ML20141B955
| ML20141B955 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 05/14/1997 |
| From: | Desmond N BOSTON EDISON CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20141B960 | List: |
| References | |
| BECO-2.97.051, NUDOCS 9705160080 | |
| Download: ML20141B955 (1) | |
Text
.
Tech. Spic. 6.9.A.2
'SA
(]
Boeton Edieon Pilgrim Nuclear Power Station Rocky Hill Road Plymouth, Massachusetts 02360-5599 May 14,1997 BECo Ltr. 2.97.051 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Docket No. 50.293 License No. DPR-35 April 1997 Monthly Report in accordance with Pilgrim Nuclear Power Station Technical Specification 6.9.A.2, a copy of the Operational Status Summary for Pilgrim Nuclear Power Station is provided in Attachment #1 for your information and planning. Should you have any questions conceming this report, please contact me directly.
In addition, Attachment #2 is the second in a series of reports on the progress of establishing a replacement location for the South Weymouth Naval Air Station (SWNAS) Reception Center. These reports will be. submitted on a monthly basis until the new reception center is functional.
I N. L. Desmond Regulatory Relations Group Manager RLC/dmc/radmisc/297-mrpt Attachments: #1 April 1997 Monthly Report
- 2 Progress report on the South Weymouth Naval Air Station Reception Center.
f cc: Mr. Hubert Miller l
Regional Administrator, Region I 1
U.S. Nuclear Regulatory Commission 475 Allendale Road d
gh King of Prussia, PA 19406 Mr. John Lusher U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Senior Resident inspector 1
i 11 illl llllllll ll!ll
. _ mn 9705160080 970514 PDR ADOCK 05000293 R