation
protection program. Within these areas, the inspection consisted of selective
examination of procedures and representative records, interviews with personne*.,
and observations by the inspector. These findings are documented in the
enclosed inspection report.
Within the scope of the inspection, no violations or deviations were identified.
However, we are concerned regarding the large turnover of health physics
technicians and the decline in effectiveness of the ALARA prcgram as noted in
paragraphs 5 and 7 of the enclosed report. As a result, you are requested to
respond, in writing, within 30 days of the date of this letter regarding actions
that will be taken to remedy these problems.
One unresolved item is identified in paragraph 5 of the enclosed inspection
report.
We have also examined actions you have taken with regard to previously identified
inspection findings. The status of these items is identified in paragraph 2 of
the enclosed report.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
Odci-d gne n,
J. E. Gre:co
J. E. Gagliardo, Chief
Reacter Projects Brancn
Enclosure: (see next page)
A
n
0
cf
h
D:Dh5
RIV:FRPS
C:
C:RP /
C:RPB
REBaer
BFurra b
RLBangart
JPJaudon
JEGagl
do
3 /y,/85
C$/p/8
c1/f)/86
3/p/86
.3/3/
8604070305 e60401
[
U
[^
i
t
J
_
_
9
,,
.
Nebraska Public Power District
. 2-
4
. Enclosure:
-
-
Appendix - NRC Inspection Report
50-298/86-05J
cc w/ enclosure:
Guy Horn, Division Manager-
of Nuclear Operations
Cooper Nuclear Station
P. O. Box 98
Brownville, Nebraska 68321
Kansas Radiation Control Program Director
Nebraska Radiation Control Program Director
y
bcc to DMB (IE06)
bec distrib. by RIV:
' * RP B
DRSP
- Resident Inspector
R. D. Martin, RA
- Section Chief (RPB/A)
- D. Weiss, LFMB (AR-2015
- R&SPB
- RSB
- MIS System
- R. E. Baer
- RIV File
- B. Hurray
- RSTS Operator
R. L. Bangart
- w/766
l
l
!
,
l
t
- - - -
-
- . . - - . - - -
y-.wr._,-ym-.
,-----m...w
., -- r - , .- - . , .c.-,-
+,
c..,...
---.m...,
.-- .
, - - - _ ..-
.-s